Good evening. This is the Wayland Planning Board. It is November the 18th at 7 o'clock p.m. And this is a remote access only meeting via Zoom. I'd like to call the meeting to order by roll call. Robin Borgestedt. Here. Ira Montague. Here. Jesse Newberry. Here. Bill Sterling. Here.
Annette Lewis here. The agenda for this evening is public comment first, then review and approve the draft minutes of 10-7 and 10-21. Then moving on to PB number 2608, 17 deer run, ANR plan review and approval.
Then at approximately 7.30, review and approve the decision on PB number 2603, Site Plan Approval for DPW's Happy Holler Water Treatment Facility and Castle Road Pump Station.
And then at 7.45, Discussion of Proposed Revisions to the Signage Bylaw, Sections 198-501 and 198-502. Then at 8.10, Updates from the Town Planner and Chair, and an update on the Draft Zoning Bylaw and Housekeeping Amendments for Annual Town Meeting.
Then board comments and concerns and then adjourn. So is there any public comment this evening? I see no public comment. Okay. Why? Can I ask you a question? Robert, I'm trying to see the participants and for some reason I'm not able to. Now I've got it. Thank you. I still can't see it. Okay, I just got it. I had to click several times. I got it.
Very weird. It shows three. It doesn't show anything else. Yep. Okay. So there's no public comment. Okay. Moving on. Review and approve the draft minutes. Starting October 7th, the 6th, 30th meeting, which was the meeting with the Town Center. Instead of refreshing myself, which meeting was Town Center meeting with also.
Castle Road and Park Ridge was continued. So this is a meeting we finalized this decision for, we'll finalize the approval for the Town Center. Are there any comments? No. I saw two typos at one point, but I can't remember where.
If no one has any comments, can I have a motion to approve the minutes? I move that we approve the minutes of October 7, 2026. Second. As shown, right? As shown, yep. Second. There was a second. All in favor, Robin Borgestedt? Yes. Jesse Newberry? Yes. Bill Sterling? Yes. Ira Montague? Yes. Annette Lewis, yes.
Perfect. Okay, 5-0. Moving on to the minutes of 10-21. This was the meeting with Local Street and the finalization of the ADVO plan for the COA. It was a shorter meeting. Does anyone have any comments on them? No. Nobody else? I do. On, where the heck is it?
On page, is this three? Hold on. On page three, on the fourth line at the top, to justify, it's in the middle, it just says T, it needs an O. I got it. Okay. I already fixed it. I saw it too. Once I scroll down, I cut my eye.
Also, on the 8.06 timeframe, it needs a space between the two paragraphs and the two paragraphs have to be lined up under each other. And I think that's all I had. So can I have a motion to approve the minutes of October the 21st, 2026 as amended? So moved.
Second. All in favor, Robin Borgestedt. Yes. Jesse Newberry. Yes. Bill Sterling. Yes. Ira Montague. Yes. Annette Lewis. Yes. Okay, 5-0. And for the minutes on the 4th, I received them, but I just received the transcript today, so I'm going to take a look at the, using the transcript of the Zoom. I finally got it from IT. After.
Two weeks. That's great. I think that'll help. I'm going to take that and try to see if I can try to like. There should be a way that they can just do it while we're at the meeting. There is, but the IIT button left and they got someone new. I see. It just was automatic. They would do it automatically, but now they're not. They just. Moving on to the deer run A&R plan.
We just got to wait a few minutes for that. Oh, okay. Sorry. Okay. I'm not sure if they're here yet. I have to look at this. Okay. I would just wait an hour. We can go to the housekeeping article for now and just discuss that a little bit. Let me try to pull that up. This is an assignment. I'd rather do that at one time because it'll get messy. Sure.
Oh, then you can skip down. You're just talking about the one short one? Yeah, the very short one. Okay, well, try it. Thanks. Let me just get on my screen. So this is a start on the housekeeping one. We are having a public meeting, or not public meeting, we're having a discussion with KP Law on next Monday.
And I would assume that we have more changes based on the new statue. These changes, the two changes I'm showing here, and I wrote a quick memo to the board. I hope everybody read it. These are things that I kind of run into that have been issues under the site plan. Under 604.3,
You have to, I am required or the Planning Board agent is required is to send out the applications to all of the different boards and departments, so fire, police, land use, health, within the health and all those different groups, DBW. It says that I cannot have the public hearing no sooner than 30 days. And that's, that's.
Having low and down to 21 days gives us more flexibility from the town to have the public hearing. My understanding is probably this was going back is when the newspaper would advertise on the locally where you would need the 30, you would have to publicize it within 30 days. But now with reusing the Metro West, their advertisement is much faster. Instead of once a week, they have, it's advertised every day.
So we have much more, we can be much more nimble to advertise it. It also would stop the process. We have 65, 60 days right now to actually approve it, which I've not seen so far as site plan approving within 60 days. So I modified it to 120 because we are just constantly looking at the days going, oh, we got to extend this again, got to extend this again. It would be helpful to have it a little bit longer leash.
I don't know if the number is 120, 90 days, but I was running the numbers of all the different site plans we've had in the last year, and it's closer to 120. It's above 120. And also, if we don't do it and don't deny it in the time frame, then it's automatically approved. Yep. So this is truly housekeeping. It's just make sure that we can run better as a machine and we can be more flexible with...
When we have the public hearing, when to start a public hearing, get it faster, get it at least started, and then also be able to have that ability to not have to sit there and have five, you know, ascensions of the deadline because the deadline, the thing is so short. So that's what I have so far about housekeeping. Obviously, there's more things to be added to that, but do you like to get your first thoughts on this? To me, if you're happier with these deadlines and they work and...
K.P. Law doesn't have any concerns, then. Yeah, I mean, I absolutely will censor K.P. Law. I don't think there would be this. Remember, this is on a site plan. This is not a special plan, right? So we can kind of, you know.
We can kind of, I mean, you can also ask KP Law, is this reasonable? Yeah, I'm wondering, I just want to make sure that 120 days is reasonable. Yeah. I can, yeah, I mean, the ones I was looking at wouldn't much help, 120 days. Right. So figure out how many meetings we have during that time period. And I think for a site plan, at a minimum, we should be able to fit in, if we need to, three meetings.
Yeah. Right. So figure out whatever that is and see if it does come to just 120 or if it can be slightly shorter. Well, if it's a peer review and on a traffic review, that's going to be a long time for days. Right. No, if it's a site plan for, I mean, most of us, even all the site plans we've been having, they've all been peer viewed at some point. Even the...
The building on Bothell Road, even. I mean, the only site plan I can think of on that peer view are like the outdoor dining. That's the only one that falls in it. But I think there's a commitment to get it. I mean, we would not. I personally don't hold back applications just because I can, I think, for us. But we can also put a requirement here, too, that the public hearing must be. I don't know.
I'm not too worried, but I'll take a look again to make sure that 120 is reasonable, but for the big ones, it is absolutely. Can you check and see if there are how this compares with other communities of our size? I did. I threw in a trappity and it said it was reasonable. Yeah, it said it was reasonable. Again, you know, towns. Well, what numbers did you find?
I mean, I didn't write it down. I would have to throw it back in the chat for you to me, but. Well, would they more or less than 120? Not into 120. Mm-hmm. Yeah. You know, the concern, and we can ask KP Law, is this section of the law has been changed, and I don't know what that does to anything. Yeah. So why don't we.
For now, I think that's okay. Why don't we ask KP Law at the meeting, Robert? Yeah. What they think? Because you're supposed to be able to get through site plan faster than, I mean, faster than. Four months. The other one that you had, was that it for housekeeping? That's it for housekeeping, yeah. And the other one was zoning, which we'll do later, because I think that's going to take a little bit of time.
The deer run thing, is the guy here yet? Because it's not a hearing. We can move it up. I can't see the attendees. I think it's a guy named Bill. He has his hand raised. Bill? Can you hear me? Yes. Oh, good. Can you put your face on, do you think? I have to figure that out. Okay. It upgraded on me.
Yeah, that's fine. Turn this off to the more panelists and make the video turn. Yeah, it took me a while to figure out how to get the audio on. Sorry. That's okay. That's fine. Okay. Why don't you tell us what you're here to do? And Robert can also, after we get the basics, Robert can put up the plan. Yep. Yeah, Bill Housing from Land Planning Incorporated.
17-year run owned by Russell Bowes. It's an existing property with a large home on it. Formally, it was three lots, part of a subdivision, 1970-72. It was approved by the Planning Board. So what they want to do is divide off one buildable lot at this time, leaving the existing house. So we, you know, redivided it, and each lot meets all the zoning requirements. Robert, do you want to put it up?
Sure. Bill, one of the things is we have two separate sheets of paper, and on one of them where the actual owner of the property has signed, there's no book and page number, and you can't tell what the property is. Oh, wow. So we need to have at least one concise document that's an application that has everything on it that it needs.
Yeah, yeah, I didn't see the final application signed by the owner. I put the book and page on the plan, certainly. Yeah, but, well. It was the app that resubmitted the signature of the. Okay, well, perhaps maybe the gentleman can help you fill in the book and page. The problem is that.
We have a sheet of paper that says each lot shown as adequate frontage, and it's on deer run, and that's it. So it doesn't tell us what the property is, and it doesn't tell us the book and page.
That it is so that we know that it's that proper. It's an easy fix. I think someone just needs to fill in. He was trying to quickly fill in as much as possible, but he was just trying to submit it as I requested that the owner needs a legally signed off that they actually are going to give permission to actually someone to apply on their behalf. So either...
Filling in all of that and saying that there are two pages or having the owner sign the original one where the applicant has signed it. Either one is fine, but you just need to have one comprehensive document. Okay, we can get the applicant to take care of that. Okay. So, Robert? I didn't have too many...
Comments on it, I'm looking at my memo. I did submit this to David Seward, the applicant. I believe I also might have submitted it to the engineer, the survey or two. The only question I had was there was some lines on the plan that just had questions on what they were referring to. The formal lot lines on there, which I did note there was previously A&R plans submitted for this property.
But those are some lines. But I believe that the survey did correct me that they were just there for some of the zoning requirements, the dotted lines. You can see them across the screen here. There's a little line. That line, I think, has to do with a property description. Yeah.
But the other one on the right where it says lot B, those lines show what the setback is for the house. And that house can fit into that circle. Yeah, I noticed that. That was not a problem. Besides, I know the question is a pretty simple one, simple application and plan. So, no, I think the only concern I had was making sure the applicant signs off. And I think then we just saw the...
Deal with that before it's actually completed. So if the applicant can resign that or fill in the rest of the information, it doesn't matter to me. Whatever way, we just need a complete application at the very end. Hey, Robert, could you tomorrow just email me what they gave you just so I can see what it is? I can just quickly put it on the screen. This came from the... I will also email it to you too, but I'll just...
Yeah, so I had filled it out and I gave it to David to pass it through, but apparently it doesn't have everything. Okay, I see what you mean. Yeah, I mean, he was trying, David was just trying to comply and so that we kept the process going so that it didn't get delayed again, but just an administrative thing. We just need to finalize. Not an issue. Okay, easy enough. We can take care of that. Any member, any questions from the board on this?
Plan. I just had it two seconds ago. No. Good. You okay, Ira? I am. I was just looking at the house. Jesse? Okay. You're muted. Yeah. No, I'm good. Ira, let me know when you're ready. I'm good. Thank you. Oh, okay. Can I have a motion to approve the A&R plan for 17 Deer Run Road?
17 Deer Run Road, that's it. So moved. Second. You're slow tonight, Bill. All in favor. Robin Borgestedt. Yes. Bill Sterling. Yes. Ira Montague. Yes. Jesse Newberry. Yes. Annette Lewis. Yes. So that will be subject to releasing the ANR. We have to sign it, first of all. But actually releasing it will be subject to getting the paperwork. And Robert accompanies it with a memo. And the memo will say that once it's filed, you have to let us know that it was filed. And do they get a Mylar too, Robert, or not? I believe they gave me a Mylar. I will double check when I get back to the office tomorrow. I do believe I have a Mylar. Because there's no changes, I believe, to actually plan itself. So I think I have the Mylar itself, so I should be good. So that we could come in and sign at any time? Yeah. And then sign it from there. And then once we have anything, then the app or someone can pick it up. Okay. Everyone okay now with that? Are you okay, Bill? Whoever? No. No, the other Bill. I'm sorry. You get too confused. Yeah, yeah, I'm good. And thank you so much. Okay, thank you. Have a good night. You too. You too. Just want to see what else we got here. Review and approve the decision on PB2603, the site plan approval of the DPW's Happy Hollow Water Treatment Facility in Castle Road Pump Station. So I did get a request from the applicant client filter, on behalf of the applicant. I didn't submit the whole thing you were asking about the conditions. I just kind of... Quickly come and paste the conditions that will be the very end of the sections and then provided to them the information, but I didn't, that's, and they had no issues. Everything told me everything is pretty standard. The conditions, no surprises that they would be subject to, but. And I only have a few places where I wanted to just highlight that I, you know, reorganized or added information just to be thorough. One was the, they submitted a packet, one document with all this information. So I just kind of broke it down of all the different pieces of it, which included the plans, the stormwater design report, the traffic site analysis letter, the response to planning about third-party review, and... That's it. Yeah. And then they also added the presentation for the Planning Board on November 4th. So I just highlighted it. It's not something to be changed. It's just something to highlight when I just so people saw that this was a modification from what I sent out recently. Did you get resolution on Anette's question about the lights? I did not. I reached out to them and never got back to them.
Are there any comments from the board? No. Looks good. Okay. Robert, on the 2-2 with the additional application materials, somewhere we need to specify what the final approved plans are. So, because that's what we talk about throughout the decision. So, you need to figure out where we put that. This is Revives in Additional Application Material. So it would be all of this information. So it would be the plans, the site plans, which includes the site plans, the occupational plans, all the floor plans, that's the first bullet, the updated stormwater design report, the traffic site analysis letter. And then it would be, actually it would just be those three. So it would just be these three, because then after that is the responsive comments. So I can make a different bullet. I think it might be a good idea to make a different bullet and call it... Final approved plans, if that's what we've called it before in other decisions. And with the Planning Board presentation for the meeting, if that's, is that what you were, you were starting with your first bullet, the Town of Wayland, Massachusetts, Happy, Hello plans. You need to, I believe, say how many plan sheets there are, you know, what's in the package. Yeah.
And you picked off the traffic and site analysis. You should probably, in that original package that we got, not the original original, but the package that we got of additional materials, there were traffic, sound, and light, right? So we need to make sure that we've listed those. And that would probably be in the additional application materials. I'm looking at it actually on my screen because I had comments, so I'm not looking at. Oh, I don't even have it up on my screen anyway of yours. No, I'm just not sure what document you're talking about. In 2.2, they did a submission which was response to Planning Board and third-party review comments. And in there,
They had traffic report and a light report, I think, and traffic light and sound. So if you can just list those in that document, if that's what the document that it was in. I thought I just read that. Well, you've got traffic site analysis, but what's not there is. The sound isn't there. I don't know how you broke them apart. The response to the Planning Board and third-party comments was one letter, and it had several pieces to it. Yeah, you definitely lost one when you edited, didn't it? Yeah, I know, I just did. So you could put bullets underneath the bullet, that bullet, and have, if you know. No, it was there, yeah, I see it was there. It's right there. There it is. I knew it was there, I'm not like, I saw it. Because we're doing, I will fix this one. Okay. No, it's right there, that third party. And you wanted to say what was the response to, is that what you said? I just, if the response came in and it had those three attachments or whatever else it had attached to it, it should be included in that reference so that we know we received that material in that document.
For the final plans? No. That would be the additional materials. For the final plans, I think all we need are the plans, don't we? Yeah. This is the final plans, the stormwater design, and then the traffic analysis letter. But I'm not sure if you want that under 2.2 then. I'm getting confused. I'm not sure what you're asking. I can go over it with you tomorrow if you want, rather than... Yeah, I don't think we should be wordsmithing. Yeah, we weren't wordsmithing. We were actually trying to figure out. I think you're talking about this line here, the one in the green. I can't see. Is that on the screen? If it is, for some reason, I'm not seeing it. I just see everybody's faces. Do you all see it? Yeah, I can see it. We did. Great. It's gone now. I'll share it again. You're talking about the one in the green, the green line, the green highlight. We should break that down. Is that what you're saying? I would probably call that the actual plans that came in. Aren't the plans separate from the response to comments? And wasn't it in the response? It was all one document. It was all one giant PDF. I'm trying to find it so I can pull it up. That's okay. You don't have to. Then why don't you put it in revised additional application materials and then just pick up whatever should be in the final plans, and that would be the plans. And if the stormwater document is final, part of the plan. Yeah, I would say that stormwater one is final too.
I will make a modification to try to change it. Okay. Thank you. Depending on how the page is set up, and it'll probably be fine once you do what you need to do. But right now, between 2.5 and 2.6, if that's how it would wind up looking, I would put a page break.
2.5, 2.6. Right. But it might not need it when you add your new stuff. It might already go to the next page. Yeah. Okay. Okay. Let's figure out in the writing, the note, lighting analysis at page 29. Let's mention just three lighting fixtures, which I confirm. Page. Oh, yeah. No, it's in the plan. So they really do need to fix that and tell you what's what. I don't know if there's anybody on board. I'm not sure if there's anybody here. Can someone see if there's anybody from the team? Hold on. I see five attendees, but I can't see their names. Okay. Oh, sorry. Who are you looking for? Anybody from ClientVoter. Anybody can answer that question. William Ross and Margaret Ross. No, they must be neighbors. And Barbara DeMauro is a neighbor. Nope. And then there's just somebody who just says Zoom user. Nope. So. Anybody from Kleinfelder, raise your hand. Okay. I should have probably printed this out rather than having to look at it on the screen. Just want to make sure. And then at the very end, Robert, where it says record of vote, it's all of us. We already voted. Now we're just signing off on the decision. That's fine. I think. No, that's fine. Yeah, you did vote. Okay. How should we handle? The fixing of the... Should we approve this subject to Robert getting confirmation from the applicant on what's what and sorting through those plans? I think so. The record is closed. So technically, I think the applicant has to decide between the two plans, which is which. Yeah. They showed him features. Okay. Are there any other comments? No. Can I have a motion to approve the decision with Robert being authorized to figure out with the applicant which of the two plans they're going with for lighting, for the number of light fixtures? Is it two or is it three? So moved, I guess. Second. Long one. Jesse Newberry. Yes. Iron Montague. Yes. Bill Sterling. Yes. Robert and Borgested. Yes. Annette Lewis. Yes. Okay, Robert, let me end. As written, I'll be signing it, so let me know when I should come in and sign it. Hopefully tomorrow or Friday. Okay, but you have to hear from the applicant. Yeah, I'll call him along again. Okay. Well, that was good. Now what are we up to? Prevost revisions. Just one more thing. I just want to make sure. Okay. Robert and Bill worked on Revisions to the draft signage bylaw. And then they sent it to the building commissioner and he offered some comments, some of which. I found particularly confusing because I just wanted to make sure that I understood what they were taught, what he was talking about, the building commissioner. So Robert and I had a brief conversation with him today and sorted through some of them. And so I don't know if Bill or Robert wants to lead off the discussion, the overall overview, and then people can comment and we can go through the document. Yeah, I can speak up. You asked me to speak about it. I am afraid that because of these last-minute changes that, you know, I don't think the document is ready to vote on. Oh, no. Oh, we're not there yet. Oh, we're not there yet. I think what she's asking is to talk about. The things that you pointed out and the things that the overall opinions of what we should be getting out of this at the end. Oh, gosh, this is not even close to being done. I've been working on it again. It's not anywhere close. Okay, but I'm saying I don't think it's even ready enough to discuss because I'm putting things in here. How about an overview of the things that we're trying to fix? Yeah. I would disagree. I think Bill, I think you can... Okay, if we stay out of the weeds of wordsmithing, I think that's fine. But if we start getting into carving into paragraphs of new words... No, I don't think that's what we're doing. I think it's way too premature to do that. Yeah, I don't think that's what we're talking about. Okay. I think what we... We had a meeting last year in September. with Tom White from the ZVA, and he was voicing some things that he would like to see be done. I have talked about things that I would like to see be changed with temporary signs. One of the things that Tom White was not concerned about, but he wanted some changes, were they were approving signs by special permit on additional walls where The bylaw could be rewritten to allow for secondary signs and so that not everybody who has secondary sign has to come to the ZBA to get approval. So he wanted to see more flexibility so that they wouldn't be required to have a special permit every time they want. Someone would want to have a secondary sign. You know, for example, there's a doctor's office on Pellmire Road or It's off of, it's close by my road. It's off of, actually off Potsdam Potsdam Road where they have a sign in the front and in the back there's a sign that you enter. The sign on the back faces a parking lot and nobody sees it. But they could not do it under the bi-ready amount because that would be additional signs so they had to go to ZVA. That's one example of a thing that would be helpful for the bi-law to codify so they don't have to go back every time to a secondary sign. So that may be helpful for that one case, Robert, but here's an example of what I'm talking about. It's nitpicking a little detail that applies to one property and to start writing, rewriting the zoning bylaws because there will be an exception here or there, I think is absurd. That's what the zoning board is supposed to do. They make exceptions to the bylaw and that's what their job is. And they shouldn't be saying, oh, make a new law because we have a condition here. That's not covered in the bylaws. Otherwise, there would be no need for the CBA if everything was written down to every little exact condition in the town. I don't think they're talking about every exact condition. I think the overview that I understand is we can have 40 square feet of signage on a building and it's divided up. However, it gets divided up. What they wanted to be able to say was you can have a freestanding sign for a freestanding building, essentially, and if you can't see that building from a back parking lot or can't see what the building is from a back parking lot or from the side, They would like permission to be able to add signage, but I don't think that they're probably- Well, hold on. They have permission to make exceptions, to make variances. They already have permission to do that. They don't need us to write, that's okay for them to do. We did that for eight, 10 years before in the 1980s. You don't need to have a new bylaw for that. You were at the meeting with Tom, and I thought you all agreed that we should be doing this. No, I never agreed to writing such a detail into the bylaws. I think it's absurd. I would like to comment that that particular change, allowing sort of a backdoor sign, is very consistent with what we're trying to do with the whole, you know, reworking how the center of town fits so that we have shared parking on the back. And so... You know, we have a lot of places where that's true. You know, you have even go down to like Mel's where there's the sign on the front, but people park around the back and they could put a little sign by their door that says this is the entrance for Mel's. So I understand not wanting to make it so specific, but I would think this is the sort of thing that only people who are in this situation are going to be looking to put that extra sign back there and they still have to fit it within the 40 square feet. That's not true. That's not true. We made variances that allowed them to have an extra 40 square foot sign in another location. We did it when they were too far from the road to be able to be visible. We allowed them to make larger signs than 40. That is not a hard and fast rule. The ZBA has the right to make a difference. Right, and they still do, but this is, from what I understand, I know we're not going to get into the weeds, but we seem to be in them. Well, here we are. But I think that what this is allowing is just a saying that having a second sign around a blind side of a building is fine, but it's staying within the 40 square inches. If you want more than the 40 square inches and multiple signs, then you're back at the ZBA anyway. Inches, whatever. Yeah, I think that's true. Well, I think every one of these would be true. Every time they come up with a new condition, though, I think it's a dangerous path to go down where you write a new law every time there's a new condition that you think is fair for them to do. That's why you have a variance. That's why you have a ZBA. Fair question. When was the last time the sign of Iowa was actually... overhauled or actually looked at and actually modified at-town meeting. Years and years and years ago, I wrote one that we never went forward with. This is years, maybe 2000. So we're talking about, we're not talking about a change that just came up in the last year, and we modified the zoning pilot, you know, within four years, and now OPC is something else we need to change. This, we're looking at, this is two people from, including me and the building commissioner, coming in and actually having fresh eyes. I mean, I've been here for four years, but the building commissioner has been here for a year, looking with fresh eyes and saying, how can we improve it and make it easier, not just for ZPA, but for property owners to come in, how to make it so easy. Probably not carrying the Brenna every time they want to have additional sign on the back. What benefit does it actually have for the ZBA to make them go through this all the time? So that's my counterpoint. This is not just like one little small change because we missed it. This is, we are, there's actually main things in here we're looking at that from using from our past experience, from my experience in the past, and also from the building commissioner, and from a city point of view, and also from, he worked for the city garden for many years too. So trying to find out how to make it easier for people to actually locate business, but then also locate their signs too. How does everybody else feel about that, Ira and Jesse?
Can you repeat what you just said in terms of... We're trying to make it... We're not... We both had... Building Commission and I have... We have not touched the sign by law since we got here. Right. Looking at some fresh eyes and trying to bring some new ideas or listen to the ZBH here and say, we might be very easy. And it's a given ZBH here. It'd be easy to make it... We'll have a little bit more flexibility with the location of signage for secondary sign. That'd be helpful, so... That was something that came directly from the ZBA chair who oversees these special permits. And I do agree with Bill that, yeah, you can get a variance by sign, but special permits is the way to do it. Are we really going to be pushing everybody for a special permit every time for these kind of signs? Because not just here, but, you know, the plaza for Starbucks. They have the Chase Bank and the Jersey Mikes. They all have to go for the same thing. The signs on the back and the signs on the side for the same thing, for secondary signs. But if they're staying within the 40th number, then they can do it. If they're not staying within the 40 number, then they have to go to the ZBA for relief. Wouldn't change. So it goes ZBA for that, so. Let me do this. Let me go through the main changes so that everybody can see what we're thinking about. And we still have a lot of work to figure out all of this, but we are getting input from the Building Commissioner. We've had discussions today with the Playboy Chair and the Building Commissioner. And then I have some more questions for the Building Commissioner to some stuff he gave me. I want to also clarify and make sure I understand what he's looking for. Well, let me ask you what... What does the building commissioner have to do with signage in the town? He's in charge of zoning. He has to approve his signs. Right, we set up the criteria of what it's supposed to look like. But also, Ira, he needs enforces. So if there's something in here that he doesn't understand or can't enforce, that's not helpful. It's not helpful for him to have sections. Are you looking for him to input the font or should it be gold leaf or background color? No. The size and the location and the weather, how it's lighted, that kind of stuff. All right. So we added new definitions, talking about what a sign is, what the temporary sign is, and display, trying to define that. That's under section one. Section five is what we had the smallest section, and that was talking about maximum one sign per each business. And then we get to the part about the secondary sign. So one secondary sign, you can have one secondary sign on a different wall. We're just going to revise that to clean that up to make sure it looks correctly. Window signs can come no more than 30% of the total window space. But that's also included in the 40. Correct. Yep. Size. I didn't know that. Is that what that says? Well, it wasn't required. That's in addition to the 40, right? Which is why I talked to the building commissioner today because I couldn't figure out, you know, where we were. That's what he said. Yeah. So one thing. I didn't catch that line. Display area for a free sign sign. Cannot shout. Not exceed 32 square feet. That's just a placeholder for now. And in the last case, 501.2.7, any case, you can go to ZBA. So if you have a bigger free setting sign, you want to have more window sign space, all of this is a catch-all for a special permit from the ZBA. So that's just the top part. And we're still looking to clean this up to make sure it's correct. Going down. A lot of this is the same language, just express and put on different lines to make sure it's much more readable. But also adding that signs cannot be attached to roofline nor mounted on the roof. And that's something that Bill mentioned that we don't want to have, we're not into having signs on the roof and it looks tacky. Also, making sure we have a path for signs for non-profit education and religious uses for the Dover Amendment, making sure that we have the approval to do that through site plan. But the dimensions must still apply. So we're not giving the waivers on that, just making it a little bit easier because we don't have that today. So signs cannot be blinking, cannot be moving, flashing, all of that. That's still... That was always in there, yeah. Signs located cannot be internally limited. Backlight opaque sign material and gooseneck styles are allowed. So you can do gooseneck style fixtures. You can do backlight opaque signs. Those are allowed. And that would be a new change. Also, when we're going here, we're trying to make sure that no sign is going to be illuminated no longer than 30 minutes before opening and then 30 minutes after closing of any store or business. Now, I would say, I thought about this for a while and I know this is pretty standard. I know the building commissioner chimed in and said this is pretty standard. We thought about turning the light off when it closes, but I think for a safety point of view, if you have a business and a woman is closing a store and Having it 30 minutes after closing would help them so that they can get to their parking lot so that it doesn't go pure dark. If you're in applause and all the lights turn off, you know, you have at least a little time to turn the lights off so that it's not just, you know, they have a chance to get in the parking lot so they can feel a little safer. That was my opinion of keeping it 30 minutes before and 30 minutes after just from a city point of view, having the extra light. Yep. And then including all the, this is all new stuff, but it would be, what, you know, what do you need for a sign permit? What do you need to apply for? What, who do you, who do you apply for sign with? And that's the zoning enforcement officer, which is the building commissioner. And what you need to include, all that, senators, all that, this is all new. Talking about signs under the Mixed Use Overlay, how that is exempt from the Design View Board. All signs must meet the standards in Section 23. Time Limit. This is something we need to look into, make sure it's correct. But it says right now that we need to approve or disapprove any signs within three days. However, Or should fail to approve within 30 days and it should be approved. But if they need to do a design review board, design review board could take up to 30 days. So I need to talk to the building commissioner about this one to make sure we're on the same page in this. Right, because you want the design review board to have their full time to do the review without something being considered automatically approved. Yeah, I mean, the zoning enforcement officer can deny the application. I know, but that's messy. Yeah, we need to make sure a fee schedule that goes through the building department. And then if a business closes, I'll sign advertising. I'll sign advertising that the closed business should be removed from the site within 45 days. So some imagined number, I'm not sure what the imagined number is, but just a placeholder for now. One of the other reasons why we wanted to make some changes is for temporary signs. All these sections here, anything that says on the line and bolded is all existing. But we have run into the problem with new businesses coming in and they want to have a temporary sign for the new coffee shop or the new donut shop. They want to have some kind of sign. They're doing it anyways, so how can we regulate it and give them some guidance? So one of the ideas we thought of was allowing them to have a temporary sign for 30 days. And we've done that right now off the books and it's worked fine. And they're okay with a small sign when people know that their dry cleaning place is open now. But still, same thing, no banners, no waving flavor people. All that is still prohibited. So it doesn't, the temporary sign doesn't relax having, you know, a banner or, you know, a pennant that flops around. It's all still. Why wouldn't you allow that for like the first week or whatever, you know, we're open now or whatever it says? They can have the signs, you know, open jersey mics or open, you know, dry cleaning, but we're not going to relax the other stuff that we have prohibited. In general, we put banners and balloons and flags, all that stuff for that. I guess I don't understand. The things that they've been putting out are material that floats in the air. To me, that was almost like a flood. And are we saying that they can or they can't do that? Cannot. Cannot? Yeah. You know, you mean those kind of, it looks like a raindrop that's on a pole and moves around when, Actually, I took it out, but I think the building commissioner had to put it back in. Pennants, banners, balloons, and flags. Is that what the pennants, I don't know what they're called is my point. I guess I had that out, but the building commissioner had that added back in, so I'll talk to him about that. Because I took that out, but he suggested that we keep it in. At some place in here, he had also suggested Yeah. The lights that go into the sky that go back and forth like that used to look. Spotlights. Yes. Yeah, I tried to take that out. I don't. And I said, I mean, I'll ask the board. I said to Robert, I wouldn't vote for that. So how does that be? Okay. They're used in War of the Worlds. So that's good, huh? But we also know temporary signs mean sidewalk, walkways, driveways. So they can't, you know, be right there. And then they need to go for the building department. So there's a process. They just can't just put them up. And then signs, no signs on billboards, trees, fences, all that. I'm sorry, for temporary signs, they have to go to the building department? Correct. What about the design review board? You're going to exempt them from that? Yeah. Presumably, because they, okay. Yeah. I mean, the signs they're probably going to get are probably like little, like small, like signs that, you know, like a metal sign that can go on the ground. I think they had those for the Dungadona's Jimmy John. You know, it seems to me that rather than put a ton of restrictions that say that, not that you can put up anything you want, but that they're, it's, it's kind of a less constrained set of guidelines, say for the first two weeks. You know, and then you begin to ease into what the town wants for actual design. Well, that's what the, that's what 502.4, in the yellow, that's what the building commissioner was saying that we could allow, having banners and balloons and flags, but... I don't completely agree with that, but I can have that discussion with him. I think you want some excitement in the town when there's something new, that's all. It doesn't really hurt the aesthetics long term for the town. Yeah. But Ira, you're not saying just a free-for-all. It's these kinds of things you think are okay. Sure, but there's going to be a lot more latitude there than there are. Oh, yeah. No, I just wanted to make sure. At first, I thought you were saying let them do whatever they want in that period. I don't know. So, yeah. Well, the problem, too, is that that period isn't defined. So, temporary signs are 30. And, you know, opening is, how long is an opening for? So, you could say for those sorts of, for a sign that moves, like a banner, a balloon, or flag, you could have it for one week.
Whatever. It doesn't matter. We'll figure out what makes the most sense. And then the following signs do not require a sign permit. So government signs, temporary construction signs, fuel pump signs, window signs. We don't have anything in that bylaw today that has that. And most towns have something in their bylaw that talks about that. Real estate signs, product display signs. And then he added public service signs, which I need to clarify what does that exactly mean. Temporary handwritten signs. I personally don't know what that means, so I'm going to ask him. What is the example? And then a phrase signs. He called it standing signs. So one's in the yellow at the very end of three ones that I wanted to just... So if I, I try to reach out to him after the meeting, but he was doing some inspections after, so I wasn't able to circle back on him before tonight's meeting, but. Robert, in this section, this isn't necessary, when you have to put up a DEP sign that you're under construction for the Wetlands Protection Act. It's not necessarily a government sign. It's a private sign, but it's required by the government. So think about that and make sure that we have something for that. And often people put those on trees or put it. And so we have to make it clear that you can't do that either. All right. So that is a very, very quick overview of what we're thinking. Try to. Make some changes that make sense, but also not bend backwards to release all the restrictions that the town has put in for all that kind of signage. But also give some people some flexibility to do some stuff if possible. And yes, Bill, we're not voting on anything tonight. We are still working on this, but this is just like a sneak peek so we can get ready for when we have a public hearing and actually have a final copy that we can actually really dive into. So I'm just looking at that public service signs. So I'm a notary public. Could I put a sign that is 60 square inches out in front of my house that says I'm a notary public and not have to ask permission for it? In a residential district? No. No. It says I don't need any permission for a public service sign. We have to fix that, Robert. Just going to say, open the door, a lawyer will slide right through. So you're asking what a public service sign is, and that's exactly what it is. That was part of the conversation that I was having, we were having with the building commissioner. He said it's perfectly clear, and I would say, not if you're a lawyer, it's not perfectly clear. I found my way right through this one. Walked right through that one. We also, I'd always tried to be opposed to the A-frame signs. We've been manning them in Wayland forever. So I don't know why he's a big advocate for that. Yeah, and we... We haven't wanted them for multiple reasons. One is because if the wind is high, they fly around. That's true. Yeah. What was the status of that chiropractor that had those seasonal mannequins out in front? Would that be allowed? I think those are great, but I don't know. He doesn't do it anymore, though. They weren't really signs. No, that's true. Holiday decorations. Yeah, they were holiday decorations. Yeah, but the fire department has them on Halloween in their front yards. All right. Yeah, I don't think there's anything that would prohibit that, is there? No, those are lawn decorations or something. They're not. I don't know. It's not in the book. I'll have to write another chapter on that one. Yeah. One of the things that I suggested to Robert is that... We reorganize this so that it's a little clearer starting out in the beginning. You can have signs. This is the size of the total signage you're allowed to have. You can break it up into these kinds of pieces so that it's a logical presentation for people who don't have a clue of what they're walking into so that they will know what the basics are and then The procedures that they have to go through to get them approved. Does that make sense? Yeah. Yeah. Better information in there. I think, Robert, you had added sort of the almost housekeeping section in the middle of the document. I think that that probably either belongs at the very beginning or at the very end of the speaking of organization of the information. It just suddenly appears in the middle, and then they start talking about what was added by the building department, and that's back to the signage guidelines, per se. Yeah, we're going to reorganize this a little bit. One second, get some more answers. Yeah, yeah. That's because you've got stuff that keeps coming in, that's why. Yeah, I mean, unfortunately, we didn't meet today, so I only had about an hour and a half to make some more changes, and then he wasn't there, so I couldn't dial in the last few questions I had to get. I honestly knew there was not going to be any kind of vote tonight anyways, but I wanted to at least give an update of what we're thinking. But now on the document I got from Tom White the other day, he had a list of signs that will not ever be allowed. I didn't see that in your copy. Did you just... Did Robert get the thing, Bill, or was it just to you? I didn't check that, but I'll forward it to you if he didn't. I think that, you know, it's like he added two pages to a three-page document. So it was a lot of stuff. I am not aware of that.
When you're done with it, if you want to send it to me and see all the ways I can break it and you need to add more limitations, feel free. The crusher test. I'm a very destructive lawyer. They have a cement test, you know, you can make a little cylinder of concrete. Yeah, my email said I reviewed the document as well as Tom Zuppa's comment and do not have any additional edits. They look good, but I think it will help create a better outcome for science in town. No, no, he sent me, you know, two pages of document. Yeah, that would help. I did not get that document. It's a secret. I was not supposed to let you know, I guess. Oh, well, it would be good if we all knew so that we could make sure we do what they want. And I'll send it to him. Well, yeah, I don't object to them. I just thought it was worthy of a lot of discussion. Right. And maybe there's a way that we can categorize them rather than having three pages. Yeah. I think it was a good start, Robert. And I thank you because this is not easy stuff to be working with. Yeah, but I think what I was talking about, why is the building commissioner involved? Eventually he needs to enforce this. So if he writes on it and he's like, He could enforce something differently or he can completely disagree and not enforce something because like, well, I don't agree with that. I don't care what the plan board says. I think overall he wants to work together and also wants to make sure whatever we write, he needs to be able to like, yep, I can sit behind that 100%. We're on the same page, which I don't have any issues with. Tom has been very, has some great ideas and he wants to make sure that we are working together. So, yeah. Great. But he had another paragraph in there we didn't talk about, about other celebrations where you can still do, you know, wavy clowns on sticks and things like that. I don't think we want to allow, you know, random people to be celebrating something every week and violate, you know, our intention. That's the tone up a little. That's a good point. I did also reach out to MAPC and I'm asking them what's the update on the ground matter solar bilar and they said they're going to be sending me something soon. So that would be the third article that we're working on at this point. It's the ground matter. And in the housekeeping, we'll probably be adding more stuff based on what KPLR thinks that we should be adding. Well, Amanda, the change to meet statue. So that'll have to go to town meeting, right, for a vote? Yeah. Yeah. They all have to go to town meeting. Yep. One of the problems with this stuff that we're just learning about, or we'll just be learning about from KP Law, is that we really do need to make some changes because our current bylaws are at odds with what the new state law is, and everybody's going to be confused if we don't change it. It's not real clear what the new state law is, which is why we asked to have the training session with KP Law for everybody, including the... I did go one with the AG's office and... I think they understand that the deadlines are pretty tight with all the changes. And they said none of the changes right now you have to require. The AG's office is not coming to each town and saying you must make the changes. They said we encourage making the changes because it will be confusing when someone comes in and you have to refer to statute and not the zoning bylaw. Because your bylaw is outdated. But there's no required mandate if you have to change it by this deadline. But it's like, encourage. Yeah, no, I mean, I'm sure that's true. The problem still is the zoning board has to enforce stuff and they need to know what it is they're enforcing. You know, the variance, all the variance stuff now is that's in place. So it just would be somewhat confusing if like, well, the bylaw says that, but the statute says this and we just haven't updated it yet. It just won't look good for the town. Yeah, and I don't think that the law is all that clear either. I think I found it confusing. Okay. Is there anything else? I just, Robert, I'm sorry. I missed that housing production plan meeting. Was it last night? I was away from Friday to Monday and we had a couple of incidents at the facilities over the weekend and I was working until late last night. Oh, no problem. No problem. We did have a housing production meeting for the steering committee. So it's made up to a few people from different communities, housing authority, planning board. Yeah. And then one member at large. So we just had a kickoff meeting for the consultants and two consultants to meet with the steering committee and just get a heads up of this is what we're looking forward to. And the staff is working with them every week to biweekly having meetings with them. And we have the first public meeting is on December 1st. At 6 to 8 o'clock, it'll be some snacks and refreshments. It'll be hybrid, so you can, if you don't want the refreshments and the snacks, you don't have to come to town meeting, town hall, but if you do, there'll be some snacks to be determined what exactly they will be, but something, maybe some subs or pizza, we're working on that. So that is coming up, and that'll be the first one, and be many outreach on this topic in the future. Because eventually the Planning Board needs to, Planning Board and the Slep Board need to eventually sign off on this at the end. So the Planning Board will be very involved at the end. Yep. Trust me, I would have rather have been at that meeting and that says a lot. I bet. Slightly separate topic. There's a document floating around called a quick guide to signage approvals. I think that the building commissioner and the EDC were working on it. I was asked a question. I had no idea what they were talking about. So I asked if I could have a copy of the document. I think it needs a few. tweaks for clarification in a few places. And I gather that the idea is to have a one-page document that guides individuals on how to get signs approved. It's simplistic and basically okay if you are a single business and you're You have the building is there and you're switching signage for your current business or a new business. But once you get into site plan where they're going to be putting in a new building or changing things that require site plan approval or get into special permit processes, I think they need to somehow either tell people that this is something very simple just for. You know, the specific circumstances or have a little bit more in there that, you know, if you're doing a new building, you got to come to boards and you'll get your approval at that time moving through that process. And what we usually do is when we have such a project, Robert gets the application and he shoots it out to all the other departments that need to have input, including. The Design Review Advisory Board. And then we get our comments back in the 30 days that are allowed. And then we move from there. And Bill, I don't think that the Design Review Advisory Board has the authority to extend the time for giving an advisory opinion. No, we've never tried to do that. Okay. Okay. In this document, I think it appeared that it was saying that. Really? Yeah. I guess I haven't seen it. The only way is if the applicant is, you know, has not submitted information and the board is asking, the board can ask the applicant to extend the deadline, which we've seen if they need to, like, you know, they need to have two meetings and something, but that's, but most of the time it's because of some kind of outside scenario where they just. Which board are we talking about? Design review board. Design review board. Yes, if they're just a freestanding building thing that doesn't have to go before other boards. If it has to go before the zoning board or the planning board, then the design review board doesn't have any leeway unless the planning board or the zoning board says Yep, we want you, you know, we're not happy with this. We want you to have more time. Or there's a new plan that's submitted and then they send it back to the design review board. Yeah, it's really, it's really. Otherwise it messes up the schedules. Yeah, it's, it's, it's a very rare scenario. Usually when, we usually want to get a bill call meeting within seven days and there'll be a meeting within, within two weeks of when, when I actually receive something. So they have a lot of time, they have, they have planning, they have about two to three weeks before the deadline even passes. So. Okay. It's just in case they need to have two meetings within that three days, which is happening. So, Bill, you haven't seen this either? I don't know what you're talking about. If you show me what it looks like, I'm a graphic guy. If I see the graphics on it, yeah, I've seen that. I've seen that, yeah. But I don't remember it saying anything about the DRB extending deadlines because we never talk about deadlines with our applicants. Regardless, it needs to be clinical a bit, so. Once it is cleaned up, I think that our board should say it because it affects the board. Okay. Is there anything else that anyone wants to talk about? Well, one thing, I would assume that the signage needs to be approved by the time we sign off on our approval. Wouldn't you agree? Yes. I just wanted, I mean, it's pretty obvious, but I wanted to make that comment. Oh, no, yeah, no. Okay. Nothing else? You're kidding. Anybody want to suggest new things to add to our list of things to work on? Certainly not until we meet with KP Law next week. Yeah. Yeah. And I hope everybody will plan on coming. And Robert, will you send Nick a specific note saying it would be very good if you came? Yeah. I believe it's hybrid, so I can never check. Yeah, I think it said it was. You could do it either way, but it would be best if you came in person, so I'm planning on going in person. How long is it supposed to go for? About an hour, maybe slightly more. Okay. Did you say there's food there? No. Yes. You can have lunch. You can go for the next day. Yeah, Ira, you bring it. I might bring dinner, actually. Sandwich-sized food that's going to be good. If you, now that, oh yeah, Liberty Pizza is now open, so, you know, getting your pizza back. Hold our meeting at the Liberty Pizza. That's right. I will say, I was at Monday night, the first day, and... Probably at least 15 high school kids walked in and I was like, Oh, great. I was getting packed. And so, but I think that's, they probably looked a little bit overwhelmed at the front, but I think they're very happy to get, you know, get some walk in. That was their neighborhood hangout and it's finally open again. Are all those buildings rented? Do you know? They look pretty empty to me. It's a shame. I don't know how they've lasted for that many years without doing anything. The dry cleaners that were there had kept, I was using them, they kept saying they were going to be moving back in, but I don't see them in there. Maybe the rent just got too high. But I think when somebody sees all the kids hanging around, I imagine, because there used to be a convenience store on the corner, I can't imagine they won't go back in. Somebody will open a convenience store there. Yeah, there should be. That's a neighborhood drop-in place. It's perfect. I think it's just the owner has very slowly moved his process. He got a little bit of pizza back in, but I think it's going to be a slow drip of getting the business back in. You know, building out the space and stuff. Yeah. I remember when the owner came before Design Review Board and he was sort of a no pressure, kind of taking it easy kind of guy. So I can see that. Was he the one who was arrested? No, there was somebody who worked at Liberty who was arrested. All right. Anyways. We don't want to talk about that. Yes. Where else are we going tonight? Okay. I move to adjourn. Okay. Somebody should do it. Are you going to? Well, Robin moved. I was going to give Bella a chance. Honest to God. I let it sit there for a few seconds. I move we adjourn. How's that? We have two of you. Thirded. We have two adjourned movements. All right. Okay. Robin Borgestedt. Yes. Ira Montague. Yes, please. Jesse Newberry, it's not that bad, Rob. Bill Sterling. Yes, thank you. Annette Lewis, yes. Thank you, Robert. Good night, everybody. Good night, everybody.
17 Deer Run Road, that's it. So moved. Second. You're slow tonight, Bill. All in favor. Robin Borgestedt. Yes. Bill Sterling. Yes. Ira Montague. Yes. Jesse Newberry. Yes. Annette Lewis. Yes. So that will be subject to releasing the ANR. We have to sign it, first of all. But actually releasing it will be subject to getting the paperwork. And Robert accompanies it with a memo. And the memo will say that once it's filed, you have to let us know that it was filed. And do they get a Mylar too, Robert, or not? I believe they gave me a Mylar. I will double check when I get back to the office tomorrow. I do believe I have a Mylar. Because there's no changes, I believe, to actually plan itself. So I think I have the Mylar itself, so I should be good. So that we could come in and sign at any time? Yeah. And then sign it from there. And then once we have anything, then the app or someone can pick it up. Okay. Everyone okay now with that? Are you okay, Bill? Whoever? No. No, the other Bill. I'm sorry. You get too confused. Yeah, yeah, I'm good. And thank you so much. Okay, thank you. Have a good night. You too. You too. Just want to see what else we got here. Review and approve the decision on PB2603, the site plan approval of the DPW's Happy Hollow Water Treatment Facility in Castle Road Pump Station. So I did get a request from the applicant client filter, on behalf of the applicant. I didn't submit the whole thing you were asking about the conditions. I just kind of... Quickly come and paste the conditions that will be the very end of the sections and then provided to them the information, but I didn't, that's, and they had no issues. Everything told me everything is pretty standard. The conditions, no surprises that they would be subject to, but. And I only have a few places where I wanted to just highlight that I, you know, reorganized or added information just to be thorough. One was the, they submitted a packet, one document with all this information. So I just kind of broke it down of all the different pieces of it, which included the plans, the stormwater design report, the traffic site analysis letter, the response to planning about third-party review, and... That's it. Yeah. And then they also added the presentation for the Planning Board on November 4th. So I just highlighted it. It's not something to be changed. It's just something to highlight when I just so people saw that this was a modification from what I sent out recently. Did you get resolution on Anette's question about the lights? I did not. I reached out to them and never got back to them.
Are there any comments from the board? No. Looks good. Okay. Robert, on the 2-2 with the additional application materials, somewhere we need to specify what the final approved plans are. So, because that's what we talk about throughout the decision. So, you need to figure out where we put that. This is Revives in Additional Application Material. So it would be all of this information. So it would be the plans, the site plans, which includes the site plans, the occupational plans, all the floor plans, that's the first bullet, the updated stormwater design report, the traffic site analysis letter. And then it would be, actually it would just be those three. So it would just be these three, because then after that is the responsive comments. So I can make a different bullet. I think it might be a good idea to make a different bullet and call it... Final approved plans, if that's what we've called it before in other decisions. And with the Planning Board presentation for the meeting, if that's, is that what you were, you were starting with your first bullet, the Town of Wayland, Massachusetts, Happy, Hello plans. You need to, I believe, say how many plan sheets there are, you know, what's in the package. Yeah.
And you picked off the traffic and site analysis. You should probably, in that original package that we got, not the original original, but the package that we got of additional materials, there were traffic, sound, and light, right? So we need to make sure that we've listed those. And that would probably be in the additional application materials. I'm looking at it actually on my screen because I had comments, so I'm not looking at. Oh, I don't even have it up on my screen anyway of yours. No, I'm just not sure what document you're talking about. In 2.2, they did a submission which was response to Planning Board and third-party review comments. And in there,
They had traffic report and a light report, I think, and traffic light and sound. So if you can just list those in that document, if that's what the document that it was in. I thought I just read that. Well, you've got traffic site analysis, but what's not there is. The sound isn't there. I don't know how you broke them apart. The response to the Planning Board and third-party comments was one letter, and it had several pieces to it. Yeah, you definitely lost one when you edited, didn't it? Yeah, I know, I just did. So you could put bullets underneath the bullet, that bullet, and have, if you know. No, it was there, yeah, I see it was there. It's right there. There it is. I knew it was there, I'm not like, I saw it. Because we're doing, I will fix this one. Okay. No, it's right there, that third party. And you wanted to say what was the response to, is that what you said? I just, if the response came in and it had those three attachments or whatever else it had attached to it, it should be included in that reference so that we know we received that material in that document.
For the final plans? No. That would be the additional materials. For the final plans, I think all we need are the plans, don't we? Yeah. This is the final plans, the stormwater design, and then the traffic analysis letter. But I'm not sure if you want that under 2.2 then. I'm getting confused. I'm not sure what you're asking. I can go over it with you tomorrow if you want, rather than... Yeah, I don't think we should be wordsmithing. Yeah, we weren't wordsmithing. We were actually trying to figure out. I think you're talking about this line here, the one in the green. I can't see. Is that on the screen? If it is, for some reason, I'm not seeing it. I just see everybody's faces. Do you all see it? Yeah, I can see it. We did. Great. It's gone now. I'll share it again. You're talking about the one in the green, the green line, the green highlight. We should break that down. Is that what you're saying? I would probably call that the actual plans that came in. Aren't the plans separate from the response to comments? And wasn't it in the response? It was all one document. It was all one giant PDF. I'm trying to find it so I can pull it up. That's okay. You don't have to. Then why don't you put it in revised additional application materials and then just pick up whatever should be in the final plans, and that would be the plans. And if the stormwater document is final, part of the plan. Yeah, I would say that stormwater one is final too.
I will make a modification to try to change it. Okay. Thank you. Depending on how the page is set up, and it'll probably be fine once you do what you need to do. But right now, between 2.5 and 2.6, if that's how it would wind up looking, I would put a page break.
2.5, 2.6. Right. But it might not need it when you add your new stuff. It might already go to the next page. Yeah. Okay. Okay. Let's figure out in the writing, the note, lighting analysis at page 29. Let's mention just three lighting fixtures, which I confirm. Page. Oh, yeah. No, it's in the plan. So they really do need to fix that and tell you what's what. I don't know if there's anybody on board. I'm not sure if there's anybody here. Can someone see if there's anybody from the team? Hold on. I see five attendees, but I can't see their names. Okay. Oh, sorry. Who are you looking for? Anybody from ClientVoter. Anybody can answer that question. William Ross and Margaret Ross. No, they must be neighbors. And Barbara DeMauro is a neighbor. Nope. And then there's just somebody who just says Zoom user. Nope. So. Anybody from Kleinfelder, raise your hand. Okay. I should have probably printed this out rather than having to look at it on the screen. Just want to make sure. And then at the very end, Robert, where it says record of vote, it's all of us. We already voted. Now we're just signing off on the decision. That's fine. I think. No, that's fine. Yeah, you did vote. Okay. How should we handle? The fixing of the... Should we approve this subject to Robert getting confirmation from the applicant on what's what and sorting through those plans? I think so. The record is closed. So technically, I think the applicant has to decide between the two plans, which is which. Yeah. They showed him features. Okay. Are there any other comments? No. Can I have a motion to approve the decision with Robert being authorized to figure out with the applicant which of the two plans they're going with for lighting, for the number of light fixtures? Is it two or is it three? So moved, I guess. Second. Long one. Jesse Newberry. Yes. Iron Montague. Yes. Bill Sterling. Yes. Robert and Borgested. Yes. Annette Lewis. Yes. Okay, Robert, let me end. As written, I'll be signing it, so let me know when I should come in and sign it. Hopefully tomorrow or Friday. Okay, but you have to hear from the applicant. Yeah, I'll call him along again. Okay. Well, that was good. Now what are we up to? Prevost revisions. Just one more thing. I just want to make sure. Okay. Robert and Bill worked on Revisions to the draft signage bylaw. And then they sent it to the building commissioner and he offered some comments, some of which. I found particularly confusing because I just wanted to make sure that I understood what they were taught, what he was talking about, the building commissioner. So Robert and I had a brief conversation with him today and sorted through some of them. And so I don't know if Bill or Robert wants to lead off the discussion, the overall overview, and then people can comment and we can go through the document. Yeah, I can speak up. You asked me to speak about it. I am afraid that because of these last-minute changes that, you know, I don't think the document is ready to vote on. Oh, no. Oh, we're not there yet. Oh, we're not there yet. I think what she's asking is to talk about. The things that you pointed out and the things that the overall opinions of what we should be getting out of this at the end. Oh, gosh, this is not even close to being done. I've been working on it again. It's not anywhere close. Okay, but I'm saying I don't think it's even ready enough to discuss because I'm putting things in here. How about an overview of the things that we're trying to fix? Yeah. I would disagree. I think Bill, I think you can... Okay, if we stay out of the weeds of wordsmithing, I think that's fine. But if we start getting into carving into paragraphs of new words... No, I don't think that's what we're doing. I think it's way too premature to do that. Yeah, I don't think that's what we're talking about. Okay. I think what we... We had a meeting last year in September. with Tom White from the ZVA, and he was voicing some things that he would like to see be done. I have talked about things that I would like to see be changed with temporary signs. One of the things that Tom White was not concerned about, but he wanted some changes, were they were approving signs by special permit on additional walls where The bylaw could be rewritten to allow for secondary signs and so that not everybody who has secondary sign has to come to the ZBA to get approval. So he wanted to see more flexibility so that they wouldn't be required to have a special permit every time they want. Someone would want to have a secondary sign. You know, for example, there's a doctor's office on Pellmire Road or It's off of, it's close by my road. It's off of, actually off Potsdam Potsdam Road where they have a sign in the front and in the back there's a sign that you enter. The sign on the back faces a parking lot and nobody sees it. But they could not do it under the bi-ready amount because that would be additional signs so they had to go to ZVA. That's one example of a thing that would be helpful for the bi-law to codify so they don't have to go back every time to a secondary sign. So that may be helpful for that one case, Robert, but here's an example of what I'm talking about. It's nitpicking a little detail that applies to one property and to start writing, rewriting the zoning bylaws because there will be an exception here or there, I think is absurd. That's what the zoning board is supposed to do. They make exceptions to the bylaw and that's what their job is. And they shouldn't be saying, oh, make a new law because we have a condition here. That's not covered in the bylaws. Otherwise, there would be no need for the CBA if everything was written down to every little exact condition in the town. I don't think they're talking about every exact condition. I think the overview that I understand is we can have 40 square feet of signage on a building and it's divided up. However, it gets divided up. What they wanted to be able to say was you can have a freestanding sign for a freestanding building, essentially, and if you can't see that building from a back parking lot or can't see what the building is from a back parking lot or from the side, They would like permission to be able to add signage, but I don't think that they're probably- Well, hold on. They have permission to make exceptions, to make variances. They already have permission to do that. They don't need us to write, that's okay for them to do. We did that for eight, 10 years before in the 1980s. You don't need to have a new bylaw for that. You were at the meeting with Tom, and I thought you all agreed that we should be doing this. No, I never agreed to writing such a detail into the bylaws. I think it's absurd. I would like to comment that that particular change, allowing sort of a backdoor sign, is very consistent with what we're trying to do with the whole, you know, reworking how the center of town fits so that we have shared parking on the back. And so... You know, we have a lot of places where that's true. You know, you have even go down to like Mel's where there's the sign on the front, but people park around the back and they could put a little sign by their door that says this is the entrance for Mel's. So I understand not wanting to make it so specific, but I would think this is the sort of thing that only people who are in this situation are going to be looking to put that extra sign back there and they still have to fit it within the 40 square feet. That's not true. That's not true. We made variances that allowed them to have an extra 40 square foot sign in another location. We did it when they were too far from the road to be able to be visible. We allowed them to make larger signs than 40. That is not a hard and fast rule. The ZBA has the right to make a difference. Right, and they still do, but this is, from what I understand, I know we're not going to get into the weeds, but we seem to be in them. Well, here we are. But I think that what this is allowing is just a saying that having a second sign around a blind side of a building is fine, but it's staying within the 40 square inches. If you want more than the 40 square inches and multiple signs, then you're back at the ZBA anyway. Inches, whatever. Yeah, I think that's true. Well, I think every one of these would be true. Every time they come up with a new condition, though, I think it's a dangerous path to go down where you write a new law every time there's a new condition that you think is fair for them to do. That's why you have a variance. That's why you have a ZBA. Fair question. When was the last time the sign of Iowa was actually... overhauled or actually looked at and actually modified at-town meeting. Years and years and years ago, I wrote one that we never went forward with. This is years, maybe 2000. So we're talking about, we're not talking about a change that just came up in the last year, and we modified the zoning pilot, you know, within four years, and now OPC is something else we need to change. This, we're looking at, this is two people from, including me and the building commissioner, coming in and actually having fresh eyes. I mean, I've been here for four years, but the building commissioner has been here for a year, looking with fresh eyes and saying, how can we improve it and make it easier, not just for ZPA, but for property owners to come in, how to make it so easy. Probably not carrying the Brenna every time they want to have additional sign on the back. What benefit does it actually have for the ZBA to make them go through this all the time? So that's my counterpoint. This is not just like one little small change because we missed it. This is, we are, there's actually main things in here we're looking at that from using from our past experience, from my experience in the past, and also from the building commissioner, and from a city point of view, and also from, he worked for the city garden for many years too. So trying to find out how to make it easier for people to actually locate business, but then also locate their signs too. How does everybody else feel about that, Ira and Jesse?
Can you repeat what you just said in terms of... We're trying to make it... We're not... We both had... Building Commission and I have... We have not touched the sign by law since we got here. Right. Looking at some fresh eyes and trying to bring some new ideas or listen to the ZBH here and say, we might be very easy. And it's a given ZBH here. It'd be easy to make it... We'll have a little bit more flexibility with the location of signage for secondary sign. That'd be helpful, so... That was something that came directly from the ZBA chair who oversees these special permits. And I do agree with Bill that, yeah, you can get a variance by sign, but special permits is the way to do it. Are we really going to be pushing everybody for a special permit every time for these kind of signs? Because not just here, but, you know, the plaza for Starbucks. They have the Chase Bank and the Jersey Mikes. They all have to go for the same thing. The signs on the back and the signs on the side for the same thing, for secondary signs. But if they're staying within the 40th number, then they can do it. If they're not staying within the 40 number, then they have to go to the ZBA for relief. Wouldn't change. So it goes ZBA for that, so. Let me do this. Let me go through the main changes so that everybody can see what we're thinking about. And we still have a lot of work to figure out all of this, but we are getting input from the Building Commissioner. We've had discussions today with the Playboy Chair and the Building Commissioner. And then I have some more questions for the Building Commissioner to some stuff he gave me. I want to also clarify and make sure I understand what he's looking for. Well, let me ask you what... What does the building commissioner have to do with signage in the town? He's in charge of zoning. He has to approve his signs. Right, we set up the criteria of what it's supposed to look like. But also, Ira, he needs enforces. So if there's something in here that he doesn't understand or can't enforce, that's not helpful. It's not helpful for him to have sections. Are you looking for him to input the font or should it be gold leaf or background color? No. The size and the location and the weather, how it's lighted, that kind of stuff. All right. So we added new definitions, talking about what a sign is, what the temporary sign is, and display, trying to define that. That's under section one. Section five is what we had the smallest section, and that was talking about maximum one sign per each business. And then we get to the part about the secondary sign. So one secondary sign, you can have one secondary sign on a different wall. We're just going to revise that to clean that up to make sure it looks correctly. Window signs can come no more than 30% of the total window space. But that's also included in the 40. Correct. Yep. Size. I didn't know that. Is that what that says? Well, it wasn't required. That's in addition to the 40, right? Which is why I talked to the building commissioner today because I couldn't figure out, you know, where we were. That's what he said. Yeah. So one thing. I didn't catch that line. Display area for a free sign sign. Cannot shout. Not exceed 32 square feet. That's just a placeholder for now. And in the last case, 501.2.7, any case, you can go to ZBA. So if you have a bigger free setting sign, you want to have more window sign space, all of this is a catch-all for a special permit from the ZBA. So that's just the top part. And we're still looking to clean this up to make sure it's correct. Going down. A lot of this is the same language, just express and put on different lines to make sure it's much more readable. But also adding that signs cannot be attached to roofline nor mounted on the roof. And that's something that Bill mentioned that we don't want to have, we're not into having signs on the roof and it looks tacky. Also, making sure we have a path for signs for non-profit education and religious uses for the Dover Amendment, making sure that we have the approval to do that through site plan. But the dimensions must still apply. So we're not giving the waivers on that, just making it a little bit easier because we don't have that today. So signs cannot be blinking, cannot be moving, flashing, all of that. That's still... That was always in there, yeah. Signs located cannot be internally limited. Backlight opaque sign material and gooseneck styles are allowed. So you can do gooseneck style fixtures. You can do backlight opaque signs. Those are allowed. And that would be a new change. Also, when we're going here, we're trying to make sure that no sign is going to be illuminated no longer than 30 minutes before opening and then 30 minutes after closing of any store or business. Now, I would say, I thought about this for a while and I know this is pretty standard. I know the building commissioner chimed in and said this is pretty standard. We thought about turning the light off when it closes, but I think for a safety point of view, if you have a business and a woman is closing a store and Having it 30 minutes after closing would help them so that they can get to their parking lot so that it doesn't go pure dark. If you're in applause and all the lights turn off, you know, you have at least a little time to turn the lights off so that it's not just, you know, they have a chance to get in the parking lot so they can feel a little safer. That was my opinion of keeping it 30 minutes before and 30 minutes after just from a city point of view, having the extra light. Yep. And then including all the, this is all new stuff, but it would be, what, you know, what do you need for a sign permit? What do you need to apply for? What, who do you, who do you apply for sign with? And that's the zoning enforcement officer, which is the building commissioner. And what you need to include, all that, senators, all that, this is all new. Talking about signs under the Mixed Use Overlay, how that is exempt from the Design View Board. All signs must meet the standards in Section 23. Time Limit. This is something we need to look into, make sure it's correct. But it says right now that we need to approve or disapprove any signs within three days. However, Or should fail to approve within 30 days and it should be approved. But if they need to do a design review board, design review board could take up to 30 days. So I need to talk to the building commissioner about this one to make sure we're on the same page in this. Right, because you want the design review board to have their full time to do the review without something being considered automatically approved. Yeah, I mean, the zoning enforcement officer can deny the application. I know, but that's messy. Yeah, we need to make sure a fee schedule that goes through the building department. And then if a business closes, I'll sign advertising. I'll sign advertising that the closed business should be removed from the site within 45 days. So some imagined number, I'm not sure what the imagined number is, but just a placeholder for now. One of the other reasons why we wanted to make some changes is for temporary signs. All these sections here, anything that says on the line and bolded is all existing. But we have run into the problem with new businesses coming in and they want to have a temporary sign for the new coffee shop or the new donut shop. They want to have some kind of sign. They're doing it anyways, so how can we regulate it and give them some guidance? So one of the ideas we thought of was allowing them to have a temporary sign for 30 days. And we've done that right now off the books and it's worked fine. And they're okay with a small sign when people know that their dry cleaning place is open now. But still, same thing, no banners, no waving flavor people. All that is still prohibited. So it doesn't, the temporary sign doesn't relax having, you know, a banner or, you know, a pennant that flops around. It's all still. Why wouldn't you allow that for like the first week or whatever, you know, we're open now or whatever it says? They can have the signs, you know, open jersey mics or open, you know, dry cleaning, but we're not going to relax the other stuff that we have prohibited. In general, we put banners and balloons and flags, all that stuff for that. I guess I don't understand. The things that they've been putting out are material that floats in the air. To me, that was almost like a flood. And are we saying that they can or they can't do that? Cannot. Cannot? Yeah. You know, you mean those kind of, it looks like a raindrop that's on a pole and moves around when, Actually, I took it out, but I think the building commissioner had to put it back in. Pennants, banners, balloons, and flags. Is that what the pennants, I don't know what they're called is my point. I guess I had that out, but the building commissioner had that added back in, so I'll talk to him about that. Because I took that out, but he suggested that we keep it in. At some place in here, he had also suggested Yeah. The lights that go into the sky that go back and forth like that used to look. Spotlights. Yes. Yeah, I tried to take that out. I don't. And I said, I mean, I'll ask the board. I said to Robert, I wouldn't vote for that. So how does that be? Okay. They're used in War of the Worlds. So that's good, huh? But we also know temporary signs mean sidewalk, walkways, driveways. So they can't, you know, be right there. And then they need to go for the building department. So there's a process. They just can't just put them up. And then signs, no signs on billboards, trees, fences, all that. I'm sorry, for temporary signs, they have to go to the building department? Correct. What about the design review board? You're going to exempt them from that? Yeah. Presumably, because they, okay. Yeah. I mean, the signs they're probably going to get are probably like little, like small, like signs that, you know, like a metal sign that can go on the ground. I think they had those for the Dungadona's Jimmy John. You know, it seems to me that rather than put a ton of restrictions that say that, not that you can put up anything you want, but that they're, it's, it's kind of a less constrained set of guidelines, say for the first two weeks. You know, and then you begin to ease into what the town wants for actual design. Well, that's what the, that's what 502.4, in the yellow, that's what the building commissioner was saying that we could allow, having banners and balloons and flags, but... I don't completely agree with that, but I can have that discussion with him. I think you want some excitement in the town when there's something new, that's all. It doesn't really hurt the aesthetics long term for the town. Yeah. But Ira, you're not saying just a free-for-all. It's these kinds of things you think are okay. Sure, but there's going to be a lot more latitude there than there are. Oh, yeah. No, I just wanted to make sure. At first, I thought you were saying let them do whatever they want in that period. I don't know. So, yeah. Well, the problem, too, is that that period isn't defined. So, temporary signs are 30. And, you know, opening is, how long is an opening for? So, you could say for those sorts of, for a sign that moves, like a banner, a balloon, or flag, you could have it for one week.
Whatever. It doesn't matter. We'll figure out what makes the most sense. And then the following signs do not require a sign permit. So government signs, temporary construction signs, fuel pump signs, window signs. We don't have anything in that bylaw today that has that. And most towns have something in their bylaw that talks about that. Real estate signs, product display signs. And then he added public service signs, which I need to clarify what does that exactly mean. Temporary handwritten signs. I personally don't know what that means, so I'm going to ask him. What is the example? And then a phrase signs. He called it standing signs. So one's in the yellow at the very end of three ones that I wanted to just... So if I, I try to reach out to him after the meeting, but he was doing some inspections after, so I wasn't able to circle back on him before tonight's meeting, but. Robert, in this section, this isn't necessary, when you have to put up a DEP sign that you're under construction for the Wetlands Protection Act. It's not necessarily a government sign. It's a private sign, but it's required by the government. So think about that and make sure that we have something for that. And often people put those on trees or put it. And so we have to make it clear that you can't do that either. All right. So that is a very, very quick overview of what we're thinking. Try to. Make some changes that make sense, but also not bend backwards to release all the restrictions that the town has put in for all that kind of signage. But also give some people some flexibility to do some stuff if possible. And yes, Bill, we're not voting on anything tonight. We are still working on this, but this is just like a sneak peek so we can get ready for when we have a public hearing and actually have a final copy that we can actually really dive into. So I'm just looking at that public service signs. So I'm a notary public. Could I put a sign that is 60 square inches out in front of my house that says I'm a notary public and not have to ask permission for it? In a residential district? No. No. It says I don't need any permission for a public service sign. We have to fix that, Robert. Just going to say, open the door, a lawyer will slide right through. So you're asking what a public service sign is, and that's exactly what it is. That was part of the conversation that I was having, we were having with the building commissioner. He said it's perfectly clear, and I would say, not if you're a lawyer, it's not perfectly clear. I found my way right through this one. Walked right through that one. We also, I'd always tried to be opposed to the A-frame signs. We've been manning them in Wayland forever. So I don't know why he's a big advocate for that. Yeah, and we... We haven't wanted them for multiple reasons. One is because if the wind is high, they fly around. That's true. Yeah. What was the status of that chiropractor that had those seasonal mannequins out in front? Would that be allowed? I think those are great, but I don't know. He doesn't do it anymore, though. They weren't really signs. No, that's true. Holiday decorations. Yeah, they were holiday decorations. Yeah, but the fire department has them on Halloween in their front yards. All right. Yeah, I don't think there's anything that would prohibit that, is there? No, those are lawn decorations or something. They're not. I don't know. It's not in the book. I'll have to write another chapter on that one. Yeah. One of the things that I suggested to Robert is that... We reorganize this so that it's a little clearer starting out in the beginning. You can have signs. This is the size of the total signage you're allowed to have. You can break it up into these kinds of pieces so that it's a logical presentation for people who don't have a clue of what they're walking into so that they will know what the basics are and then The procedures that they have to go through to get them approved. Does that make sense? Yeah. Yeah. Better information in there. I think, Robert, you had added sort of the almost housekeeping section in the middle of the document. I think that that probably either belongs at the very beginning or at the very end of the speaking of organization of the information. It just suddenly appears in the middle, and then they start talking about what was added by the building department, and that's back to the signage guidelines, per se. Yeah, we're going to reorganize this a little bit. One second, get some more answers. Yeah, yeah. That's because you've got stuff that keeps coming in, that's why. Yeah, I mean, unfortunately, we didn't meet today, so I only had about an hour and a half to make some more changes, and then he wasn't there, so I couldn't dial in the last few questions I had to get. I honestly knew there was not going to be any kind of vote tonight anyways, but I wanted to at least give an update of what we're thinking. But now on the document I got from Tom White the other day, he had a list of signs that will not ever be allowed. I didn't see that in your copy. Did you just... Did Robert get the thing, Bill, or was it just to you? I didn't check that, but I'll forward it to you if he didn't. I think that, you know, it's like he added two pages to a three-page document. So it was a lot of stuff. I am not aware of that.
When you're done with it, if you want to send it to me and see all the ways I can break it and you need to add more limitations, feel free. The crusher test. I'm a very destructive lawyer. They have a cement test, you know, you can make a little cylinder of concrete. Yeah, my email said I reviewed the document as well as Tom Zuppa's comment and do not have any additional edits. They look good, but I think it will help create a better outcome for science in town. No, no, he sent me, you know, two pages of document. Yeah, that would help. I did not get that document. It's a secret. I was not supposed to let you know, I guess. Oh, well, it would be good if we all knew so that we could make sure we do what they want. And I'll send it to him. Well, yeah, I don't object to them. I just thought it was worthy of a lot of discussion. Right. And maybe there's a way that we can categorize them rather than having three pages. Yeah. I think it was a good start, Robert. And I thank you because this is not easy stuff to be working with. Yeah, but I think what I was talking about, why is the building commissioner involved? Eventually he needs to enforce this. So if he writes on it and he's like, He could enforce something differently or he can completely disagree and not enforce something because like, well, I don't agree with that. I don't care what the plan board says. I think overall he wants to work together and also wants to make sure whatever we write, he needs to be able to like, yep, I can sit behind that 100%. We're on the same page, which I don't have any issues with. Tom has been very, has some great ideas and he wants to make sure that we are working together. So, yeah. Great. But he had another paragraph in there we didn't talk about, about other celebrations where you can still do, you know, wavy clowns on sticks and things like that. I don't think we want to allow, you know, random people to be celebrating something every week and violate, you know, our intention. That's the tone up a little. That's a good point. I did also reach out to MAPC and I'm asking them what's the update on the ground matter solar bilar and they said they're going to be sending me something soon. So that would be the third article that we're working on at this point. It's the ground matter. And in the housekeeping, we'll probably be adding more stuff based on what KPLR thinks that we should be adding. Well, Amanda, the change to meet statue. So that'll have to go to town meeting, right, for a vote? Yeah. Yeah. They all have to go to town meeting. Yep. One of the problems with this stuff that we're just learning about, or we'll just be learning about from KP Law, is that we really do need to make some changes because our current bylaws are at odds with what the new state law is, and everybody's going to be confused if we don't change it. It's not real clear what the new state law is, which is why we asked to have the training session with KP Law for everybody, including the... I did go one with the AG's office and... I think they understand that the deadlines are pretty tight with all the changes. And they said none of the changes right now you have to require. The AG's office is not coming to each town and saying you must make the changes. They said we encourage making the changes because it will be confusing when someone comes in and you have to refer to statute and not the zoning bylaw. Because your bylaw is outdated. But there's no required mandate if you have to change it by this deadline. But it's like, encourage. Yeah, no, I mean, I'm sure that's true. The problem still is the zoning board has to enforce stuff and they need to know what it is they're enforcing. You know, the variance, all the variance stuff now is that's in place. So it just would be somewhat confusing if like, well, the bylaw says that, but the statute says this and we just haven't updated it yet. It just won't look good for the town. Yeah, and I don't think that the law is all that clear either. I think I found it confusing. Okay. Is there anything else? I just, Robert, I'm sorry. I missed that housing production plan meeting. Was it last night? I was away from Friday to Monday and we had a couple of incidents at the facilities over the weekend and I was working until late last night. Oh, no problem. No problem. We did have a housing production meeting for the steering committee. So it's made up to a few people from different communities, housing authority, planning board. Yeah. And then one member at large. So we just had a kickoff meeting for the consultants and two consultants to meet with the steering committee and just get a heads up of this is what we're looking forward to. And the staff is working with them every week to biweekly having meetings with them. And we have the first public meeting is on December 1st. At 6 to 8 o'clock, it'll be some snacks and refreshments. It'll be hybrid, so you can, if you don't want the refreshments and the snacks, you don't have to come to town meeting, town hall, but if you do, there'll be some snacks to be determined what exactly they will be, but something, maybe some subs or pizza, we're working on that. So that is coming up, and that'll be the first one, and be many outreach on this topic in the future. Because eventually the Planning Board needs to, Planning Board and the Slep Board need to eventually sign off on this at the end. So the Planning Board will be very involved at the end. Yep. Trust me, I would have rather have been at that meeting and that says a lot. I bet. Slightly separate topic. There's a document floating around called a quick guide to signage approvals. I think that the building commissioner and the EDC were working on it. I was asked a question. I had no idea what they were talking about. So I asked if I could have a copy of the document. I think it needs a few. tweaks for clarification in a few places. And I gather that the idea is to have a one-page document that guides individuals on how to get signs approved. It's simplistic and basically okay if you are a single business and you're You have the building is there and you're switching signage for your current business or a new business. But once you get into site plan where they're going to be putting in a new building or changing things that require site plan approval or get into special permit processes, I think they need to somehow either tell people that this is something very simple just for. You know, the specific circumstances or have a little bit more in there that, you know, if you're doing a new building, you got to come to boards and you'll get your approval at that time moving through that process. And what we usually do is when we have such a project, Robert gets the application and he shoots it out to all the other departments that need to have input, including. The Design Review Advisory Board. And then we get our comments back in the 30 days that are allowed. And then we move from there. And Bill, I don't think that the Design Review Advisory Board has the authority to extend the time for giving an advisory opinion. No, we've never tried to do that. Okay. Okay. In this document, I think it appeared that it was saying that. Really? Yeah. I guess I haven't seen it. The only way is if the applicant is, you know, has not submitted information and the board is asking, the board can ask the applicant to extend the deadline, which we've seen if they need to, like, you know, they need to have two meetings and something, but that's, but most of the time it's because of some kind of outside scenario where they just. Which board are we talking about? Design review board. Design review board. Yes, if they're just a freestanding building thing that doesn't have to go before other boards. If it has to go before the zoning board or the planning board, then the design review board doesn't have any leeway unless the planning board or the zoning board says Yep, we want you, you know, we're not happy with this. We want you to have more time. Or there's a new plan that's submitted and then they send it back to the design review board. Yeah, it's really, it's really. Otherwise it messes up the schedules. Yeah, it's, it's, it's a very rare scenario. Usually when, we usually want to get a bill call meeting within seven days and there'll be a meeting within, within two weeks of when, when I actually receive something. So they have a lot of time, they have, they have planning, they have about two to three weeks before the deadline even passes. So. Okay. It's just in case they need to have two meetings within that three days, which is happening. So, Bill, you haven't seen this either? I don't know what you're talking about. If you show me what it looks like, I'm a graphic guy. If I see the graphics on it, yeah, I've seen that. I've seen that, yeah. But I don't remember it saying anything about the DRB extending deadlines because we never talk about deadlines with our applicants. Regardless, it needs to be clinical a bit, so. Once it is cleaned up, I think that our board should say it because it affects the board. Okay. Is there anything else that anyone wants to talk about? Well, one thing, I would assume that the signage needs to be approved by the time we sign off on our approval. Wouldn't you agree? Yes. I just wanted, I mean, it's pretty obvious, but I wanted to make that comment. Oh, no, yeah, no. Okay. Nothing else? You're kidding. Anybody want to suggest new things to add to our list of things to work on? Certainly not until we meet with KP Law next week. Yeah. Yeah. And I hope everybody will plan on coming. And Robert, will you send Nick a specific note saying it would be very good if you came? Yeah. I believe it's hybrid, so I can never check. Yeah, I think it said it was. You could do it either way, but it would be best if you came in person, so I'm planning on going in person. How long is it supposed to go for? About an hour, maybe slightly more. Okay. Did you say there's food there? No. Yes. You can have lunch. You can go for the next day. Yeah, Ira, you bring it. I might bring dinner, actually. Sandwich-sized food that's going to be good. If you, now that, oh yeah, Liberty Pizza is now open, so, you know, getting your pizza back. Hold our meeting at the Liberty Pizza. That's right. I will say, I was at Monday night, the first day, and... Probably at least 15 high school kids walked in and I was like, Oh, great. I was getting packed. And so, but I think that's, they probably looked a little bit overwhelmed at the front, but I think they're very happy to get, you know, get some walk in. That was their neighborhood hangout and it's finally open again. Are all those buildings rented? Do you know? They look pretty empty to me. It's a shame. I don't know how they've lasted for that many years without doing anything. The dry cleaners that were there had kept, I was using them, they kept saying they were going to be moving back in, but I don't see them in there. Maybe the rent just got too high. But I think when somebody sees all the kids hanging around, I imagine, because there used to be a convenience store on the corner, I can't imagine they won't go back in. Somebody will open a convenience store there. Yeah, there should be. That's a neighborhood drop-in place. It's perfect. I think it's just the owner has very slowly moved his process. He got a little bit of pizza back in, but I think it's going to be a slow drip of getting the business back in. You know, building out the space and stuff. Yeah. I remember when the owner came before Design Review Board and he was sort of a no pressure, kind of taking it easy kind of guy. So I can see that. Was he the one who was arrested? No, there was somebody who worked at Liberty who was arrested. All right. Anyways. We don't want to talk about that. Yes. Where else are we going tonight? Okay. I move to adjourn. Okay. Somebody should do it. Are you going to? Well, Robin moved. I was going to give Bella a chance. Honest to God. I let it sit there for a few seconds. I move we adjourn. How's that? We have two of you. Thirded. We have two adjourned movements. All right. Okay. Robin Borgestedt. Yes. Ira Montague. Yes, please. Jesse Newberry, it's not that bad, Rob. Bill Sterling. Yes, thank you. Annette Lewis, yes. Thank you, Robert. Good night, everybody. Good night, everybody.