Thank you. It's 7 o'clock on November 4, 2026. The Planning Board is reconvening after having met with the Board of Public Works for a Scenic Road tree hearing. Just to be clear, I will take roll call again. Jesse Newberry. Here. Robin Borgestedt. Here. Ira Montague. Yes, here. Bill Sterling. Here. Annette Lewis here. Thank you. The agenda for this evening is public comment, then a vote on PB2606, 200 Commonwealth Road daycare facility. We have to determine some waiver, whether... To vote on or accept requests for waivers, even though we haven't seen the project yet. Then at 715, continued public hearing on the 8787A Stonebridge Road, MWRA Haltman Aqueduct Corridor for treatment plant and for A water pump station on Castle Road. This is part of the DPW's connection to the MWRA. Then at 8.15, we have an A&R plan to review, PB2607 for 231 Cachetuit Road. Then at 8.30, we have a continued public hearing for PB2605, 8 Partridge Road. I'm sure those two are just flip-flop the times. It's 8.15 is the continued hearing for Carcass Road. I fixed the agenda to reflect what was voted at the last meeting. And at 8.30 is the A&R plan review. I'm sorry, 8.30 is A&R plan review? The A&R plan does not have a required time. Right. But the continued hearing was 8.15. It's 8.15. Correct. Okay. Sorry. No, you caught the mistake. I refixed the agenda just to make sure we're in compliance. Okay. I thought I had reprinted it. I guess I didn't. And then we're not going to be reviewing our draft minutes this evening because they're not ready, but we'll talk about it later. And then updates from the town planner and chair, board comments and concerns, and then adjourn. So, is there any public comment on anything that isn't on the agenda this evening? No, I don't see anybody with their hand raised. Okay. 7-10 was about the submitted site plan waivers. I do know the applicants are in the... I mean, I'm sorry. No, I'm sorry. That's in our app concern in the audience. Actually, the app, the engineer for that project is... I believe is in the audience. This request at 710, I know we're jumping a little ahead, but there's no real legal time to have this, it's not public hearing. This is a requirement, as a background, this is a requirement in the by-law to have a waiver, a vote on the waivers before they're granted, and within, I think it's within 30 days of this middle of the complete application. Now it gets a little tricky because we have the public hearing has not been open yet. So I provided you the waiver, the list of waivers. Now the bylaw does not say you have to grant the waiver. They say you must take a vote. So I would recommend voting to defer the waivers, the list of waivers, until you get to the public hearing so that you can determine if they're actually, which ones are actually needed. The requirement is that you need to take a vote, not They have to actually vote to grant all the waivers or deny waivers. Because if we don't, then you're automatically granted after 30 days. Correct. And that will be before the hearing. So I think that's a great idea, Robert. Everybody okay with that? Yes. Can I have a motion to, how did you say it, Robert? Defer. The voting of the... Deferring on the waivers until... Oh, the voting, deferring the granting or denial of any of the waivers until the opening of the public hearing, which is at December 2nd. Okay. Make it as simple as whatever you want. That sounds fine. Why doesn't somebody say so moved? So moved. Is there a second? Second. All in favor, we'll do it by roll call. Jesse Newberry. Yes. Robin Borgestedt. Yes. Ira Montague. Yes. Bill Sterling. Yes. Annette Lewis. Yes. We also have the PB2607-231 Considual Road AR Plan Review and Approval, which was at 8.30. I know we have about nine minutes, but I do see the apkin in the audience if you want to take that out of order. Because I have some comments on that A&R plan, and we can discuss that if that's the best time to do it now. Let me ask you, for the Stonebridge Road thing, though, that's a public hearing, and that has to start at 7.15. 7.15 or beyond. But the 8.15 hearing has been continued, so there's no... In my opinion, there's no complete rush. If it's at 715 or 720, the next hearing after is not going to happen tonight. There'll be a continuation of the 8th Parkhurst Road. The applicant has asked for a continuation at 815 or... Wait a minute. I'm getting a little confused. Sorry. So, we've just done 710. Correct. Was there for 7.10. The next thing is supposed to start at 7.15. 7.15 or later. I mean, you can't start any earlier than 7.15. Yeah, and it's 7.07 right now, and it's going to take us more time on the A&R thing, I think. Up to you. Well, let me give an update on the continued hearing. Okay. When we get to the A15, then we can do official continuation of that. The APKIN is working with the Billing Department to review the changes under Mass General Law to determine if what they want to do would not require them to go back to the Planning Board. So they are trying to figure out another solution under Mass General Law with the new non-conforming lots expansion special permit. They're looking at options that would not require them to have to come back to the Planning Board. They've asked for a continuation to the next meeting. I asked them to write a continuation to December 2nd so that we're not continuing it every two weeks and give us a month. And the applicant's lawyer was okay with that. And he's okay with continuing that month. Is Town Council going to be involved in these discussions? I don't, I would request that Town Council be involved. I can let the Boeing Department know. I'm not, I have not been part of the discussion. Yes, no, I just, I understand, but it's all new stuff. I believe that they have, but I will, I will, I will confirm. Okay, so we can vote. To continue it until the second. Is that lawyer here this evening or not? No, I don't think he won't be here today. Okay. He sent an email today after. Okay. I'm not excited about continuing and continuing and continuing. If he's not going to be ready for the next meeting, then I think we should be done and he should start over. All right. I can let him know that. This is the last continuation. And the board is going to, would like to hear it. If not, if not, they're going to have it being with John. I think that's fair. I think they're just trying to wrap a few things up and they just need it. Yeah, that's fine. Can I have a motion to continue PB2605, 8 Partridge Road until December the 2nd? Do we have to have a time for that or not? 8.15. We have a public hearing at 7.15. 8.15. At the same time, 8.15. Okay. So moved. Ira got it. Seconded. All in favor by roll call. Jesse Newberry. Yes. Robin Borgestedt. Yes. Ira Montague. Yes. Bill Sterling. Yes. Annette Lewis. Yes. What hearing do we have at 7? On whatever it is on December the 2nd. On the Commonwealth Road site plan approval for the Garland Days, the day care of school. So that's December 2nd. 7-15. Back to updates. We have formed a housing aid. 2027 Housing Production Plan Steering Committee, which we have, Robin has volunteered to join that committee, or steering group, walking group, it's an astronaut committee. They're having their first public forum or discussion on December 1st. It's from six to eight o'clock. And that's to kind of give an introduction of what the project is. There'll be coffee refreshments and snacks available. And that will be hosted hybrid, but also in the Wayland Commons room in the town hall, the old COA. And whose name will it be under? Will it be under Planning Board? I think it'll be under... Steering Committee or the, be hosted by the Planning Department. As the Planning Department is the one working with the consultant. The Steering Committee hasn't actually met yet. We're trying to meet maybe the next few weeks before Thanksgiving, but we'll see if that actually happened. But it's not, it will not be hosted by the Planning Board, it'll be hosted by default by the Planning Department in the town. Okay. Will they deliver food? I am in charge of, we're discussing about food. Right now we're trying to figure out what's the best idea. I'm hoping that Liberty Pizza is open. Maybe we can get to have pizza and buy pizza and have like soft drinks and coffee and stuff. But they won't bring it to your house, right? Who won't bring it to the house? It's your remote. Robert? It's going remote. Oh. If you want me to drop off pizza, I can drop one pizza off of your house, Robert. Okay. Robert, I just want to go back. I have that Hobbs Road is on December the 16th. Correct. 715. That's correct. Right. But we just continued. 7.2nd. December 2nd. But you said we had another hearing at 7.15 on the 2nd. Yep. What is that? 200 Cumberland Road, the daycare. I'm sorry. Thank you. Sorry. That's at 715. Yep, got it. Sorry. Yep. Okay. Also, we're now working on finalizing the peer review consultants for that project, Traffic and Civil, and I received a few peer review score works, and so we're just finalizing that using the master contract. That we have with traffic and for instead of a peer review for stormwater. So we are getting close to that. Okay. I'm trying to think of any more updates within the next two minutes for the public hearing. I have an update. I just wanted to be clear. When we did the decision for the town center, there... The applicant asked a question and they were wondering why under the master special permit we were only approving reducing it by eight parking spaces. And that's because the master special permit dealt with a total number of parking spaces that were not on street parking. And the master special permit Dealt with parking spaces that were on street parking. So it was two different decisions that we were amending. And that will continue to be an issue for you as you go forward. And you're going to need to make sure that you know when you're amending a master special permit, when you're changing a phase one approval, and essentially you do that in a phase two approval. It's very confusing. I've got a bunch of memos that I've shared with Robert over time, so just keep that in mind. Who are you telling us to? All of you. Because I might not be here forever. It is 7.15. Okay. 7.15. Robbie, can you promote Matthew O'Dow and Chris and Ryan from the audience, please? And Tom Holder. I will just give you a quick update on this as we open this hearing, what the material that we received. There's been two public comments from building department, from staff comments from building and fire. Also, we received a updated packet of, the whole packet of information of the project. for offshore plants, site plans, stormwater, all that. And we also received today an updated traffic impact on site analysis. And then later today, we received also a second peer review report, which has been sent out to all parties involved. So that is all the information I have updated from within the last public hearing. Okay. I'm going to call the hearing to order for PB 2603, Continued Public Hearing, 87 and 87A Stonebridge Road and the MWRA Holtman Aqueduct Corridor. It's for Town of Wayland for site plan for proposed construction of a new 1.3 million gallon per day Happy Hollow Water Treatment Facility and a new Castle Road pump station within the MWRA Holtman Aqueduct Corridor. Has just, have the members of the Planning Board been able to at least peruse the new materials that we've received? Yes. Okay, good. No, I haven't been able to. We just got them recently. Yeah, we got, yes. Well, we'll get an update, but I think the questions that were open aren't anymore. Tom, do you want to, or Matthew, just do a quick overview of what we've received and what you've done? Yeah, I think I would ask that Matt comment on that as he was the one that put it together and distributed it to the Planning Board. So Matt, if you could, thank you. Sure. So, yeah, just to update everyone, on October 28th, last week, we followed up with some revised plans, a comment response letter to address Dulles and Roy's third-party comments, updated lighting calculation plans, the sound attenuation figure, a traffic impact and site analysis was also provided on October 28th. Robert mentioned that there was a small update to that, which we sent also today. And then the updated stormwater design report as well. So these address the various comments, of course, from the third party review and also some of the concerns that we heard raised across these meetings that we've had with the Planning Board. We're happy to dive into any of the details on them. We also have a short PowerPoint presentation to kind of do an overview of that timeline, if that would be helpful for everyone. Yeah. Before we do that, is there anyone on the board who has any specific questions that they want answered? No, I think there are things I anticipate being addressed in their comments. Okay. Okay, you want to do that, Matthew? Sure. I'll set up the apologies. I'll just have to share my screen here. Bill, can you put your name up? It just says Planning Board. Do you know how to change it up in the right-hand corner? Click on the three dots. All right. Can everyone see the screen here okay? Yep. Yep. Okay, great. All right. We just have a few slides here just to kind of give, like I said, an overview of the timeline and everything. So the last we all met together was on October 7th, and we briefed everybody on the intended revisions, which have now since been reflected in that submittal on October 28th. So there's a slight reduction in the Castle Road Pump Station building footprint caused by moving the construction to a prefabricated building. That'll also simplify and reduce the timeline of construction as well as construction impacts. Additional Edits that we've made to the landscaping and the fence height. We have some updated renderings today to show how we've kind of mitigated any possible concerns about the sightline off to the right when pulling out from Castle Road into Old Connecticut path. And then we had these figures last time. The 60 decibels does not leave the property. The lumens don't extend past zero, past the parcel boundaries. And then the stormwater design report was just updated with the checklist stamped. The 60 decibel number that you're using, is that the DEP's number? No. No, it's just a reference point for the noise level that the neighbors can expect when the generator or the pumps come on, but there's no, as far as I'm aware, DP. There is at the boundary of the property. Okay. What you're saying, Annette, is that it shouldn't reach over 60 dBs at the edge of the property? I don't know what the number is. That's why I was asking if that's what he's pulled it from. Okay. It's under the, I think it's in the air regulations. Gotcha. Okay, we can certainly look into that and make sure that we're not exceeding anything from DEP there. In addition to that, we've developed a landscape plan for Happy Hollow for the conservation filings since there's some requirements about tree removals up there to comply with Chapter 193, 194 requirements. Some of those came up in the third-party review letter.
All right. So this is the landscaping plan that we submitted to Conservation Commission. There's definitely a lot here. Kirsten, I don't know if you have anything to add to this, but I guess I'll just... You're looking at Happy Hollow right now as compared to the other site. Yep. This was just kind of a, you know, FYI because...
We just wanted to let you know that we worked with the Conservation Commission on the Happy Hollow site to provide planting and tree removal impact mitigation, I should say. But we'll next few slides look at the Castle Road site in more detail. So this is what we had on October 7th, what we had presented at that time. We significantly reduced the... The footprint of the guardrails and the fencing. Soften the sightlines, add some landscaping, pulled the fence back. The septic system was removed. The variance was received earlier this week. So we can confirm for everyone today that there will be no bathroom there. So there indeed will be no reason for any septic or tight tank there. The generator was put into a kind of a better spot behind that building. We made sure that there's enough space behind this blue area here, if I can find my laser pointer, right here for some pedestrian access.
This was the rendering at that point in time. So just I'll jump ahead a little bit. I'll point out that this tree is tagged for removal, like we stated last time. And also from the October 7th meeting, we decided that these trees could be removed also to try and mitigate any sightline concerns. This was the very, very first meeting back in September with the objectionable privacy slots on this fence.
So that was the improvement between those two points in time. As I stated, some of the shrubs and trees were removed here. From the October the 7th plan. Yep, exactly. And the fence, that circle section of fence height was reduced. Yep. So right here, we've removed, excuse me, we've, like Kirsten said, reduced that to four feet. And there's a gate there that you didn't have before. I think the fence was there before, yeah. It's for lawnmower access, basically. And one of the plans, I thought it was for snow storage as well. Yeah, this area here will basically be snow bank area for the driveway. So this is the up-to-date rendering as of today. So you can see we removed some of that landscaping and reduced this height of the fence here while keeping this sort of residential character and landscaping appearance in the front of the yard here. I also noticed that the tree has been removed as well. Yeah. The future tree removal is reflected here on that corner tree.
So I did go through a lot of stuff. I can pause here for a moment. Some following slides, we have traffic site analysis. If there's nothing, I'll keep it moving. There's just one more slide, actually. Okay. Which is the traffic site analysis. So here's our sight lines. On October 7th, this was the status here, 14.5 feet back. You could see the appropriate distance.
Matt, just one clarification. That's the analysis, and this is not my specialty area, but the traffic engineers looked at AASHTO standards, and the required sightline in this type of situation would be 14.5 feet. And our design on October 7th provided 18.5. So even On October 7th with the shrubs that we've now since deleted, there was, you know, four additional feet of sightline than the minimum. And then on the right here you see, you know, we inadvertently, so we did update this before October 28th, but I noticed today that that letter for this final sightline analysis didn't get submitted. So this is, this should have been submitted on the 28th and we're showing it here now for you, which shows that it has. Almost 28 or 27 feet of sight line. So it's much more than the minimum required. Looking to the south? Yes, southwest, yeah. I think you also said in your reports, both of them, that it's only this location where you're doing work that is really subject to the sight line. The other side of the street, if you're looking north, has some real topographical issues. And I believe that the director, the DPW director, has committed to putting signage there to warn people that there's a street there. Yes, that is correct. Okay, thank you. Is there anything else that can be done to improve the sight lines going to the north? During a recent site visit that I made, and I know I had mentioned this, we had the property owner at the meeting, and I had mentioned that one of the most noticeable improvements that could be made to sight lines looking to the east would be the removal of some of the vegetative matter that's there. There is some plantings. Really just kind of brush that if that were to be removed, you would significantly improve the sight lines looking to the east. So I know that I had mentioned that. I think the reply was that as much of that that could be done had been done. But I think I would also just stress tonight that it did appear that more could be done. And I think it would improve the site line situation tremendously. And where that is, it's not in the right of way? It is not in the right of way. Okay, thank you. I don't have the ability to do it. Right. I'd be happy to work with the property owner. You know, in collaboration, we could help remove it. But yeah, it is on their property and would be in their control to at least approve that. Okay, thank you.
So this, you said, was your last slide of questions and discussion. Okay, board. I'd like to know if anyone on the board has any particular questions that they'd like to ask and get resolved.
Robin, do you have anything? No, I think I'm pretty happy with how responsive they've been in terms of the landscaping and the fence and things like that. So, no, I'm pretty satisfied. Okay, Ira? Not really. I may have missed this, but is there a house nearby or is it just property around it with no buildings? I'm sorry. Where are we talking about? There are houses on? The road. But right next to the, right next to the pump station itself. Oh, it looks like the road. No. Just to the right, where you see that white fence, just to the right of that is the nearest house. Okay. And then there's the house across the street. Yeah. Okay. Directly across the street. Yeah. Okay, got it. Okay. Anything else, Ira? No. I'm good. Thank you. Okay. Jesse? No concerns. Okay. Bill? I think this is an important improvement over the last presentation, and I agree with Robin. I'm happy with the engineer's response. Okay. I noted on one of the plans, it said subject to MWRA approval. Is this, I mean, how far along are you with the MWRA on this? Kirsten, I don't know if you have. Yeah, I would say we've been really closely coordinating with them. We've provided a copy of the latest plan to them. We know what their main concerns are. I believe our next meeting with them is on November 16th. So we should be able to get some feedback at that time. They haven't yet provided us feedback on what we've provided here, but. We're reasonably sure that they won't have any issues with it. Their main consideration is separation from the pipeline. That's really their main consideration. I just want to confirm some things that I believe we already know, but I just want to make sure for the decision. All the utilities are underground. Is that correct? I believe so. Right, Matt? Yeah, that's correct. Yeah, there's process piping inside the buildings. Okay. And the number of external light fixtures on the pump station building, I believe it looked like three? That's correct. Yep, it's three. And they're all downward facing. Yep. Sky compliant. I asked that already. The color and material of the pump station building and the treatment plant, is that something that we have or we don't have? I thought we had a picture, but not descriptive language. Yeah, that's been sort of presented in these meetings as well as the Design Review Advisory Board gave some feedback on that. So the intent is to have a wood textured vinyl siding for the Castle Road Pump Station with the color that's appeared here. And we can follow up with like a letter response if that would be necessary for that piece. That would be helpful. Sure. I'm just writing myself a note. Okay.
Okay. We had talked at one point about the electrical and communication equipment antennas, and we'd asked how tall they were, and I don't know that we ever got an answer. Yeah, we can follow up with an answer to that one as well. Okay. For removal of the tree on the, I guess it's southeast corner of Castle Road.
Is that something that we can condition so that you will in fact do that? Is that the pine that's in the right of way? Yep. Yes, you can certainly include that in the decision, a tree hearing that was held just prior to this meeting that the removal of that tree was approved at the hearing. Oh, it was approved at the last year. Oh, good. One of the trees in there. Yeah, it was the tree in the shade tree list. Got it. When you guys departed and the Board of Public Works stayed on, they approved the removal of that tree. Okay, terrific. And then for the riverfront and wetland resource areas, I believe you said that they were going to be flagged prior to the start of construction. And I'd like to put that as a condition as well in the decision. And I think it's just at the Happy Hollow site. Yeah. Okay. For the construction time frame and period, you're going to be giving us a schedule. At some point, it'll be a condition that we have to have a schedule before you start. And so we'd know what is going on. But I'm sorry, I'm losing my trains of thought. Oh, for the when during the construction period, I believe it's you're not it won't. You won't be working that long on putting in the pump station because it's a small building and it's a prefab. Yeah, that's correct. Do you have any idea of approximately how long that would take to get that ready? Yeah, site work should be about a construction season. So starting in the fall, excuse me, in the spring, ending in the fall. The foundation will likely be about a month. As far as putting the building in, it'll be a day to drop it in place and probably another week of utility hookups. Okay. And for hours of construction, have you thought that through? I believe last time we presented, we said 7 a.m. to 5 p.m. You did. But you also said that you were going to try and stay away from rush hour times. And 7 might be fine. 5, aren't you getting into rush hour? You think rush hour is going to be enough there? I'm talking about Old Connecticut Path, mostly. Yeah, you're right. No, it does back up. You're right. Yeah, we will need to talk to the DPW about that. I guess I know any restriction on timeframes to increase costs. Robert, did you had an opportunity to discuss this with the DPW? And what did they say? Tom Holder, me and Tom Holder talked today about it, and he was okay with four. Now we're hearing five, so I'm not sure if it's placed in the middle at 4.30. I'm not sure what's the... Sorry, I just mentioned five because that's what we had stated at the last meeting. I believe that was on our slides from the last hearing. And I think that in knowing the area, I think that there's actually heavier congestion associated with the high school. So I think what we commonly think of rush hour is people commuting to work. So I think it's the high school, which it would be difficult to restrict a contractor to avoid school opening and closing, which that typically is 8 in the morning and 2.30 in the afternoon. So I don't think that having a 5 o'clock end time would be problematic only because I think The traffic that's experienced is not associated with commuter traffic so much as it is high school traffic. Okay. So you're talking about seven to five? Correct. And what about normally we put a prohibition in for no Sunday work and limited Saturday work?
Yeah, we would likely be able to work with a contractor. The only thing I can think of is if there was some sort of a delivery situation.
Whereby something happened, had to happen over a weekend to really, to make it less inconvenient to the area. I don't know if the... Delivery is one thing. The actual construction is something else, I think. That's how... No, there's about hours construction. It's usually 8, 7 to 4, and 8 to 3 on Saturday, and then no work on holidays and Sundays. So... I would imagine that that would be fine. 8 to 3 on Saturdays. Yeah. Okay. Robert, is there anything else that you can think of? No, I'm just trying to go with my notes. No, I think they did a good job of submitting some of the sound reports and the lighting report that show that none of the lighting is actually going over the boundaries of the lines. Okay. I guess at this point the question, well, let's open it up to the public for any comments and questions. If you have a question as an attendee, please raise your hand and we'll recognize you. You're okay? I'm just looking at the participant list. No questions. No comments. Good. The question at this point is, if I close the hearing, then the things that you said you would submit, we won't have. We could make them conditions and close the hearing, or we could wait for them and then draft the decision and close the hearing at our next meeting. I mean, if you were accepting of... Receiving these requested items, you know, making those conditional. If you were acceptable, the board was acceptable to that. I think that that would be preferred on the project team side. Okay. Robert, does that work, do you think? Yeah, I have a pretty good draft right now of the decision with conditions. Now we have to add a few conditions that we discussed tonight. Which I think one was about the tree in the right of way, which I was not aware that was part of the public shade tree, which is perfect. Flagging of the wetlands area. I have to fix the hours of construction. I had it down at five, four o'clock, but and then schedule. But yeah, I think we should be in pretty good shape. The one thing is, well, we have the picture, I guess, of the wood textured vinyl. And then we had the communication. You can always have the town or the EPDW come back. Once they actually finalize the Carling Scheme with the MDR or WRA, because I'm not sure if that... Yeah, and that's an issue as well. I don't want to hold back, but I also don't want to like... Yeah, I don't want to make anything more difficult for you. Do you recollect at one of the prior meetings, I thought, and there's a team member, Jen Necheman, I thought that we actually had identified the color. There was a name to it. It was actually perhaps recommended by the advisory board. Does anybody else recall that? I think you're right, Tom. I'm trying to find it. Yeah, I remember a slide and it actually identified, it better identified the texture and it also identified an industry color. I think it was the DRAP meeting. I remember discussing it and asking for it, but I have not seen a sample of that product that you've chosen. Well, we can certainly send that right along as soon as we get off the call. The height of the antennas, though, we won't know. Okay. Do we have that on a plan? No, you didn't. At least I didn't look that closely at the new plan. It wasn't on the last plan. Yeah, I mean, they could get deleted. It depends on the availability of fiber at that location. So the IT department, we've been in communications with them for the availability of fiber there. If there is radio necessary, then there would be antennas. So we could get the height that would be required. Or if you know approximately what it would be, we can say no taller than. Yeah, sure. If you knew that now. Again, I'm struggling with closing the hearing. Because we can't take anything after the hearing is closed. So we could approve a range, I think she's talking about. Right. Yep. Or no taller than. Right. I found the picture of the siding. I just, I can't, it's not large enough where I can read what the color is called off of it, so I don't know. But if it's on there, then that would be in the record, and you can just tell us tomorrow what it is? Yeah, we can tell you tomorrow. So let me try this. With the antenna, it won't be taller than 35 feet, right? No, that wouldn't be possible. I wouldn't want to say a number without speaking to our instrumentation designer for an electrical to be 100% sure, but... Okay, it'll be below... Yeah, it would be below 35 feet. We can commit to that. Okay. For sure. If it won't be any taller, then you can max and require that it can be no taller than 35 feet, which is the height. Yeah, or say that it will comply with. The height. So, Tom, you would prefer to close the hearing? It would be helpful. So that was, I know that Robert was talking about needing an administrative extension beyond, I think, this Friday was what. Maybe an earlier date was mentioned. So if we were able to close the hearing tonight with the conditions we've discussed tonight in knowing that you need a little bit more time to write up the decision, that's certainly understandable. Robert was talking about like two weeks or something like that. It's in pretty good shape, I think. Yeah. We need two weeks. So that would be, that would help us. Finalize the design and get that squared away because we have, you know, kind of a critical path scheduled to maintain. Yes. Yes, understand. So, Planning Board, are you all satisfied and ready to close the hearing? Are all your questions answered? Yes, if we know all the conditions we need to list or things that we have to say a maximum of, then yes. Yeah, I'm with Robin there too. Okay, Ira? Yes, I'm good. Bill? Yes, the only thing I recall in the color of the building that you had asked about was that I had suggested a driftwood gray siding and that the trim not be white. If anything, it should be slightly darker than the driftwood gray. That's what I remember from our meeting. So you can put that in your notes. That'll suffice for me. Just writing notes. If I could, yeah, I just, I remember from the Design Review Advisory Board meeting. Requesting that the board requesting a color similar to the bare tree trunks. Yeah, that's right. Yeah, it's like sort of a brownish gray, so. Right. And the big color might not be driftwood gray. I don't know. And that's, well, what's there, what you have. That was just a descriptive term. Gotcha. What you showed us now is lighter. It's a lighter color. Okay. I thought we were good with the color, but yeah, the trim will definitely not be white. It'll be dark. Okay. So are you also fellow board members ready to vote tonight? Yes, I am. Yep. Okay. So, well, you can decide if you want to vote first and then close the hearing or close the hearing and vote. Does anybody care? No. No. Okay. I'd like a motion to close the hearing for 2603, PB 2603, the site plan for proposed construction of a happy hollow water treatment facility and Castle Road pump station. So moved. Second. Second. All in favor, Robin Borgestedt. Yes. Ira Montague. Yes. Jesse Newberry. Yes. Bill Sterling. Yes. Annette Lewis. Yes. Okay, the hearing is closed. Now I'd like a motion to approve the site plan for continued public hearing. Well, for the Same thing. The new treatment plan at Happy Hollow and the Castle Road pump station. So moved. Second. With conditions discussed. Yes. And our standard conditions. Yes. So moved. Second. Okay. All in favor, Jesse Newberry? Yes. Bill Sterling? Yes. Robin Borgestedt? Yes. Ira Montague? Yes. Annette Lewis, yes. Thank you so much. It's been a pleasure working with you, and you've been very responsive. Thank you, and thanks, Robert. Can you send me a continuation of the deadline? I understand why Robert asked for two weeks, because he'd like the Planning Board to see the final decision before it goes out. Okay. And that would be fine, yes. And thank you all for your consideration. Appreciate it. Thank you. Okay, good night. Good night, everyone. Good night. Moving on. It was mostly about just by the workload. The workload has been very increased right now. So I want to make sure we had enough time to look it over. Okay. In case there's any kind of questions that came up. Okay. And perhaps we can just check in with each other tomorrow. Yeah, I did make this to the draft decision, and so it should be in better shape than it was yesterday when you sent it to me. Yeah, it looked like what you did was took the conditions from the school, Carroll School, but they don't have to deal with all the things that we have to deal with because it was a Dover amendment. I took out a lot of it. Got it. It needed things added, not really taken out. So what are we up to now, Robert? Are we at... We can go to the A&R planning because the engineer is present. Okay. And Park Ridge is okay too? Yeah, it's good. It's fine. Okay. Okay. This is PB2607. 231 Cachituate Road A&R Plan for review and approval by the Planning Board. Robby, can you promote J. Dan Brenzner? Thank you. Ira, I like what you've done to your house. While we were waiting, I just kind of decorated it quickly. I can do one for you, too, real cheap. Well, that guy, come on, the guy from the engineering firm, that obviously was not his house, so. Oh, you want competition? All right, how about this? Oh, man. All right, so I'm sorry. There's three lots. One, I'm going to blow it up so it's a little easier. It's an A&R plan. There's this lot here. I don't know if you can see my pointer. Paul Densner, Family Trust here. There's one lot down here, Tom J. Fay and Julie Fay. And then Paul Densner also owns this lot that has a great green line. The plan is to divide that to parcel A1 and parcel A2. And eventually, load B would be deeded back to these two property owners on Consididate Road. That's not really the main issue that I have. My issue is about the way that this is being shown and to make sure that it's shown very clearly. So when it goes to revise your deeds, it's accepted easily. We don't have any issues in the short of law term. I know I've gone back and forth with the engineer in this project about what should be displayed and what shouldn't be displayed. And I can also let him talk about it. And then we can open the floor to the board because I know the board members might have some other comments. Robert, when you said you have an issue with how it should be displayed. I believe there should be something because there's like the Z showing where the O line is. There's a green outline. I would be more inclined of having, like, the little, like, it looks like little Zs, like, yeah, Zs, like, the showing that where the. That it's going to be attached to the other properties. Yeah, that too. I'm, I'm kind of a. Stick it by the book. I really try to stick to what we have and what's been approved so that there's no like, you know, very similar. Right. Also, mention the note, the C note, and then read off for the board what the note says. Yes. Note 1, which is part of this, says the purpose of the plan is to divide A from Plan 1266 of 1952. 1950 into Apostle A1 and Apostle A2. Apostle A1 and A2 are not individually billable laws and are only to be used with a journaling property. I'm more into client of taking that note off and just putting not a billable law on here, but that's just my kind of my opinion. And there was something we had to get some going back and forth about frontage and the notes and stuff. So Planning Board members, do you have any concerns? I'm sorry, can I, should I present first before we get to the concerns or? Yeah. Okay. Good evening. My name is Dan Bremser. I'm a registered land surveyor with Hancock Associates. Thank you for seeing us tonight. The plan before you, Robert explained very well. Basically, Mr. Denninger owns a vacant lot between his lot and the Fay lot, which we've tinted in green. And what they would like to do is split it in half. Presumably, what will happen is that the southern half there will be sold to the Fays. I have gone back and forth with Robert on how to show the plan, and we've done a couple things here to try to make it clearer. Some of the things that happen in terms of doing the survey on this, we found out that the original survey for the Happy Hollow Road subdivision was very poorly tied into Contituate Road mathematically. There was a couple of feet floating one of the bounds out of the Catituate Roads out by three feet. We found fantastic agreement on the 1915 and I believe it's 1933 revision of a portion of Catituate Road. The monuments out there are agreed beautifully. And what we have to do as surveyors is we have to determine where the boundaries of the land are. And unfortunately, there weren't any. Called for monuments on the back of the green lot that we were cutting up. So we had to do a lot more survey than we normally do to tie everything down. It doesn't affect anything before the Planning Board, but it's mainly for other surveyors because the purpose of the plan from a survey standpoint is to allow any surveyor in the future to be able to reproduce the boundaries. And so we had to tie an awful lot more monuments than we normally do just because because of the disagreement The Contituate Road Survey and the Happy Hollow Subdivision Survey. But basically what it comes down to, so one of the things we did that Robert suggested and I agreed with him is we took out the lines that extended on all the abutters. We basically, we wanted to show the monuments that we tied on Rice Spring Road for other surveyors' benefit because there were some mistakes in some of the bounds that were set out there and it just... It was just something that surveyors do to show what they've done so other surveyors coming in after us will understand what needs to be done if any other lines are laid out. As far as, you know, one of the suggestions that Robert made and we had discussed was there are other plans that we do. For example, if we're doing compilation, a plan that compiles a number of smaller lots, a lot of times we'll show dashed lines where old lot lines are because they're being combined and we'll draw Z lines through them, which generally indicates that they're owned by the same person. In this case, Because what we're doing is dividing one individual lot and because drawing the plan does not... Put the onus on the people to actually sell it. After we've drawn this plan, they may or may not sell the lot, the parcels that we show. Parcel A2 may or may not be sold to Tom Fay, Tom and Juliet Fay. But so the lot itself and the description of the lot has to stand on its own. We wouldn't put Z lines through because that implies ownership. And I mean, we could with Paul's and A2 and A1, but I think that confuses things when A2 does get sold at a later date. So when we're dividing an individual lot... We generally show a solid line on the perimeter of the lot that we're working on. So the only lot that's being divided is the lot that's tinted in green, which it's called lot one on a plan from the 1950s. That lot and the lot to the north and the north of that are three lots that are shown on one A&R plan from the early 50s. So basically, that's why we drew the plan the way we did. And like I say, the plan is to most likely sell it to Tom Faye, but you never know what's going to happen. Like, for example, I never expected that Question 7 would have been approved in the elections the other night. Obviously, there's no sewer here, so you're not going to see 5,000 square foot lots until someday when sewer does go in. But there's all kinds of possibilities that can happen with land down the road. So we don't like to draw and assume that the lot is going to be sold. So it stands on its own. If the lot is sold, it would be sold. There'd be a meets and bounds description referencing this plan, discussing the... The boundary going around parcel A2 if it's sold to Thomas Fay. And then if he sells his property someday, it would reference two lots because his lot he got from one deed and this lot he got from another deed. And that's just, that's the way conveyances are done. But I'd be happy to answer any questions and take it from there. Board members? I have one. Picky legal question with that note one. So in and of itself, parcel A1 and parcel A2 are individually not buildable. Could... Each of those owners take their now over one acre lot and subdivide them into two half acre lots so that then it would become buildable as long as they added a slice of the existing lot. And if we intend for that not to happen, do we have to be more specific? So that's a really interesting question. And to be very honest, I'd have to sit down and do a lot of work to figure out if that's possible. It's a very interesting hypothetical question, but it doesn't really impact what we're doing here, which is basically to prove an A&R plan. So the purpose of an A&R is to divide a piece of land when you're not changing the frontage because... Basically, the reason for turning down an A&R is because you're doing a subdivision. You're creating new road frontage, which in this case we're not. And we're on a county road, so it's considered public adequate access. You know, we're meeting the 14-foot wide, 14-foot high, obviously, space, which is the other thing that can basically shut down an A&R if you're building off of an old dirt road that somehow is a town road. It does not provide what's considered adequate access. But in this case, we have no issue with access. We're just dividing the one lot. But that is an interesting question. It's something we haven't even looked at. But, you know, if it's something they could do, it's something, if they can do it by right, they can do it by right. And if they can't, they would have to, if they can't, they can't, or they'd have to find a way to appeal it. Yeah, I just think the way that that note one is worded isn't going to help anybody's case later on, no matter what they want to do. It could be read either way. And so I think it should be just worded more clearly to either give them the freedom later on or remove the freedom. Are you asking if parcel A1 was attached to Paul's land and then you resubdivided it out? Is that you're asking? Yeah. Because it can't right now because you need 40,000 square feet a lot area. Okay. In the R40. It's not R40. Yeah. Oh, I see there. It's R40. Yeah. And you also need 180 feet of frontage. Now, if it's only changed, let's say 20 years later and we had sewer or the... Or if it just changed to 20. R20? I guess that's a question down the road. You know, I think that 180-foot frontage would pretty much nip that in the bud anyways. We'd have to be really up-zoned and really make a lot smaller lots to do that. It wouldn't be today. Under the new law, if you, that may be the new law, if you have 50 feet of frontage. 5,000 square feet and 50 feet of frontage. That's what it says, so you've got it. But you also have to have sewer and water, and this area is septic, so it kind of eliminates that, unless sewer is put in someday. Anyway, I just didn't like the way that note one is written, but it's fine. Anybody else? I'm going to land. Okay. Well, I guess, can I have a motion? Are you ready to vote? A motion to approve the A&R plan as presented? So moved. Seconded. And I don't remember what the date is on the plan. I don't have it right in front of me. Do you know the date, Robert? October 22nd, revised October 28th. Okay. Plan dated October the 22nd. Revised. Yeah. Revised 28th. Revised October 28th. Okay. That's part of the motion. Is there someone who will make the motion? I made the motion. Thank you, Bill. Seconded. All in favor, Jesse Newberry? Yes. Robin Borgestedt? Yes. Ira Montague? Yes. Annette Lewis? Yes. Bill Sterling? Aye. Okay, thank you very much. Thank you. Thank you, Madam Chairman. Thank you, members of the Board. Do I have a copy of the revised one? Yeah, we'll have somebody bring that in tomorrow. Okay. Or I think, did we bring, oh no, yes, no, we only had one on the revised. We had sent you the previous one. Yeah. So I'll get the revised one over tomorrow. Ms. Borg said, if I could just add one thing, just for my own edification, because the way I wrote that note, it says, Parcels A1 and A2 are not individually buildable lots. So basically he was just talking about those lots individually. So nothing in the way that's worded would preclude somebody from looking at some other way of doing something if they change that individual parcel. It's just talking about that one parcel. Yeah. So I would think that's... If you had another way to word that, let me know in the future. I'd be glad to know. If it comes up, I'll think about it. Yep. Okay. Thank you very much. Thank you. Good night, everybody. Good night. Thank you. I know that Robert did go back and forth with the surveyor, and I did too, a bit. Because I had the same kinds of concerns that Robin did. And normally, if it's not a buildable lot, we say it's not a buildable lot on the plan. We see the properties together. But if everybody's comfortable, that's just fine. Moving on. What are we up to, Robert? Are we up to Park Ridge? I would just wait for a team and then you can just make an announcement that it's been continued, but it already has been. The minutes, which we... Well, it hasn't been continued because we haven't granted it. You have, we haven't. Yeah. Let's be tough tonight. Now or never. Right. The minutes we don't have, I tried to look at them, and I was really trying to get them in. They were really extremely poorly drafted. And I asked Robert, at this point, I'm tired of redoing the minutes too much. Who did those originally? We have someone that we hire. Oh. And I asked Robert if we could move to AI and Jesse piped in that he thought we should try it. Because she, I mean, on all, I don't think we should have 18 pages for the minutes, but if we've, if we've. Discussed something and there were like five areas that we discussed. I think they need to list the five areas and what the conclusion was if there was a conclusion, not just, oh, it's in the record. It's like, not if it's not in the minutes. When the meeting is recorded, there's a transcript. You have to ask, I have to ask IT to get this transcript. So what I want to do is try to get that transcript and hand it to her so she has the transcript itself and she can actually look at the transcript from the zoo. That might help. I have not seen it. I asked Anita to reach out to IT to figure out how can we get that so we can each meeting we can look it over. Especially that meeting, let's go back and look at the transcript. There was a lot of public comment in that one. Yeah, and she didn't, I mean, I think people did say their addresses and we only had some addresses. Yeah, the other thing I do for public comments, sometimes I'll summarize, I've done in the past, is summarize public comments and discuss, here's what the public comments about. Yes, exactly, that's fine too. Stormwater. Right. Yes, but you need to just hit those issues. And I would appreciate it if when she's putting something in quotes, she uses two quotation marks, not just one. Because one doesn't mean anything in the English, in our American English language. Yep. Robert, how is she doing? Is she watching the video and trying to cobble it together without a transcript? I mean, that's crazy that she doesn't have the transcript. It's not something you can just get, you just get. You have to like, because when I'm not, we're not the host of the meetings IT has, it has the Zoom like, you know, log in so they can actually see it. It's, you know, if we, if the Planning Board, I was hosting it, logging in, then I can get the transcript myself, but at the SIT board. Ira usually has Notetaker. He could do it, too. Actually, my service is run low. Oh, okay. But it's an interesting program that it does take notes for you. And it's a pretty good summary. You know, some places it's more than you need, but I think it'd be a good place for her. You're familiar with that, right? Yeah. I mean, there's so many options out there to do this. It's crazy. I would start there. It's pretty... But I mean, I wonder, like, is she just not a fast enough type? It's like, we have secretaries in our office who can listen to a deposition and without a transcript can create a transcript. They can write that fast. But maybe she's not used to doing that. So maybe she's just not that fast and not fast enough to kind of keep up. I don't think she's a secretary. I mean, I don't think that's her. Right. No, she's just doing this on the side. Yeah. We need a professional minutes taker. What's wrong here? We'll have a special session on your taxes, Ira. The associate member used to get tagged with doing the minutes. And then the clerk. And the Lady of Women voters. And we have a clerk, and that's Jesse. That's right. Which is why I sent the minutes to Jesse when I couldn't figure them out. Uh-huh. Uh-huh. Always, when I started it, it was me doing the minutes. Well, yeah, which is a waste. And I figured out, I gave the town, here's how much time it costs to do the minutes. And I gave them how many hours a year it costs, and here's the wage. And they're like, oh, we need a minute ticker. Because it was way not a useful time. The town planner used to do it. Yeah, that should not be happening. Then he pushed it, tried to push it back on us and we were all like, oh, we don't know how to do it. On a side note, it's now 8.15. Okay. Okay. It's 8.15 and it's time for PB number 2605, Continued Public Hearing, 8 Park Ridge Road. I'm not going to go through the whole thing. Anyway, Robert, do we have a request for an extension of time? We do. I received an email this afternoon after a phone call from the petitioner's counsel. Hold on, I'm just trying to pull it up. I pulled the right email. In quotes, I am confirming our telephone call that we can continue the hearing of A. Parkhurst Road until the Planning Board's December 2nd meeting while my client awaits the zoning determination from the billing inspector. I'll keep you in the loop when I get receiving updates. Thank you. Did we already vote on this? We did, but we need to make the formal vote at 815. Oh, okay. I think it would be helpful to have the official vote. Okay. Can I have a motion to continue 8 Partridge Road, PB 2605, until 815 on December the 2nd? So moved. Second. All in favor, Jesse Newberry? Yes. Robin Borgestedt? Yes. Ira Montague? Yes. Bill Sterling? Yes. Annette Lewis? Yes. And I will talk to the petitioner to let me know that. This is pretty much the last continuation. Yeah. Yeah, you've got a month to figure out what it is. I think you can explain to him that it just, it throws everything off and there are other things that we would like to be doing. I think he understand that and he had no issue with me asking for continuation for a month to figure that out. Okay. Is there, are there any other updates, Robert? Not that I'm aware of. Okay. Board comments and concerns? None. I have a concern. I'm getting uncomfortable about being ready for town meeting and our bylaws. We have several that we need to get into place. And Robert, I think you said it was like November that we would get the thing from, is it on the ADUs? ADUs. No, what is the MMA working on? Is it the MMA? Who was there? MAPC. MAPC, thank you. The ground-mounted solar. Ground-mounted solar, okay. And they are working on that right now. Okay, and that was like November that we were going to see something? Yeah, I would probably assume like late, like mid and late December, late beginning of December. They were shooting for early December for that. So that's going to get really tight. So we've got that. We wanted to do signage. I sent over what I have so far to Bill. So Bill can take a look at what the changes I have. They're pretty, right now, pretty minor. I didn't get too into the weeds in it. Just because of timing, I didn't want it to. And you got the minutes from the meeting that we had when Bill came and Tom White was there. Yeah, I actually threw the request into ChatBBT and ChatBBT actually said to me exactly what meeting minutes it was. So I spent... About five seconds to figure out where the meeting was instead of me going through all the minutes and reading all of them to try to figure out. It sped out exactly. He said, go to this meeting, September, whatever meeting was in 2025. Here's a meeting with Tom White. So I found it in about two seconds. Okay. And are we going to do more housekeeping? Yep. So I started working on that, but there's also going to be a webinar or a discussion with KP Law. Including the ZBA and the Planning Board later this month. And I know that I asked all staffs Anita to jot down what any housekeeping that the building inspector is looking at to do too. Yeah. So I asked her. That's going to be a bear, I think. Because it changed. Oh, which one are you going to bite off? And I did attend a webinar with... We have ELOC and also from the AG's office from their bylaw unit. And what they said is that all these changes have been approved. There's no requirement for the towns to make the changes. However, they're in place. The law is in place. If the town wants to be compliant and have that in there, they can do that. But there's no penalty to not have it. It just makes it more confusing. More than not confusing. I mean, it's a bylaw. True, but unlike the MBTA, there's no requirement to have a bylaw changes on it. That's just what I heard from the AG's office. KP and Blot might say, no, we disagree. You should have those changes in there, and it's very strongly required. Well, I think, I think, I think it should be in it too, but the thing is, if somehow you don't, you can't make that quick change, you're not going to get, there's nothing, you're not going to penalize. It's just, I'm not concerned about being penalized, I'm just concerned about people knowing what's going on, because. No, I agree. It'll be a zoo. No, I agree. I agree with that. One of the changes that's not, which is outside of the MBTA, the zoning changes, is this assignment I've been getting stuck with is that in the BILARFA site plans, it says that You need to approve a site plan within 60 days. However, the board, the town, or the planning department needs to send out the comments, and you can have public hearing within 30 days. So you need to reserve. So this window of time is between the public hearing can't be any sooner than 30 days, but then it has to be approved within 30 days, within 60 days. We want to make a change to move back to 21 days, and so we don't have to be stuck with the 30-day deadline, because the 30-day deadline is just kind of a bear. Even more so, I don't know if the change was made in the law or wasn't made in the law, where I think site plan, didn't that become a law? It's in the law now. I have to double check on that show. Okay. Well, if it is, I know that that was, it was pending and I don't know if it was part of the budget thing or if it's a separate bill. But if that's the case, then we do have to make changes to our site plan review. Yeah. Okay. So, so far we have for bylaws, we hopefully will have signage, more housekeeping and ground mounted solar. Yeah. Minimally. Yeah. So, again, working backward, by the 15th of January, we would have to submit our bylaw, and it really should be final at that point and not do changes afterward. We should have a hearing in advance of filing it. So, working backwards, it's like now. Cutting it close. Yeah. Okay.
Okay, anything else? You want to leave? That was a good concern. Okay. Motion to adjourn? Absolutely. Second. Iron Montague. Yes. Bill Sterling. Yes. Jesse Newberry. Yes. Robin Borgestedt. Yes.
Thank you, everyone. Thank you, Robert, for getting us ready. You didn't vote, Annette. Oh, I didn't. You always tell me that. Well, you don't need me. Annette Lewis, yes.