November 10, 2026 – Conservation Commission – Video & Transcript
November 10, 2026 - Conservation Commission
I'd like to begin the Conservation Commission meeting for November 10, 2026. The location for in-person meetings is wheelchair accessible, and if you need other accommodations in order to participate in the meeting, please contact Wayland's ADA coordinator at 508-358-7755 at least two business days in advance of the meeting. While the municipality will do its best to accommodate you, certain accommodations may require the hiring of outside contractors who may not be available if requested immediately before the meeting.
This meeting may be recorded, and if recorded, it will be available to the public on WACAM as soon as possible. After the meeting, the public is excluded from executive sessions. In pursuant to Chapter 2 of the Acts of 2025, this meeting will be conducted in remote access, of course, with applicable law. If this meeting has remote access only, which it does, no in-person attendance by the members of the public will be permitted.
This meeting is remote access. One may watch or may participate remotely. The meeting link that can be found at the following link. In required by law or allowed by myself, persons wishing to provide public comment or otherwise participate in the meeting may do so as the remote access is applicable. Public comment should be limited to two minutes per person. With that all said, I see Lisa Aubin, Luke Legere, Barbara Howell.
Cliff Lewis and John Storer is just coming in. Myself, Sean Pair is all dialing in remotely. And Linda Hansen is dialing in from the town's building. With that, excuse me, let's kick this off here. The public hearing says 2A.
This is MWRA Interconnection and Happy Hollow Water Treatment Facility, DEP, File Number 322-1068. It's a continued notice of intent filed pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by the Wayland Department of Public Works for the construction of new water infrastructure in Wayland. The proposed work includes a connection of the MWRA water system, construction of a pump station and water treatment facility, and the replacement of a water main.
Areas within 100 feet of a bordering vegetated wetland and bank, bordering land subject to flooding, and a 200-foot riverfront area. The project shown on Wayland Assessor Map 42C, 42D, 42B, 43A, 37, 38, and 33. Linda. I believe we have a project team here that can give us go over what the newest material and the changes and revisions. Okay.
If I might, I'll start off. My name is Tom Holder. I'm the Public Works Director. One bit of housekeeping. We have somebody from the design team sitting in attendees, Michael Hansen. I wonder if he could be promoted. Yeah. One second here. Only one Hansen per meeting. I'm sorry.
Like in Alaska, where two senators run with the same name. Right, Dan Sullivan. How are you going to do that? There you go. She'll be coming over there pretty soon.
Great. All right. Well, I'll get underway. With me is the design team, Kleinfelder. We've got a number of representatives here on the meeting. And I think what I'll do is just hand it over to Kirsten, who is the lead. And I believe Kirsten's got just a short PowerPoint that will kind of guide our conversation relative to where we've been focusing our attention since the last hearing.
Yeah, thank you, Tom. Hi, everybody. Kirsten Ryan from Kleinfelder, the project manager for this project. Yeah, just a small handful of slides. We went through kind of an overview in detail last time, so I'm just going to present what's changed since the last hearing. So the hearing was on September 30th.
We went on a site walk with members of the Conservation Commission and with Linda on October 9th. Walked around at the Happy Hollow facility area. That was very helpful. As a result of that walk, we identified where there were some...
Trees that might be in conflict with a water main alignment. So we did make some adjustments, which I'll show you in a minute. We also received through the site plan review process for with the planning board, we got some comments from the third party reviewer that was hired and got those comments on the 26th. So we weren't really able to respond during the hearing on the 30th, but we subsequently have written a response to them.
Dated October 28th and then at the planning board hearing last week. Yes, on the 4th, the board voted to close the hearing and they were happy with the responses to those comments.
So for the Conservation Commission, we submitted revisions on November 4th. Those kind of one of the main revisions we submitted was a new landscape plan prepared for the Happy Hollow Water Treatment Facility where we have been able to provide replacement tree planting for much of the impacts. And I'll walk you through that. So that's a new sheet, Sheet 210.
In the drawing set in 211, I believe, with the planting plan. Just some sort of housekeeping. We, I think, since the initial filing, moved the Happy Hollow Water main.
Portion of the project into, so there's two contracts for this project that will be bid. One will be the Happy Hollow Water Treatment Facility, and now the water main associated with it in the prior filing. That had been part of the interconnection piece where we had originally put all of the pipeline work together in one contract. We decided to split it differently. The Happy Hollow Water Main Realignment I just mentioned, and I'll show you.
Other minor revisions to address comments through the planning board hearing, stormwater report, added some details, things like that. We also, through the site plan review process, made modifications to the Castle Road pump station, added native shrubs and grasses. There aren't any wetland impacts there, and there aren't any tree removal greater than diameter, six-inch diameter.
So just kind of as a side note. So first I will show you, and feel free to interrupt me with questions as I go. So this just kind of depicts the changes at the Happy Hollow water main site. So this is the pipeline that's going to be carrying the finished water from the treatment facility. The red is the new alignment and the orange dotted line is the original alignment.
So we found that our survey had some incomplete information when we walked out there. And so this pipeline was proposed to go kind of through the meadow, cut through the meadow. And there are some trees that are circled here in yellow that we can see. It also extended onto this paved driveway, which really wasn't necessary. So we realigned this. It's further away from the resource areas. The red here, it avoids these trees.
That's the different, the revised portion is pretty much up to right here. And then the portion further to the east, which we also walked along, is unchanged. Pearson, you're far enough away from those trees to be out of their root zone, are you not? Oh, yes. I mean, this is probably 30 feet away from these trees. Thank you. Okay. And then I mentioned the planting plan, which I'll show you in a second.
Yeah, we dove a little further into the tree replacements requirements, and in our revised filing, we prepared a cover letter, which kind of summarizes this, but I have the tables here for you just to show. The impacts split out by Chapter 194 and Chapter 193 impacts. So for Chapter 193,
The Happy Hollow Water Treatment Facility does have 23 trees required to be removed, about 200 inches DBH total. And so the required replacement, as we understand, is about 50% or 100 inches DBH. So we have been able to fully achieve that on site at the facility.
The other portion of the project, the transmission main alignment that's along the Hultman Corridor parallel to the Hultman Aqueduct, also requires some removal of 32 trees, totaling 124 inches DBH, which is broken down here by size in the table below that. And, you know, the Chapter 194 lays out specific requirements for replacement.
We aren't able to replace those trees in situ along the Hultman Corridor, along the transmission main alignment due to space constriction. So we try to find opportunities at the Happy Hollow site to do so. There's not really sufficient space in the floodplain, like in adjacent to the wetland resource areas. So we're not really able to fully replace in the same.
Resource Zone, I guess, as we would like to. And I'll show you kind of why. But elsewhere at the site, we think we've been able to achieve it. So to the extent possible. And there are some site constraints there too. But I believe there's about maybe about 85 inches of DBH that will need to be mitigated offsite. So we're going to have the contract documents.
Have the contractor do a pre-construction survey just to confirm quantities that are present and that will be removed so we can be sure to be accurate. So I was just going to show folks this plan. We worked with our landscape architect. You know, he looked.
Closely at the guidance from the Conservation Commission on the website, planting lists, and chose the plantings from that. He also checked in with local nurseries on availability for specific sizing and just to make sure that he was selecting species that would likely to be available. So this planting list reflects
Chapter 130, sorry, 130, 193 mitigation, which requires 100 inches DBH. And so we kind of have the breakdown here by size. And this is not my area of expertise. So I'll be happy to try to answer any questions. But in general, to the north, let me get my laser pointer. Let's see what I'm doing.
A little bit better. Okay. So if you recall, this area up here is where there is some existing infrastructure that will be rendered obsolete by the construction of the new facility. So once the new facility is up and running and everything's signed off on and activated, the next step will be the contractor coming in and demolishing the temporary treatment system and the older buildings here, which are located
Within the 100-foot buffer and riverfront. This area just outside of our limit disturbance here is a gravel roadway that the DPW needs to continue to use because the wells are out here. There's one here, one here. They need to get access to the wells going forward for their ongoing operation and maintenance.
So there's not a whole lot of space here, but we did propose to plant some trees in here. There's a cherry, black cherry, some barch trees, hickory, and yeah, a red maple, I believe, yeah. So this is kind of where we've put the taller trees that we want to plant. Moving up to the kind of
Upper upland area here out of the floodplain and out of the riverfront. We have tried to put trees within reason that are not going to be able to impede the operation and maintenance of the facility too much. Trying to keep smaller species without huge tall trees and large limbs that could fall down on fences and cause maintenance headaches. So we've clustered some
Trees here, I think this is sassafras, and then some amelancher and sassafras in here, and then some other trees in this sort of, I don't know, what do you want to call it, an island near the parking area here. This slope here, we didn't want to have like trees on this upper upslope here that might fall over and hit the fences, so this is going to be shrugged planting area.
Over here, this is like the toe of the slope along the limit of disturbance near the edge of it, where they've also proposed some trees. I think these are mostly evergreens down here. I think the next table actually shows these better. So this is the Chapter 194 planting list. Yeah, evergreens, cedar, down here. So that's...
What we have proposed, I think that is all I had to present. I'm happy to take questions. Hoping, yeah, we're looking forward to moving to the next stage of the process. Okay, thank you. Linda, we'll start with you, please. Kristen, can you go to the previous slide? Or the one before that, actually. So you're removing, it says here you're moving.
Oh, requiring removal. 32 trees. That's what it says here in the second table, right? 1A? Yeah, this is in the, sorry, wetland. Okay. Yeah, subject to chapter 194 along the transmission main alignment. Yeah. So is the 124 total DBH, is that what you need to replace them with, or is that the total DBH? That's the total DBH. This is the breakdown here.
Yeah, I don't think that's correct. I mean, you have two trees that are already 24 inches, so I don't think that value is correct. It looks like it says 180 on the right, in the text on the right transmission. Yeah, maybe this isn't typo. Because if you have 18 trees between 12 and 18 inches, that alone is well more than 100. Yeah, maybe this might, yeah, that might be wrong. Okay.
All right, just wondering. Yeah, this might be like what we're trying to accomplish. Sorry. Okay. Let's see. I'm not sure. First of all, I'm not sure. Did the commission receive the peer review response from November 4th? I think that was sent earlier or just today.
I believe we included it as attachment to the letter or to the filing. We did get that, Linda. Yeah, we got, yes, we did, Linda. Yeah, I'm sorry, it came, we didn't, it didn't arrive to us until today, basically, and so we didn't, we couldn't get into the agenda packet, but anyway, but I think that's, that's the final, you know, response. Sorry about that, we had it delivered last Thursday.
Dillis and Roy's, not yours, it was Dillis and Roy's. Oh, okay. Oh, their revised letter, is that what you mean? Yeah, yeah. Oh, gotcha, okay.
There was some comment in his response about the underground injection permit that was going to be needed where he discussed the lagoon and the stormwater basin and all that. That had me a little bit confused. I guess I wasn't fully understanding of the plans there. But there is no, you're saying there's no, that any backwash from the lagoon will make it into the stormwater basin or is that not happening?
Um, no, no, I think I would need to go back and refresh my memory on the language, but I know that our response was satisfactory to the reviewer. Okay, okay. Where's the lagoon? Yeah, I can pull up the drawings. There's a lagoon in a basin, and so I guess there's some, the lagoon is used more for...
Was it backwash? Is that what I'm using the right word? Yeah, it's really only when you have to change the media and the filters and prepare that, the media. Okay, I just, I had a hard time understanding that comment, so I just didn't know if that was important or not. Okay. That's associated with the new treatment plant then. Yeah, yeah. Okay.
Yeah, I have under, another comment was a floodplain was going to be restored in accordance of the order of conditions, yet that's not something we've really talked about. Is that what you proposed just now with the trees and shrubs in that area? Is that, is that what you, okay, all right, okay. And if you have other conditions that you're looking for, you know, obviously. Okay.
And also something else brought up in the comments was the resource areas were not delineated but came from the GIS information. So we all know that's not really very accurate at all. And did you know it was... In certain portions of the project, we definitely had wetland flagging done. I think that was only selected areas. I'm trying to remember exactly where. I was just going to ask if anything was field verified. Oh, yeah. Okay, okay. Yeah. Fine.
And the other thing, I don't have any, um, a butter notice, um, confirmation. So, um, if you could, did you, you send everything certified, right? Yes, yes, I do have those. Like the green cards or something, or receipts or something, okay? Yeah, I can drop them by or mail them. Is that it? You can even scan those and email them to me. Okay, all right, perfect. I'll give them physical copies of those, so.
I just had a question on this slide that was up. It was just a little confusing for me in the packet is that we have the Chapter 103 planting plan, right? And that's to address the planting 100 dBH for the 200 dBH you're taking down near the new site for the plant. But some of those plantings are going into the floodplain and in the riverfront area. Yeah. Wetland replication, not replication, wetland trees that are coming down along the pipeline that are being put in this area are kind of, some of them are going into kind of a more of a Chapter 193 area upland. Yeah. So it's just, it was a little confusing. Well, trust me, it was a little confusing for us to try to sort through what we needed to do. So if... You know, if we're off the mark, please let us know. No, I think it was just more confusing to read, but I think you're putting the landscaping is fine. And I think the only, right, there's still a piece of mitigation for the tree removal that's not going to happen on this site and it can't happen by the pipeline. So is that something, Linda, that needs to be discussed as well, like other areas? I think we could just probably put in a condition at some point that says a final landscape plan will be prepared near the end of the project. I mean, nothing's going to be planted anytime soon because it's going to take a while to put this whole project together and then remove all the other equipment. So, I mean, we'll have a little bit of time to mull things over. Yeah. And, you know, there's always going to be project, I mean, project this size, I imagine there's going to be some changes, some, you know, alterations and where things get cited or put or, you know, you know, through the course of the construction. So it's sometimes a little bit too premature to say you're going to put a tree here, you know, when that might not ever happen. So, yeah, we're, I mean, and also the contractor, you know, it's. If they're able to avoid trees that we are being a little bit conservative and showing, you know, their limit of disturbance extends to this area along the pipeline. You know, we try to be conservative so we don't underestimate quantities. You know, obviously it's going to be easier for them if they don't have to remove certain all the trees. Oh, no, that'd be excellent. If we can alter, minimize, that'd be nice. Yeah, so I'm happy with putting that in there that, you know, we can, the final landscape plan will be expected at some point, you know, during or after, you know, most of the construction is completed, so. Yeah, that works. Something you can always work with the commission on, too, so. Commission, anything else? Other comments? I had a couple comments, questions. Go ahead. This lagoon, this just gets used when you're flushing out one of the tanks, is that right? Yeah, the first basin here, but then it has an overflow. Let's see if I can find that. I was looking in the packet and it was unclear. Yeah. There's an infiltration lagoon and a backwash lagoon. Yeah. So unfortunately, Matt, who's the expert on that, wasn't able to join us tonight. I don't know if Mike Hansen knows more details or may not be. Describe the process when you change the filter media, what happens? Well, the filter media that has the PFAS would not be what's being backwashed into that. That would be physically removed. Right, that gets smoked. Okay. So this is basically potable water when they have to flush the systems a little bit. Then it goes into there, and the idea is that it'll infiltrate in those lagoons. Okay. So there's not a lot of water there and the infiltration rate will be okay? Yeah, it's just the backwash once in a while when you're doing the system and the response is in the packet to your consultant. And in your packet here you have some information about what will be done during construction to keep erosion and stuff under control? Yeah, there's standard processes that'll be done, you know, silt fence, hay bales, you know, all the standard means and methods for joint construction will be applied. One other question that's really not conservation, but this treatment facility, this is a standard kind of carbon treatment plant, right? Is that right? Yes. And this is just a garden variety design. There's nothing really special here, I don't think, is there? There's nothing particularly, you know, cutting edge. No, this is pretty widely used. Not like the chemical plant that we have for the temporary thing? Yeah, we evaluated continuing with that type of media, the resin media versus carbon and decided that carbon... This design gives you more flexibility for our future. Yeah, yeah. And, I mean, a lot of people use this design, whereas the other one, not very many people do. Okay. Yes. Yeah, those are my questions. Okay. Commissioner, anything else? So, Linda, you're good on your own then. Yeah, I don't think we have anything more further to discuss, do we? Well, it doesn't sound like it. So we could close it and then just put the conditions that we just talked about, it sounds like. You're good with that, Linda? Yeah. Okay. Commissioner, would we go with that? And if so, would anybody like to make the motion to first close the hearing? Yeah, I'll move. We're closing the hearing under both. Do I hear a second? Second. There goes Lisa. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes. John Storer. Yes. And Sean Ferris, yes. Thank you, folks. Anyone want to take the next motion? Kirsten, what's your timeline? When are you going to be starting to dig this? We are going to be bidding it. I think it's late end of the summer. It's probably the fall. It's kind of going to be more of a starting next winter. You're going to start at the... Does the shaft L end and work your way towards Wayland? That's not really been determined yet. I see. There's going to be two contracts, so they may be going along at the same time. Yeah. Okay. All right. Thank you. When are you going to dig up the road? Jen, that's a question. Or Old Connecticut Pass. I assume the road you mean? Yeah. So that'll be part of the horizontal contract with the transmission main and the pump station. So, yeah, the contractor will have some discretion on how they want to phase that. We're still meeting with the different departments of the town to work through the restrictions that will go into that contract for timing. Okay, let's move on here. Anyone make a second motion? Yes, I move that we issue an order of conditions approving the project under the State Wetlands Protection Act and Chapter 194 with conditions as discussed. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes. John Storer. Yes. Sean Fers, yes. All set. Thank you, folks. Thank you so much. Thank you. Good night. Good evening. Much appreciated. All right. On to B. This is the Massachusetts Central Rail Trail DEP file number 322-1069. Its continued notes of intent filed pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by the Department of Conservation and Recreation for the construction of a trail on an inactive railroad right-of-way beginning in Sudbury and extending into Wayland. The proposed work is ended with 100 feet of a boarding vegetated wetland bank. A land underwater and boring land subject to flooding in a 200-foot riverfront area. The project is shown on the Wayland Assessor's Map 22, 23, 26, and 27. Linda. Looks like we've got another large project team here to present, so. Okay, let's kick us off. I'll start. Hi, everyone again. My name's Amber, Trails and Greenways team at DCR. I'm joined by our consultant team, Dan and Marissa. Also joining tonight is Erica Larner. She's just as an attendee here on the list who has been our lead environmental permitter from MassDOT. Just in case there are any questions, given the nature of the multiple DEP comments, should she need to speak, she's happy to weigh in since she oversaw this for the many years leading up to this fall. I think Linda... I'll defer to you on how you want to address anything related to either the DEP memo or the comments from the commission. Welcome to present any new material that's come in since the last hearing and just update the commission with that and allow them to ask questions, I guess. Okay. Sure. I'll start with the DEP memo, which doesn't have any new content per se. DEP had kind of circled back on the same three comments that we had answered in a subsequent memo. I don't think there's anything new to acknowledge except for maybe the Weplin replication area, Dan. There was a request by DEP to consider not consolidating both the wetland replication areas on the north and south side. Correct. And we defer to the commission on that. Yeah, agreed. Yeah, we had designed it with one and by not having it just hydrologically connected to really everything on one side. But again, defer to the commission on the preference on that.
Wouldn't you think they are connected since the groundwater levels are probably pretty high over there? I would think so. There is just... Considerations with the berm. We believe that the connection, even just through all the resources areas being in the watershed, really, of the Sudbury River and kind of adjacent to the floodplain as well would provide that connection. But again, the majority of the impacts are also on one side versus only 11%, I believe, on the south side. So that was also part of our approach there as well. Well, you know, you did receive the information from Natural Heritage, and you'll see from, I mean, we can't speak of what the species are publicly, supposedly, but you can see that all the habitat is on the other side of the trail, not the, you know, the Washbrook side, right? And, I mean, if we're going to do... I would think some sort of alteration there, which is, you know, creating a wetland replication area. I think it makes sense to have it on the other side where there's where you're not going to get the habitat necessarily, maybe a little, but not not the same. You know, does that make sense? I mean, I guess I'm looking for the least amount of alteration in the priority habitat area. So how big is it? Yeah, just Sovin remembers it is 19 square feet on the south side. And we found that it's Replications are more successful when you're putting it in one area and less overall disturbance. That's 19 square feet you're talking about here? Yeah. Sorry, that's on one side. The other side is 19 square feet on one side. Yeah, that's not very big at all, is it, Cliff? Just whatever is easier to build for that. Yeah. Yeah, I mean, I think we discussed, too, that when Amber and I went out there that the DPW in their... And they're exuberance to clear off the landfill had basically drove over the wetlands a few times. And so if anything needs, you know, reconstruction and rehabilitation, it would be that side where we basically lost the wetlands from that activity. So if anything, it should be bigger, you know, so to compensate for that.
So I think that's the only new thing that would be up to the Commission. Just to address the third question, which has come up a couple times with DEP regarding best BMPs for stormwater, you know, the approach that we are taking to this entire project is to minimize disturbance to the wetland. If we start putting in any kind of infrastructure, we are now excavating out into the wetlands, which is actually kind of antithetical to The Stormwater Handbook. So considering that we're dealing with sheet flow and not pollutants that are on the path, we think our approach is the least impactful to the BVW themselves. So I think we just kind of phrased that question three in a different way. I don't know if there's anything you want to add, Dan. No, not in particular. I think that this is kind of a precedent we've used on some other similar shared-use path projects. And Marissa did review it with some of our other engineering staff. Marissa, I don't know if there was anything that came out of that discussion that's worth chiming in on, but I feel like it was pretty unanimous on this approach. Yeah, nothing really to add. We reviewed it and it's been successfully implemented on other rail trail projects. So we feel it would be successful here as well. And that's why I had brought in Erica because she and I were discussing this last week leading up to this. So I don't know if Erica has anything to add or if the commission wants to hear from her, but she has been permitting these for quite a lot of years. So what is Sudbury going to do? Are they okay with the sheet flow and the gravel swale and the gravel trench or gravel swale, whatever you want to call it, on the one side? Yeah, so we are going to our second commission hearing next Monday. Unfortunately, we couldn't go to the last one because the DEP comments came in too late. They had the same approach on the Bruce Freeman Rail Trail, which they permitted and built recently, as we're doing here. So just to recap, so the plan is to basically pitch it towards the side of the landfill in that direction, the northern side, right, and have a swale, gravel-filled swale on that side to capture the sheet flow? Or is it just mainly a gravel shoulder? It's more like a gravel shoulder, not a swale. And there's slight deviations with which way it pitches across the entire length that accounts for Trying to match as closely as we can to the existing embankment. So as to, again, like retain as much as we can of the existing embankment and have the least disturbance in the areas, the overall approach. Like we've talked before, I mean, we... You know, the Washbrook habitat in that environment is extremely sensitive and special. And so, you know, if there's anything that I would stress is to try to keep as, you know, much of this, the sheet flow and stormwater out of that area. I mean, already, the other side is somewhat. Probably has leachate and other things from the landfill anyway. So I'd much rather have, you know, whatever water goes, it goes in that direction and not in the direction of Washbrook and in the priority habitat over there. So, you know, in all cases where it's possible, I would like to see the pitch go towards, you know, I guess the northern side of the trail. So, yeah. Yep, I understand. And, you know, I'll leave that in the permit that, you know, that's what our priorities are. Okay. Is there anything else? The first question, and then I'll go through the commission questions. The first question with the cut and fill, we kind of ended up exactly where we started with the NOI. I think probably Marissa and Dan can speak more to this, but we gave a lot more information and then we wanted to condense it, which was very similar to what was presented originally. Okay. I haven't quite tracked what's the end goal on that one. And that was DEP's comment, though, right? That was DEP's comment, yeah. Yes. So, yeah, and then addressing the last hearing, there was the request to share the hydraulic study that was done looking at the flow of the Sudbury River and whether our project would impact that in any way. I think the scale and scope of what was requested to address a much larger regional flooding issue just can't be achieved. With the amount of land, the land owners, but we're confident that maintaining the existing bridge structure is not contributing to any additional flood elevation or intensity of flow. I think, Marissa or Dan, if you have anything to add to that. No, I think that covers it perfectly there. That was really what influenced our design and, yeah.
But I'll mirror that. Like I said before, I think this is outside the scope of this project, and what we're building is a rail trail. You know, we're not looking to do a massive reconstruction of the railroad trestle, and that's not your responsibility anyway because it's owned by MBTA. I would think that that would be a narrow wheelhouse. Okay, Commission, anything else? Thoughts, comments, concerns? Okay. Linda, you're good? Yeah, I think so. Somehow I did lose my notes here and what do I do with this? Oh, there's a number of conditions that when you guys are okay with those that Natural Heritage gave you guys added to the project. Okay, yeah. Yeah, so some of those details like the passage and erosion controls and things like that will be updated into our construction set. The time of year, you know, is a big... Consideration. We talked to him about that. Yeah, there's nothing we can do about that anyway, right? So, yeah, it's all about the breeding season. That's right. Disrupting nesting, so. Yeah, yeah. And, well, oh, there is one question I had because you did talk about the observation on deck and that you want to keep it where it is and you want to continue with that original plan. But what I don't think has been finalized is who's doing the maintenance for the rail trail. And who's going to take, who's going to, is, you know, is somebody maintaining this, you know, or keep, I mean, I don't think there's been an agreement with the town. I could be wrong, but that was one thing I had a question on. And the other thing was, is that I was, again, it was brought to my attention because I didn't catch us in the first pass through the review of your plans, was that I still don't understand why. Why is there a section that's still gravel? I mean, why? I mean, we have a paved path all the way from, what is it, Waltham? And then there's this section in Wayland that just turns into gravel? I mean, does that, why wouldn't it be consistent all the way through? Well, Wayland built that. Yeah, Wayland built that with the MassTrails Grant a decade ago. And I don't know why the decision was to do that. But it's still part of the Mass Central Rail Trail, though, right? And so there was no, there's no desire at all to pave that like the rest of the trail? Oh, no, there's a desire. It's part of this. But what's out there today is what Wayland had built. So you're not paving it then? Is that what you're saying? No, we would be paving it. That's what's inclusive of this. But it says on the plan's gravel. Hmm. Is that calling out the existing gravel path? Is that what it's doing? I'm assuming that call-out is coming from the survey, which is showing that there's an existing gravel path there. Okay, but that it's not supposed to remain a gravel path? It's actually going to get paved? Oh, okay. That's why it was confusing because you look at the plans and it says gravel bike path. And so to me that, you know, for your proposed plan, that makes it sound like... It's going to remain a gravel path. The idea is to make it a consistent surface for the entirety of the Mass Central that we have at least with a T. Oh, okay. Well, that solves that. I thought it was kind of odd, like you would just kind of stop it in one place and then just pick it up again in the other, you know, it just seemed kind of not logical. It must have just been the most cost-effective thing to do in the first place. What's that, you mean? The stone dust that was put in, I guess. That was before my time. I have no history with that whatsoever, so. These drawings you're talking about, are they in the packet somewhere? It would have been probably in the last practice from three weeks ago. Everything's online, too, Cliff. We have it on the Conservation Department webpage. There's a lot of stuff online, Linda. Just go to the Town website, Cliff. Go to the Conservation Department. There's a lot of stuff on the Town website, too. There's a little tab on the left that says Projects, okay? So everything that's pretty much current that we're working on and talking about. We dump the entire NOI package in there, and so all the plans and the new sets of plans are all in there. Commission, if we're good on comments, I know Tom, this is him raising his hand here, had a quick comment. Tom, I assume? Yes, and I'm unmuted at this point. Tom's back at Rolling Lane. I should say that I am at this point officially speaking for the River Stewardship Council. I should also explain we actually have a regulatory role on this project. There will be, we believe, a Section 7 permit. Required here for work that affects the wild and scenic river. But the issues I raised last time about the flow restrictions in the river, We are basically asking that the scope of this project be expanded. You might be right that altering the flow characteristics of the causeway is not within the scope, but it is an issue, and we're requesting that the scope be expanded. So we are we have or we are now contacting the commissioner of DCCR and asking she get involved. There there is a letter that. I sent all of the CONCOM members late this afternoon. I don't know if any of you have had a chance to look at it. You'll get an official copy probably tomorrow when it will go to DCR. And so we're asking that you have your engineering organ. I should mention first, I knew nothing about the DCCR. But I have now looked at your website and you have a rather impressive set of climate adaptation goals, which I think are in fact right in line with ours and what we want to do. And you also appear to have a very capable engineering organization. And we are basically asking that your engineering organization be assigned to figure out options for reducing the flow restrictions of this area. Unlike the regulatory processes, your climate goals appear to allow for correction of existing problems, and that's what we're asking for here. So I suggest that the hearing be continued to give them a chance to evaluate the correspondence which we have sent and respond. Thanks, Tom. Where did Linda go? I'm here. Okay, so you heard that, you were there for that? I am here, yes, I'm right here. I was only sure. Any, Commissioner, anybody want to respond to that? Tom's asking us to continue it, to respond to a letter, so I'll speak last, but anybody want to speak to that, respond to that? Sure. I'll weigh in, Sean. I certainly appreciate all that Mr. Siaka is saying, all the work he's done. I found a lot of the information he's presented incredibly interesting. But at the end of the day, as he acknowledges, as we said last time and as Linda said earlier, what we're talking about here is way beyond the scope of this project. From my perspective, we can ask the applicant if they'd like to continue to... Consider this further or address it. We can't make them agree to continue for that reason. In the same way, we can't force them to change the scope of their project. We can ask. So I guess those are sort of my reactions. I'm happy through you, Sean, to pose those questions to the applicant. But from my perspective, those are things that are their decisions, not ours. And as far as I'm concerned. I don't really have any more questions here. So just sort of putting my cards on the table, I'm comfortable with the responses we've received. I think like with respect to the issues we've talked about tonight. I certainly agree with keeping the replication area sort of together on one side. I think that just design makes more sense to me. I think also with respect to sort of the stormwater design, just keeping it simple, minimizing the impacts and alteration to resource areas to me makes sense. So I'm good with this design. I don't really have any more questions for the applicant, but that's my two cents. Thanks, Luke. Anybody else? Well, I can add to that to what Luke said when Amber and I talked about stormwater, too. I mean, the stormwater levels are so high there. There's absolutely nothing we could do in subsurface anyway. So that really limits anything we could put in there other than a surface feature for the most part. So I think we're kind of constrained by site conditions of what we can really do. Regarding the railroad trestle and stuff, I think that's just going to have to be a whole other NOI. I mean, the amount of time it would take for the design and the permitting and everything else, it would take many, many months, even a year to do that. And I don't think there's any reason to hold up this project for something that's far more complex and complicated. So, I mean, as opposed to trying to tack it onto this project. I agree with Linda. Actually, if the data were to come back that says that is a constraint and the data that I've seen does not so indicate, whether there's a rail trail on top of that trestle or whether there's not, replacing the trestle is going to be the same job either way. That should be a separate project, not part of this. Okay. Anybody else? Commission? No, I agree with Luke and Cliff's sentiments. I mean, we can certainly ask the applicant to consider it, but approving this here shouldn't preclude a future project to address the trust. Yeah. Yeah, so agreed. So, Tom, thank you for all your research on that. And so, on your behalf, I think you were asking us to ask. So, I guess, you know, Amber, Marissa, who's, Daniel, who's ever in charge of this? We should really ask you to continue, Tom, but I would agree with, you know, the commission said this almost is a whole different NOI, different issue, and happy to address it at some point down the road, but not, wouldn't be in the scope of this project, would be my personal opinion, but certainly can ask the applicant if they want to continue to talk about it. So this would be a form of asking if y'all would like to talk, continue about it or not. Yeah. Yeah, I mean, I understand the instinct to try to do a lot of things with co-benefits when you're doing any kind of infrastructure project. You know, what's challenging here, among many things, is, you know, the scope has been determined since 2019 when we got this on the MassDOT tip. It does also involve Eversource and all of their towers, and so there's a big stakeholder that's not accounted for beyond just permitting and sheer cost. I don't see a path forward to achieve any meaningful advancement of our knowledge of any efficacy of changing this before the next hearing. I mean, to me, this is like a year-long regional hydrology study. I just don't think anyone at DCR or even a peer review could. Evaluate how to change this to get the benefits that we're talking about in the scope of a couple weeks. So that's my take on that. I don't know, Erica, if you have anything to add regarding what you've seen on this project to date or any kind of permitting. I know you weren't here for the last hearing when we were talking about this, but yeah, if you want to say anything. And then we're a son, Dan. So, sorry. Yes, my apologies. I just got promoted. My name is Erica Larner, Wetlands and Water Resources Coordinator with MassDOT. And I just did want to speak to the funding and the length of the process for that and that frequently projects can be on our tip list for five years at times before they actually get to construction. And that design on this project as it was began multiple years ago. While I think that my unit and DCR would very much like to consider the future of the area as a whole for this particular project and the funding, it has been tied up through federal funds already through the fiscal year, I believe it's 2027, that these projects have already, that the work has already been. The funds have already been allocated, and we wouldn't be able to go back and redesign and add this to the construction and have the funding to pay for it at this time. Though I'm sure that people would be very interested in hearing about the potential for a future project. It would take several years of redesign and attempting to find additional funding to go back and look at it, and I think it might kill the project, sadly. Good. Thanks, everyone. Okay, so I think we have our answer, hopefully, Tom, that clarifies that for you. So if there are no other commissioning questions or thoughts, sounds like Linda and we're all ready to close this. Is that right, Linda? You good? Good. Sorry, I'm multitasking. Love it. Would someone like that to close the hearing under both? I move that we close the public hearing under both Chapter 194 and the State Act. Thank you, Luke. Do we hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Lisa, oh, you're muted. Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. And Sean Ferris, yes. Next motion, please. I move that we issue an order of conditions approving this project under both Chapter 194 and the State Act with conditions as discussed. Thank you, Luke. Do I hear a second? I hear a second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Ferser, yes. All set. Thank you, folks. Appreciate it. All right. Thank you. We'll be in touch. Thank you. That's good. Okay. On to 2C. This is 68 Lakeshore Drive. DEP file number 322-1057. It's a continued notice of intent filed pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by Jeremy Jenkins for the after-the-fact work. Performed at 68 Lakeshore Drive in Wayland, Mass., including installation of a floating dock, gangway, ramp, retaining wall, patio, and repairs to the covered porch steps. Property is shown on Assessor's Map 42D, Castle 56, and is located within a 100-foot buffer, sorry, of a boarding vegetated wetland bank and land underwater. Linda. I don't believe we have anybody here. Emily, did you hear from Jilson of whether or not they were continuing this? I did not, no. So what they did, what Jilson Company did was submit like three, was it three RDAs? I lost count, I think. I think it was just one RDA, but for three things. Oh, okay, that's what it is. Instead of doing an NOI, for some reason, he decided he would just do a request for determination for a portion of the project that came in too late to make it onto this agenda. So I think we should just continue this one, and then we're going to probably address the project under a meeting instead of a hearing at the next meeting, okay? And then, Linda, remind me, what's the next meeting date? It would be December 2nd. Holy cow, December, get out of town. Okay. I move that we continue this hearing under Chapter 194 in the Act to December 2nd, 2026, after 6.30 p.m. Thank you, Luke. Do we have a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes. John Storer? Yes. And Sean Fair is a yes. Thank you, folks. On 2D, no DEP number here, Linda? Oh, no, we got one today. 322-1071. 1071. Okay, yeah, so this is 61 Lincoln Road, Wayland Mass, DEP file number 322-1071. It's a continued notice of intent filed pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by William Haney for the installation of the Beaver Pond Leaver Pipe System. The proposed work is within 100 feet of a boarding vegetated wetland in 200 feet of a riverfront area. The product is shown on Wayland's Accessive Map 08, Parcel 02. Linda. Is Ryan presenting this for Goddard Consulting? I am. Good evening. For the record, Ryan Rosin with Goddard Consulting. Yes, since the last time we had to continue because we didn't have a DEP file number, but as you just heard, one was issued earlier today. Do you want me to give a recap? Nothing has changed. There's no new information. There were no technical comments from DEP. On the NOI or anything. There was one question, I think, from the initial hearing that Linda had that I did get some additional information from Beaver Solutions about, and that was about the water level. If we lowered the water level, would it affect the Beaver Lodge? And so I asked Beaver Solutions that, and they said at this site, lowering the water level, you know, six inches would not have an effect on the Beaver Lodge at this location. Okay. So is there, I don't know if there's anything else that the Commission has questions about, or if you want me to give a recap of anything from the previous meeting? I guess we'll start with Lynn. Lynn, is there anything else other than the DEP number they were waiting for? Or are you good with knowing that answer? No, I mean, I think we heard, I mean, if you guys remember, we heard the discussion about... Putting in a beaver pond level device. And we did something very similar just across the street in Hazelbrook maybe a couple of years ago. SVT had a permit for that also. So it's, you know, it's just an issue we have in town. We have a lot of beavers, right? Yes, we do. Okay. Commission ends. Anything else? Living seems good with it. We good? All right, Ryan, I'll make it easy for you. And we want to make a motion to close the hearing, please. We want to move to close the public hearing under both Chapter 194 and the State Act. Thank you. Luke, do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Lisa, you're muted. Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Fischer, yes. Thank you. Next motion, please. I move that we issue an order of conditions approving the project under Chapter 194 and the State Act with conditions as discussed. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa, sorry, Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Fers, yes. All set. All right. Thank you guys very much. Appreciate it. Have a good evening. Take care. All right. On to 2E, 17 Hazelbrook Lane. Do you have a DP number here, Linda? I don't think so. Do we? Yes. 1070. 1070. 1070. 1070. So 322-1070. Notice of intent to file pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by Connor and Stephanie Davis for the construction of two additions, landscaping, and replacement of the septic system at 17 Hazelberg Lane, Wayland, Mass. The property is shown on Assessor's Map 11, Parcel 79. It is located within a 200-foot riverfront area in a 100-foot buffer zone of a boarding vegetative wetland. Linda. Oh, who's here for that? Is that Brian Nelson? Yep, looks sweet. Hey, Brian. Hi, how are you? Doing well, thanks. If I can share my screen? Sure. All right. Well, that's loading. My name for the record is Brian Nelson from Metro West Engineering. Hopefully you can all see that. And so we are here for a notice of intent for the property at 17 Hazel Brook Lane. Shown on this presentation board, the site is located on the southerly side of Hazelbrook Lane, which is shown at the top of the screen, kind of running from west to east. We're about a thousand or so feet west of the intersection of Gleason Lane and Hazelbrook. And it's about a 5.1 acre site. It's kind of long and narrow. Existing house is located pretty close to the street. There's a small shed also in close proximity to the street. Site extends back several hundred feet. There was a notice of intent previously for work done at the rear of the house for a shed and a barn that was constructed back there. I'm going to zoom in just a little bit. Just to kind of give you a little bit closer view of what we're here to talk about tonight. Again, the existing house kind of runs basically southwest and northeast. It's long and narrow, located about 64 feet or so off the sideline of Hazelbrook Lane. There's a small shed, as I mentioned, right here. Hazelbrook, which is a perennial stream, cuts through the property, basically comes across Hazelbrook Lane, flows in a southwesterly direction on that bank for Hazelbrook. Is shown in this blue line right here. And it continues along and off property to the southwest. We have a bordering vegetated wetland to that, which I'll zoom in one more just to get a little closer. Bordering vegetated wetland, which comes off of the bank of Hazelbrook. Kind of protrudes out into this low area between the house and the septic system and then merges back in with the bank over here. 30 foot no alteration zone shown in red here and then also when you get to the other side over in this area here. Area around the house, the light green shows lawn area, the darker green shows planted or wooded area. So we've got some lawn area immediately adjacent to the house. There's a footbridge and a gravel road that kind of lead from the house area. And elevations are high up near the house. Obviously, this area with the wetland in it is lower by about 8 to 10 feet. And you come back up a rise to the south-southwest, and the septic system is located, the soil absorption system is located in this high area right along the westerly boundary. We are here to talk about two small additions. I'm going to share, just switch to full size. I'm going to go to a proposed board. Again, we're oriented the same way here. Hazelbrook Road is at the top, running from west to east, north going straight up. Existing house, again, is shown in brown. What we're looking at are two small additions, which are shown in blue. Basically, There's a roughly 120 square foot addition that will be situated on top of the existing deck. The existing deck will be removed and replaced, but the existing deck will replace part of that footprint where the proposed addition will. There's another addition which is about 150 or so square feet which is located on the rear of the house as well. The existing deck, the outline is shown here. That will be expanded a little bit. The new deck footprint is shown in magenta. So basically a little bit of an increase in deck size, a set of stairs in the back. And what we're proposing to do, basically, we have roughly between new addition surface and Kind of where we're overlapping with existing impervious area. We've got an increase of about 138 square feet of impervious area on the property. So it's a relatively minor increase. What we're doing is mitigating that with a small Coltec infiltration system located in the front of the house. And that's shown in blue right here. Kind of the larger part of this project is... Replacement of the septic system. And right now in this configuration will remain in the proposed condition. There are septic tank and pump chamber located behind the house in this area here. There's a sewer force main that runs along the gravel road up to the existing leaching field. And we've got the existing lines are shown in blue. What we're proposing to do is Just due to the increase in room count with the additions, construct a new Title V compliance system, which is shown in magenta. That's this footprint right here. And really we're looking to construct that in the same place we had soil testing witnessed by the health department and looking to basically use the same area. Soils are good. We're not removing any trees to do this. And we have file plans with the health department. The septic system is located at closest, about 80 feet away from the wetland boundary. And one thing I'll just zoom out a little bit just to show you, the majority of this property is located within the riverfront, the inner riparian zone. Is the yellow line here. So the southerly addition and the deck modifications are entirely within the inner riparian. The rear addition is basically outside the inner riparian, but still within the riverfront area. And the septic system, again, the majority of it is located outside or within, outside the 100 foot, but within the 100 to 200 foot zone. I'm not sure if Dave Burke is here to talk about resource areas. If he is, I'll let him jump in. If not, I'd be happy to answer any questions. Thanks, Brian. I don't see Dave. Well, Brian, this is our third project here, probably in the last few years. So I think at least I'm pretty familiar with the board here. What's that? We're very familiar.
Okay, so I guess Linda, you want to start with you? Questions? Sure. So I am confused about how much alteration is the inner riparian. You have a couple of tables. You have one on page three of your narrative that states you're adding 231 impervious into the inner riparian. But then you're subtracting 93 in the outer riparian? That's correct. Yeah. But you said you were putting an addition in the outer riparian. So there's some overlap between where the additions are going in present impervious surfaces. So we have a reduction in the outer or the 100 to 200 foot zone of about 93 square feet. We have an increase. But where's that at? If you're looking at the outer riparian, where is the reduction? It's in the rear with some of the landscaping that's occurring and some of the modifications that are happening. That's in the rear of the house. And the deck for the biggest increase in impervious area within the inner is the new addition is replacing or going on top of an area that is presently a deck. And did you include the retaining wall as part of that impervious also, the new retaining wall? Yes. You added that in there too? Yes. Because now if you go to page three of the NOY, you have different values in there. So you're saying that the total square feet is 131 and the inner repairing is 97 and the outer repairing is 34. I will take a look at them, I believe. They should be the same. I think they're presented a little bit differently because we have a breakdown of wooded in the landscape. So I don't think we've got the totals there, but I think we've got the same numbers, at least from what I can see, planting at these quickly. I think it's the net amount between the gravel and the impervious. It's the total amount, the total of those two. Yeah, really, the big one is the degraded area for riverfront. So it's the impervious plus the gravel, hard paths, you know, everything where the topsoil has been removed. That delta is even narrower in the riverfront. It's almost awash when you look at new impervious versus riverfront. It comes down to about a seven square foot decrease. But so then your total, if you add the gravel and impervious for proposed, is almost over 20,000 square feet, right? So we're well above the 10% alteration in the riverfront, and that requires mitigation. And I'm not sure I would agree with the Coltec as being a mitigation for that. I mean, what you're doing is you're just infiltrating roof water, which is pretty clean anyway. You know, I know Connor has done quite a bit of work in, you know, as far as plantings and doing that sort of work. But the one thing that was always, that was in the previous permit, that was a 15-foot no disturb along the wetlands. I mean, I think I'd like to see more work done in that 15-foot no disturb, which is currently lawn. And I would much rather see that as mitigation versus putting in a, digging up, you know, the lawn and putting in a call tech chamber, infiltration chambers, except for this small amount of impervious that you're adding. So the other thing too, I should point out that the numbers shown here on the table are basically reflective of the riverfront area that comes off the easterly bank. of Hazelbrook, which is shown on our plan. It doesn't include the total riverfront area on site, which totals about 177,460 square feet. So our alterations are well under the 10% threshold. We did think that the... The infiltration system would be a good thing to do just to catch some of the downspouts which have pipes running to daylight right now. You know, in terms of restoration, I think Connor and I can regroup and look at that. But this site is impeccably maintained, certainly has a pretty robust and healthy and well-maintained plant community on it. So I'll just throw those things out there, but we can certainly take a look at that. Sorry, I was going to say, can you put the map back up and just show? Sure. So the riverfront area you noted in the narrative is not the total amount of riverfront area on the property. Yeah. And I realized that before I hopped online tonight, so I apologize for that, and we can correct that in our filing. Well, I'd like to say that in the correct, because, you know, that throws the whole thing off of, you know, the regulations. If, you know, you're altering more than 10%, then, you know, there's always mitigation required for that. And, you know, now you're saying that it's not, it's still over 10%, but not as much, right? It's below 10%. What we've calculated is, and I'll zoom in just a little bit, is this blue line is the bank. So we calculated everything on the easterly side or to the right and plan on all this. But there is another bank on the other side of Hazelbrook, the westerly side. And all this tannish colored area would be included in that as well, which drives that. That total riverfront area up from 141,700 roughly up to about 177. And when we take the total degraded area in the existing and the proposed condition, we're well under the 10% threshold. Yeah, but you have land use within total riverfront area on page three, and it says there's 6,106 square feet of impervious and another 14,403 feet of ground area. So that combined is 20,000. So you still are over, you know, the 10%, right? I will take a look and see. Those are the totals. I don't want to argue this point, but I just want to make sure the numbers are accurate and the permit. And again, you know, the two, both, both permits that we issued before stated that we'd like to see a 15 foot no disturb, you know, that a vegetated 15 foot no disturb area that's, you know, that's not long. So, I mean, again, my preference would be to see that that's a standard condition we have in every single permit that we issue. And, you know, that, oh, the other thing is that you used an old fee structure that was updated a few years ago. So update your files with that. Okay. I don't know how much has changed, but there's a brand new fee structure for Chapter 194. What else is there? You said in your Notice of Intent that you had an alternative analysis, and did I miss that? No, there shouldn't be any alternatives analysis for this one. You marked it as yes, so we're paid to my own now.
Yeah, on page three again. As an alternative to anything else that's been done, it says yes. So it was a lot proposing. Okay, butter notices. I need some receipt of butter notices also. Yeah, we can send those over. We have receipts. Let's see. Did you guys pay the legal ad? I don't have a receipt for that yet. Or I haven't heard back from Wicked Local, I guess, on that. The other thing. I don't think we have either on that one. So if we need to pay it, we're happy to. I just, I haven't seen anything yet. Typically, I think they would just send it to Connor directly. Yeah. This is Connor. We can jump in. Yeah. Thanks, Emily. We submitted a receipt for that. Okay. All right. Thank you. This also, I am confused because it says property owner's signature on Chapter 194 is not signed. Although the applicant's name is Connor Davis, he signed it. So typically we always need property owner signatures on our, and I'm not sure who signed it, the front page, the first page of the chapter 194. I don't recognize that signature. So anyway. Because we have property owner and then we have applicants on the NOI, which is also a little bit different from what the other ones were. Anyway, I just want to, and then who is Christopher Catan? Chris is one of my co-workers at Metro West who did the voter notifications. Okay, because he didn't sign the affidavit either on that page. I had no idea who it was, so I wasn't sure if that was, he had just sent out the letter notices, right? Mm-hmm. Okay. So those are, I'm sort of nitpicking here, but I just want to make sure everything's complete and we're not missing anything. Okay. Questions, thoughts, comments, concerns? I think this is probably a nitpick as well, but I know there's a small deck expansion, which is within the 100 feet riparian zone closer to Hazelbrook than the existing conditions. I know it's small, but I wanted to get Linda's thoughts on that as well. Well, typically decks over lawn can be an exempt activity. I just don't know how, is it on top of lawn or is it, are you digging up the lawn to do this? I mean, I'm not sure what the height of that deck is. Can you tell me that, Brian? The deck will be several feet above grade. So there will be loam and plantings underneath it. Yeah, yeah. So yeah, usually that, you know, deck over lawn is not, is it? It is acceptable in the riverfront area. But you're right, it does say in the Riverfront Act that it should not be closer than existing conditions. Anything else? Commission? I agree with Linda's comment that, you know, to me, the cult text seems like it might be overkill for what we're talking about here and sort of an unnecessary alteration. So I guess... I don't want to hold this thing up over sort of minor nitpicky stuff. On the other hand, it sounds like there's a decent amount of information we need to get cleared up here. So for continuing, I guess my comment is I would encourage the applicant to maybe just reconsider and talk to Linda about other forms of mitigation. That, to me, just seems like an unnecessary alteration. Happy to remove it if the commission is, that's their sentiment. So there's no issue on our end to take it out. Never been asked to do that before, so this is the first. I think certainly for a larger scale project, I could see it. I think it's just given the, it almost feels like we're altering more with that than we are with the rest of the project. Yeah, because there is a big basin in the front, and that was permitted when they did the driveway, you know, put the pavers in the driveway. And so, you know, there's more dirtier waters going into that basin up front. And I mean, if there's some way of, you know, I'd much rather see reuse of the, you know, the down in the rainwater, you know, versus just dumping in the ground and, you know, being to do some, you know, low impact development kind of stuff, which is, you know, putting a green well or something I would find much more beneficial here. But again, I think we do need to meet that condition that was in previous permits, which is, you know, putting a vegetated buffer in against it. Certainly we'll take a hard look at that one. Okay, so that's where I would, I think, put the focus, you know, for this. Okay, can you mention anything else? So either way, we have a few things to clip anyway, so it's going to be continued to what, the 2nd, I'm assuming, Linda? Yes, please. Did I go with you, Brian? To December 2nd? Yep. That's correct, that's fine with us. Okay. I move to- Commission, can I get a motion then to continue under both to the 2nd of December sometime after 6.30? So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. And Sean Fares, yes. All set. Appreciate it. Thanks, Brian. Talk soon. Okay. Moving right along. We're on to stormwater and land disturbance. This is 3A. This is 80 Oxbow Road, SWLD-168. Linda. Is Ian here? I thought I saw Ian in our participant. Hi. Let me pull up the plan. Okay, so we were here about a month ago, I think, and this is a stormwater application. We are taking an existing single-family house, tearing it down, and building a new single-family house. And I think where the first hearing went was, you know, we needed to get it peer reviewed. So that peer review has come in. I'm working on the revisions now. It's a lot of details, I would say, small details, just to make sure we're conforming with everything in your bylaw. But there's a couple things in there that he asked me to get the commission's opinion on, and I just wanted to take the opportunity now to do that so that when I refile with the peer reviewer, I've kind of captured everything. And the first of those is we show a straw waddle on the plan. He wanted me to make sure that that was sufficient for perimeter erosion control. And just a reminder, we're not doing a ton of fill here. It's generally staying at grade. There's some fill in the back here. And it's very highly infiltrative soils. They're very porous. I think we dug down to like nine or 10 feet and didn't see any signs of the water table. So I'm not expecting high levels of erosion. So I just wanted to see what your thoughts were as far as wattles for the perimeter. Do you want to start with that one? Well, I mean, I'm just looking at the grade changes. It looks like you have, it's lower in the back than it is in the front. Is that going to pretty much stay that way then? Yeah, yeah, it generally runs from front to back, so you'll get a little bit in the front that's going to go into a low point here, but otherwise everything's going to run generally front to back. Okay. I mean, as, you know, I don't have a problem with straw waddles, unless, and of course we're going to have it in the conditions of the permit that if you're putting in stockpiles, those will happen to have separate erosion control around them. You know, and especially left overnight. We're happy to do that. So you guys fixated on the circular drive? Yeah, you know, part of that is because it's similar to what's there now. So I'm going to the existing plan. Yeah. It's a little more triangular than circular right now, but they do kind of have that feature and they want to retain that. So that's why we've done it that way. And those are two, you have two legitimate curb cuts then, you know, from DPW. One of them wasn't just cut on your own and added without a permit. Not that I know of. You might want to ask because typically DPW doesn't give out curb cut, two curb cuts per property. Agreed. They bought this property, I want to say in 2022, and it was like that when they bought it. So I don't know how far back this was put in. Yeah, it's worth a phone call, okay, because you don't have to change your entire plan. The reason I don't like it is because it just requires so much more stormwater management when you have that much extra impervious for that much asphalt in front of your house. Yeah, I know what you mean. Yeah, I can look into that a little bit. And if the town ever puts in a stormwater utility, then, you know, you're going to get taxed on that too. You're going to be like Westford. Westford has one of those, yeah. Yeah, that might not be too far in the future. So, you know, that's always a consideration, you know. I appreciate that. Heads up. The next one that the peer viewer brought up, your regulations require one-foot contours. And I've shown two foot, because there is a decent amount of grade change on this property. I think one foot would muddy the plan up, and I don't really think it would clarify where the flow is going. I think it's pretty obvious from the two footers where the water is going. So he kind of gave me an option. He said... You can either add the one-footers or ask for a waiver from the Commission, and I guess I'm here to ask if that's something that the Commission would entertain, and I don't necessarily need to vote on it now. I don't know if I would need to give you it in writing, but I just want to see if you would be open to giving that waiver. What do you think, Cliff? I think it's fine, too. How about John? I think it's fine. Oh, okay. I think one-footers are good when you have a flat property, like a parking lot, you know, there's very small grade changes, but something like this, I think it just overcomplicates it. And then the last one is the vertical datum. So basically all the numbers, all the elevations on the plan, we've based those off of the USGS datum. 1929, which was kind of the common standard datum in the industry for a long time. And now the common datum that's being now shifted over is the North American datum of 88. And there's a difference of about, I think, a foot. And in your stormwater regulations, you require the The 88 datum, the new datum. And so our survey and all the design is based off of the old datum. And so my question is, is that a waiver that the commission would be comfortable giving?
This is Barbara's dear to her heart topic. I would say no. I would say no, too, because we want to be consistent. Every single one of our plans is NV88, and when you throw something else in there, at some point, we try to put this all together on a GIS or something, we're going to have a different datum. No, I think consistency is important here. Okay. Yeah, we can change that. It's one sort of... Command in the computer to update all the contours, and then I just have to go kind of manually change the inverts and stuff like that, but thankfully there's not too many of them. Okay, okay. Yeah, I can do that. Yeah, and that's really it. I expect to be sending in revised plans sometime, hopefully in the next week or so. Okay, we'll need it a week before our next meeting. Okay, and when is that? December 2nd. Okay. Yeah, I think we'll have it in before then. Okay. Commission, anything else? We'll let them go and see them in a second, but anything else before we let them go? All right. Sounds good. We'll see you here in a few weeks. Thank you. Thanks. The next one is 3B, 17 Gleason Lane, SWLD-174, Linda. We were contacted by the applicant's attorney today. I guess she was just recently hired as of like yesterday or today, maybe yesterday, and she just needed a little bit more time to go review the material and be prepared for a meeting and asked if we could continue it to the 2nd of December. Okay, no move. Well, we don't even need a motion. We can just throw it in our agenda then. Okay. Linda, 4A, vote to ratify 18 Lakeshore Drive Enforcement Order. Let's get into this. Oh, God. This has just been a... Not it. You can explain this one. No, really do I have to? It started last year. I don't know if I can throw up a picture or not. I might have one, but... It's a bit of a neighbor feud and, you know, that involves a fence, you know, along somebody's property line. It involves, you know, a boat and a dock and and they, you know, they want us to take action on something. And yes, the fence was never put in with a permit. It's most it's most of it's not even that section of fence is even on their property, according to the deed. But then we've also got a pontoon boat just parked along the public access. We have an unlicensed dock that's back there also. And, you know, neither of the neighbors really want to budge on this one to resolve it. I've contacted Environmental Police. They just took a pass on it and told me to call DEP, the enforcement person at the Wetlands Program. Called up Pamela Merrill or sent her all the materials. She called me up and said she took a hard pass on it also. And then sent me to DCR, who does the Lakes of Plants Program. They're the ones who, since Dudley Pond is a great pond, it's actually their, technically their property, which you would think that they would want to have some interest in. And all I got back from them is, can you prove to us that that's our property? No, I mean, this is Deadly Pond. This is, you know, there's, there's, it's just, I don't know, you know. Some high level, high level buck passing right there. What am I supposed to get the surveyor out there and say, this is probably the mean annual, mean high watermark, which is what defines the Great Pond, right? But then, like I said, the deed says his property goes 62 feet off a lake shore, which leaves this big sort of never never land that I guess nobody owns. I mean, I really don't know. You know, I mean, I was trying to, you know, I think it's the state's problem. If it's their property, it's their problem, you know, but they have absolutely zero interest in taking any role in this at all. So now we're kind of back to square one. And the suggestion was that I should send the person who. Put in the fence an enforcement order. And that's what I did. Because that's what I was asked to do. Here's my quick version of that. Linda was asked to send this enforcement order for, yes, a fence that was on our property. It's not what we didn't allow. What you don't, what I just understood, now I understand it to say, is that fence is because right on the other side of that fence, on the public right-of-way, there's a pontoon boat like parked right there. Like there's no public right-of-way, it's right there. Then there's the fence. On the other side of the fence, on the water, that same gentleman who owns his pontoon boat put a floating dock anchored there. So this guy's fence, not that two wrongs don't make it right, but this is insanity. I don't know how we send an enforcement order to the guy who built the fence because he wants to fence off what's supposed to be a public right-of-way, but now this guy's guys across the street, mind you, is the gentleman whose boat this is. So this is a clearly what happens when, as Luke said, everybody kicks the can. No one's been enforcing this. So it falls to us, and I'm happy to enforce things, but we have to enforce it fairly. So if we're going to tell this guy to take his fence down, we also have to tell this guy to move his boat and get rid of the dock, because those aren't also allowed as well, which I'm happy to do, but we've got to play fair. We can't just pick on the guy with the fence. And so I told Linda, let's rethink this. I get the knee-jerk reaction from the town is, hey, pull it down, but we need to dig a little bit further and find out why this fence is even going up. So yeah, so there's my coloring of velvet lines, if that makes sense. So, I guess my... I'm not sure any of this makes sense, Sean, and that's no fault of yours or Linda's description of the situation. It's actually hysterical. I mean, you can't, this is like a NBC cart, you know, sitcom. And so... There must be some history on that. Where is the fence? You know Robin Hood Lane, a road I think it's called, which dead ends into the pond. So this is, if you look at GIS, the house on the road. I'm looking at the GIS. It's number 18, and the house across the street, it's number 13, and the public access is something that used to be called Robin Hood Road, which, you know, was one of the, from the 1914 plan. I mean, I think there's a little bit of who squeaks the loudest gets the attention here, too, and, and, you know, Robin Hood Road. The squeaking got our attention on everybody, so everybody move your stuff. You're all, you're both wrong. What are we doing? Like, why are we discussing this? Yeah, that's where, so that's, Sean, that's what I'm sort of wrestling with, I guess, is, you know, I'm catching up here. To me, it sounds as, so just to be clear, who's asked, who requested that this enforcement order be issued? Is it the owner of the property who's got the boat parked there, or is this somebody else entirely? Yeah, yeah, and that to me is like, and I use the analogy, it's almost like someone who's like robbing the house, robbing someone's house, calls the police because the guy next door is making too much noise with a house party. So that's where I was going. I'm just trying to make sure I've got it right. To my mind, those violations might be worse than the fence. Yeah. It sounds like they probably are. So I'm with you, Sean, if I'm hearing you correctly. I'm not really comfortable ratifying or endorsing any enforcement order necessarily right now. And I think if and when we do, we should be issuing enforcement orders to both of these individuals, it sounds like. Can I back up? There's a guy at number 13 who owns the house, Gary Langley, who has a boat on Dudley Pond and a dock. He says he owns a dock on Dudley Pond. Did I send you guys that? I thought I sent that whole packet. Did I send that? It may have been to me. Was it? I was going to think, is there a way to pull up that picture? Yeah, I got pictures. Yeah, Barbara, that's it right there. Okay, I didn't see that. I'm sorry. That's why I can't. In vision of what it looks like because I didn't get to the picture. So the dock is off to the left of the boat on the picture. You can see like a blue dock back there. Yeah, it's complicated. And that's why I wanted the state's input on this because shouldn't they be licensed? Shouldn't that dock be licensed under Chapter 91? And I can't even get an answer from the state from that, from their waterways program. Who owns the dock? The guy at 13. Guy at 13. He has no right of way to the dock. Yeah. Yep. That's kind of my point. Sean, you better get out there. Right? You're the biggest guy we got. Come on. Uh-oh. We're in trouble then. Yeah. But I mean, I tried to resolve this, and one of the suggestions I had was you move your dock to the other side of the boat. And he'll move his fence. You know, wouldn't that be, you know, both of them doing the right thing? And that didn't go over well. Let me just say that. And so he, you know, one of the neighbors ran straight to the town manager's office to have him resolve it. And so now it's back to conservation again. So it's resolved. If you call both of these people in and say, look, you can do this. Or we're going to ask you to take the fence down and take the dock out and take the boat out. Now, what do you want to do? I nominate you to do that. Okay, Cliff, I'll try for months to do this. Okay. Yeah, so Cliff, I'm with you. I think also behind the scenes, that's been basically approached. And so I think the easiest thing to do is reset this whole thing as if we just found out about this whole thing, send out two new enforcement orders. One to the fence. Hey, before we ratify it, come talk to us about it. And one to this Gary guy with the dock and the boat. Hey, before we ratify it, come talk to us about it. And then from there, they talk to us. We can work something out, which again is kind of a hard time. It's kind of like squatters rights kind of a deal. King Solomon will help us, right? We'll just have him drop down for the meeting. But that's the right thing to do. Have them both show up at the meeting. Have them talk about it. Let's have a rational adult approach here. Right. So, Linda, how's that for, that way you don't have to get involved and, like, have to worry about, like, interacting. You can just send, you know, enforcement, whatever, and CC me on it so that, you know. Well, I mean, we did get an email from Tom Faye. He's, he would like to set up a meeting. Tom and I are having, yeah, a call with Chris. Go ahead. With you and I. With the fence guy, yeah. Because he hasn't really gotten his chance to say his side of the thing. We've only heard the other side, so. Right. I guess my point is that's for Chris and we can talk about Chris's fence or whatever. But at this point, Gary, the doc and the boat guy across the way, needs an enforcement order. So he understands, oh, you're also in violation. You need to come talk to us. And so I guess between now and time that we have this chat with Chris and bring him in, can we write up an enforcement order, send it to Gary and get his attention to say, hey, now we need to have you come talk to us as well. Well, okay, well, here's where I need Luke input for. It's actually a chapter, it's a Chapter 91 license violation. It's not really ours, you know. I mean, theoretically, it's probably both. I mean, certainly they'd need a Chapter 91 license. I would expect they'd need some sort of a permit from us, or at least a determination. Don't we typically permit docs? Yeah, but that's been there forever. I don't know if there was a permit originally for that doc or if it's been there since grandfather lived there. I don't know. Well, we're about to find out because you have to prove it. And so we'll find out real quick. Yeah, I mean, right. Linda, if we don't have any record of it, then to me that suggests that there was never any permit. Let's, you know, we can be proven wrong, but, you know, it's complicated, so. Okay, so I guess, so I guess, are we all saying, I think we're saying, and please, I don't want to summarize, if not correct, we're going to hold off on ratifying this enforcement order to the fence guy, Chris, until he comes and talks to us. Lindsay will reach out and say, hey. Come talk to the Commission before we ratify this. At the same time, between now and the second, Linda's going to send an enforcement order to Gary, the boat and the dock guy, saying, hey, you can't be doing this, or if you can, please show us how this is possible. Either way, we'll have both of this. Depending upon, Linda, if you think they're... Contentious. They can have their own separate like, you know, little hearings or whatever, but let's just get this thing going. Should we let both of them know that we've issued the same thing to the other guy? I don't think that's terribly appropriate, really. I think. Okay. I mean, they'll find out when they're at the meeting in a second. That's our agenda. So they'll find out in their own accord. Yeah. Yeah, I'm a little fearful of how this is going to go over. Say, Ellen, you're what? Sorry? I'm a little fearful how this is going to, this is not going to go over well. Fearful? The enforcement order. I mean, I think that's just, we're just fueling the fire here, you know, for this situation. And I was hoping that we could just... You know, do something, you know, you know, have somebody agree that they're both going to do something, which is like I said, remove the fence, move the dock, you know, and then and that and just avoid this whole, you know, enforcement order and. Again, I haven't had the best experience with this project or this situation. Linda, that's all the more reason, I think, just to do it this way. And let us sort of take that off of your plate. I think it's appropriate for us to do it. Hey, Luke, I'm the one here in the office who's going to, you know. All right, I get it, but I'm just saying. I don't know what other way there is to go here. Yeah, I don't either. I don't either. And just make sure you see when it sends out, see, see me on it. Openly see, see me on the email. So if there's any chatter between now and our next meeting, I'm happy to chat. Okay. So, okay. All right. So we all good with that? Do we want to take it? Here, I'll tell you what. Let's take a quick vote. So this is 4A, a vote to ratify 18 Lakeshore Drive Enforcement Order. I'm assuming we're making the motion it'll be a nay vote. For those who don't want to enforce it and hold it off, it'd be a nay vote, right? And for those who would want it, it'd be a yes vote. Is that how we want to do this? But it's a nay vote because... We want to hold off and talk to, if you want to hold off and talk to Chris, we'll be basically, you know, the enforcement order has been sent. So Chris has this in his hands. We haven't ratified, so yeah, we agree this is a legit enforcement order. So if we don't want to do that, hold off, we would vote nay, no, ratifying it tonight and hold off till we talk to Chris. So sorry, Sean. Please, Luke. Lawyer alert. Yes. If we want to ratify it, we have to do it tonight. Okay. I can tell you I've won cases nullifying enforcement orders because the commission did not ratify it at their next regularly scheduled meeting. That's what the regs require. So we have to do it tonight unless we could vote not to and Linda could reissue one, but that sort of seems like it's un... Necessary paperwork. But if what we're saying is we'd like to have a conversation before we ratify, I think we do need to go through that procedural step of having it reissued basically before the next meeting. Right. Thank you for that. Please always lawyer me. My opinion is giving more kind of context to this is I also feel personally that this enforcement order was Linda was told to send out this enforcement order not because it was the right, in my opinion, the right thing to do because of the, it was because one person was being squeakier than the next and therefore it was almost an appeasement based on my understanding of how this went out, right? The fact that Chris has an enforcement order but the boat and dock gentleman doesn't just because he's let. Right. And so I'd rather say, no, I don't agree with this enforcement order at this time. Let's talk to Chris. Let's talk to the guy across the street. And if at that point we can't get what we want, then we have to unfortunately have a new enforcement order that we've at least attempted and given best effort on both ends. So that would be my personal thought why we wouldn't do it tonight. Yeah, and like, I think kind of in that vein, Sean and Cliff, you might have just been alluding to this. I mean, typically, right, you know, my preference would be before we jump to enforcement order, if we can send kind of a notice violation type letter, hey, and ask them to come in. So maybe that's the move is we don't ratify this tonight. We send out those letters in advance of our next meeting. We ask them to come in. And basically have the conversation. I mean, they won't have an enforcement order hanging over their head at the moment, but the message will be, this is where we're heading if we can't resolve this in a reasonable fashion. Chris got a cease and desist last year for the fence, and then it was followed up for a violation letter. So this is step three already in the process, the enforcement order. Which again, to a good point, we need to always go back to if appropriate and when appropriate, but I would expect that same type of action to be taking on hypothetically this doc and boat if the same violation is occurred, right? Because one person's louder and more aggressive doesn't mean they're right. And so I just want to make sure we're being very equitable in how we deliver our opinions. So, yeah, I'm with you, Luke. Let's not do an enforcement order. Let's send a letter. Hey, we don't want to send an enforcement order. Please come talk to us. Let's not get there. And if we have to, we have to. And yeah, I'm with that. I like that. But again, this has already gotten the enforcement order. OK, so I can I can. I'm happy to email and say we didn't ratify it. We do. The commission disagrees with it at this time. We come talk to you first. And if we have to go out there, we will. So I'm happy to say that. That's fine. Can I go look at this in person or will I get full of buckshot? We can order your police detail if you want, Cliff. You can just take a boat. You can see it from the water. It's right there. You can just drive by Lakeshore. You'll see it, Cliff. You can see it from the street. It's a private street, right? Is it that section? I don't even know. I can't remember where it starts and stops. Yeah, I mean, this is public access anyway. You can walk it at least. Yeah. Yeah, that's the buckshot problem. Okay. All right. So I guess let's take a vote. So how about this? I move that we not ratify the enforcement order issued in this matter. I like that. Thank you. Do I hear a second to Luke's motion? Yes, second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Ferzi? Yes. Thank you. Do we need a motion for you to send them an email, Sean? Not, I'll, you're welcome to take one, I don't think so, I'm happy just to give. Yeah, okay. Yeah, I'll send you his email address tomorrow, okay, Sean? Okay, thank you. This is what you signed up for, right, Sean? Yeah, this is what you made the big bucks for. I signed up for Cliff, okay, really. We all signed up for this. I apologize to all. I thought I could get here more close to like a halfway through point, but I see now we are basically done, but I'm here now. Well done, Jen. Well done. Well played. You're on the minutes as having been here. Well done. Well done, Matt. I know. Well, when I realized you were at, I was, I'm here now. Please catch the second half. I apologize to all. This is at least the fun part, Shannon. We're going to talk about the CPC application. Let's do the vote to support CPC. Linda, kick it off, please. You must have gotten the drafts in your agenda packet. I'm going to let, is Emily still on? Emily wants to take over this section. She wrote all the CPC applications. So for this application, right now it's just one. We kind of lumped kind of two sedge meadow restoration projects into one application, which includes converting part of the existing field to more pollinator habitat and then also a bat monitoring section. I know that the, right now there is kind of a, already at Sedge Meadow, if you were to go down from Black Cat Farm, part of the field is converted to pollinator meadow, or pollinator kind of habitat, and we just want to expand that using a brush mower, which would be a lot faster for Brian at least. And then for the bat monitoring kind of side of it, at Snakebrook Dam. We found out that there was six out of the nine bat species in Massachusetts were present on the Snakebrook Dam, and we've just been trying to expand that to other properties to see what bat species are present there. So by purchasing Sonobat, which is a bat kind of recognition software, we'd be able to really easily identify a lot of different bats that we have at Sedge Meadow particularly. That's cool. Yeah. Sorry, just because when the sun goes down, so Sedge Meadows behind me, and in the summer when the sun starts setting, like I'll come downstairs and I'll just look outside and it'll take like five to ten seconds and I'll see a couple bats. But of course, I only know them as bats. I didn't know there were nine different bats in Massachusetts. So anyway, it just was kind of cool because I like to look for them. I'm like, eat the mosquitoes. Yeah. And we also, yeah, the third kind of last part is environmental education. So adding some signage for both the pollinator kind of section and also about bats because there's a lot of misinformation about bats out there. So I think that would be really good. I took a little webinar from, I think, Mass Audubon on bats and they are so cool and they deserve an image restoration because they really do. That's, I love that. But the thing is that we've lost about 95% of the population, you know, and that was due mainly to like the white nose syndrome, which is why many of these species are either endangered or threatened. And, you know, we've always been working with birds, you know, and trying to improve the habitat. Tat for Birds, because we do have expertise on our staff, but I think it's time that we start branching out a little bit more, and that's when we learned so much about bats through the Snakebrook Dam Project, we decided, well, maybe we can expand on this a little bit and see what we have in Wayland. We already know the entire... You know, we know exactly what we have when it comes to birds because Brian's out there almost daily doing, you know, birding. But the bats, they were somewhat ignored. And I think it's time to give them a little bit more time in the, you know, notoriety here. So what about that? We had another CPC application, right, which was to... Just expand on the ADA trail for Sherman Bridge, right? Actually, I did talk to the previous, or the, what's it called, landscape company that we had contacted before in like 2023, and the price didn't change that much, so I don't think we would need additional funding for that. Oh, okay, okay. At first, we thought we were going to have to do it by ourselves, you know, the ADA trail, which is beyond, we don't have really the equipment to do that, so that we thought we might need a little extra money to have the contractor do it, and it sounds like we don't need that right now, so. Where would, did you say this was at Sage Meadow? What, the restoration? The ADA Trail. No, that's at Sherman Bridge, at 27 Sherman Bridge. Oh, 27 Sherman Bridge, okay. Yeah, so there's an existing driveway there. It's really flat. And then it goes up a very steep hill. And where it stops, where it's still flat, we were going to convert that into more of an ADA trail that leads to a vernal pool on the Trout Brook side of the property. So we've carved a little path that goes from the driveway to the vernal pool. We wanted, again, putting a little bit of education in there, like vernal pools, signage, maybe a bench or something. And so it will be a fairly short path, but it's going to be... And we have parking there also, so it would make it a little bit easier for people with disabilities to get out there and at least, you know, enjoy the vernal pool out there. Cool. I like it. So we're looking for folks to support our CPC application. We had talked, and we didn't get very far on this last time, about doing some sort of a spiffing up project on some of the conservation land with CPC funds. Did that? Thought process get anywhere? It does, Cliff, but we're just so limited with the resources that we have. You know, I only have one and a half staff for managing 1,200 acres, so... I'm going to get you some help here with these other monies. That's the whole thing. Yeah, but we can't hire staff with CPC funding, you know, so... I'm going to hire a contractor. Yeah, yeah, yeah. Yeah, I think we have to, you know... If we did that, what I'd like to do is more of a real comprehensive, you know, like, let's look at the project and not just because, you know, so much of our money right now goes to Herd Farm. We have so many visitors there. We have, you know, it's a beautiful, beautiful spot. And it seems like that we dump probably 80% of our funding from CPC and from our budget. To herd, you know, and I think it's time that we start, you know, you know, divvying out the money a little bit more evenly to some of the other properties. And I think that's what we have to get a little bit more, a little bit more thought process to that. And I'm looking for all kinds of input from you guys. You know, anybody, I know Sean walks the properties a lot too. You know, what is it that... How can we make improvements to our current properties that we have? Or not at all. I mean, I prefer some of them are just left alone and go back to nature, really, in some cases. We're doing, you know, like herd, we're still going to go over there and cut a whole bunch of bittersweet out of the big oak trees there. That's one of our projects this fall. And, you know, we can expand on that to other properties, too, because invasives are a huge, huge problem. You know, doing, you know, plant inventories, invasive plant inventories, that's something else we could probably do with help and see if we can somehow prioritize. I'd be supportive of that. I just don't think we should just let it drop. No, no, no, no. I mean, we have some thought process. Good idea. Yeah, you bet. Yeah, and I mean, we talked about doing a tree canopy study. Wellesley did that at some point. And, you know, that's done with an outside contractor, too. Lots of aerial photography coming up with a really nice survey of, you know, where the extent of our canopy is. There's all kinds of things that we can do. Again, you know, we're just so limited with the time we have here in the office and in the field. Castle Hill is an awful lot of invasives. That's a beautiful place. And it's easy for some people to walk in the lower, lower path. Which one's that? I missed the first one. Houston. Castle Hill. Oh, Castle Hill. Okay. Yeah. Yeah, that's a great one. I mean, we talked about putting together a cross-wheel and path at some point, you know, and, you know, that was always a dream of mine. And working with Janot, she had all the bridal paths and cart paths marked out and mapped at some point. And, you know, it's... Again, that's just a huge project. We tried to get an intern to do that, and we couldn't even find anybody in environmental planning school, in grad school, to help us with that for one summer. Nobody seemed to take an interest in that. In the old days, when I first started, we had volunteers. And they actually took care of the trails that they volunteered for, like Mike Patterson, all he did at Upper Millburg. And we had other volunteers. The former... Representative, what's her name? She used to mow the lawn, mow the pass with her lawnmower at Sedge Meadow going from her house. Oh, I think I know who you're talking about. I can't come up with the name. We don't have volunteers and we should be looking for volunteers. There must be people out there. Yeah, it's not a bad idea. We can start trying to think, like, I think it's worth trying to think about. We can, like, sort of as a separate thing, like, this is achievable for us to set up a program of some kind, me and another couple of you. We could think about it, like, how that would work, and maybe there's a way to find that energy again. Not for CPC or anything, but, like... No, they're basically like trail stewards, like SVT has trail stewards. Barbara, we used to have that for here. We used to have stewards who kind of volunteered for us for Concommon to do things. Yes, I'd love it to do that. I think the easy way to start that is a quick email or a flyer to like the COA who, you know, who's got free time, wants to help maintain our beautiful trails. They should, COA should really be, we should be on their radar. They're trailed right by the Sudbury River they were talking to us about. So we should be top of mind. I think that'd be an easy, low-hanging fruit to start with. We'd like to have, you know, three or four volunteers a year help us with low-maintenance, easy type of stuff. So, yeah. So I guess I'm with you, I guess, how we start it or who presents it or whatever that we need to think through that. Yeah. Okay, if I came in and picked you guys, we can come up with like a list of what is actually doable for volunteers so that we don't send people out there with chainsaws. No, I mean, like we occasionally get, you know, sort of people who just come to us and say, it looks like, you know, this, this, the boards on this on the boardwalk had heard me replacing. And I'll offer to pay for the wood and they do the work. But it's just sort of more episodic than it is, you know, having a consistent program. And we've, you know, we've tried with the Boy Scouts. I have made a huge list of projects that Eagle Scouts could do. And I've gotten zero return on any of those probably for the last five, six years now. So, you know, it's been kind of frustrating because, you know, there's always the initial enthusiasm and then it never turns into anything. So, and I think people are just so busy these days, you know, they just, they just, a lot of people just don't have the spare time, you know, so, but, yeah, I mean, you know, managing a volunteer program is, can be time consuming also, you know, so. You don't need a, Chainsaw always, because you can go out with your, I maintain the trail for Great Meadows at Herd Pond for decades, and I would use my regular saw if, if, and If it was too big, someone could do a chainsaw, but I took care of those trails for years. Now they hardly exist. Let me give a shout out to two of our most really valuable volunteers. It's been Bill Green and Steve Weitzman, who have managed the orchards at HERS for decades now. They started the new orchard, which is in the Westfield, that has the peaches, plums, pears, pawpaws, you name it. They do a fantastic job. We try to support them as much as we can with materials that they need, fertilizers and things. We're going to buy them a little bit of equipment this year. But they also took over the management of the old apple orchards, which is on the east field. So they've been doing a lot of work over there, too, on these ancient, decrepit trees. And we've replanted a lot of them with heirloom varieties and stuff. And they've been so dedicated for years and years and years. So everybody should go out there and really appreciate what they do. Because, I mean, now the fruit is all gone at this point. They had a great peach year this year, so. The pears were good. The pears are always good, yes, yes. The one we do is kind of a catch-all to originally Cliff started this question with CPC. Why don't we, and maybe their email, Linda or Emily, have like a running one page for this year, maybe like now to the end of the first quarter. Here, you know, with our fairy godmother, we're to grant us all this. We'd want new signage here. We want this here and everything. And then we can then break it down to, okay, how much do we want to throw on a CPC list for what year? Like almost like a two or three year planning list. And what could a COA volunteer or an Eagle Scout do? And literally just go to these organizations. We need someone to do this, A, B, and C. And so I guess for homework, can we all maybe email to Linda or to Emily over the next few months the wish list of what we want to see done on our trails? Cliff, what you're talking about? And we'll just start piecing that together. Does that work with everybody? Can I have it all in one spot? Are we still voting on the current CPC proposals for the past? We do that because then we can write it into the application that the commission supported it. Right. So, everybody good with that? Nope. Okay. So, for now, I guess, can we get a motion to, and by the way, thanks again, Emily, for putting that together there, a motion to support the CPC application, please. So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? No. John Storer? Yes. And Sean Fersey? Yes. Okay. Thank you, folks. I don't see any more public comment. Any hands up? Nope. Six minutes. Babs, how are we looking for October 21st minutes? I spoke to just today I gave my comments. Were they substantial or were they just little I's and T's? They were fine. Okay. So do you want to make a motion then to approve? Anybody else have any thoughts on the 21st of October? Emily does a good job. Yes, she does. Yes, she does. Okay, everyone approve the minutes of October 21st, 2026 with Barbara's slight additions and edits. So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes, sir. John Storer. Yes. Shannon Fischer. Yes. Shannon Fischer, yes. Thank you. I think I missed you last time, Shannon. Sorry. I missed most of the meeting. It's cool. That's what you get. Very on time, Shannon. Very good. Now just sit here and just watch us take minutes. Okay. That's all I got on my end. Anybody else? Anybody else on their end? Oh, I just want one quick update. Just today I got an application for the one pheasant run tree removal violation. So that finally came in after a few months. But I still have a whole other list of people that I need to send out letters to. Oh, goody. Oh, goody. I know. It continues. Okay. That's all we got. Can I take a motion then to adjourn for the evening, please? So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Last roll call of the night, please. Lisa Aubin. Yes. Luke Legere. Yes, indeed. Barbara Howell. Yes. Cliff Lewis. Yes, sir. John Storer. Yes. Shannon Fischer. Yep. Sean Ferser, yes. We are adjourned, folks. Thank you. Bye, guys. Bye, everyone.
I just had a question on this slide that was up. It was just a little confusing for me in the packet is that we have the Chapter 103 planting plan, right? And that's to address the planting 100 dBH for the 200 dBH you're taking down near the new site for the plant. But some of those plantings are going into the floodplain and in the riverfront area. Yeah. Wetland replication, not replication, wetland trees that are coming down along the pipeline that are being put in this area are kind of, some of them are going into kind of a more of a Chapter 193 area upland. Yeah. So it's just, it was a little confusing. Well, trust me, it was a little confusing for us to try to sort through what we needed to do. So if... You know, if we're off the mark, please let us know. No, I think it was just more confusing to read, but I think you're putting the landscaping is fine. And I think the only, right, there's still a piece of mitigation for the tree removal that's not going to happen on this site and it can't happen by the pipeline. So is that something, Linda, that needs to be discussed as well, like other areas? I think we could just probably put in a condition at some point that says a final landscape plan will be prepared near the end of the project. I mean, nothing's going to be planted anytime soon because it's going to take a while to put this whole project together and then remove all the other equipment. So, I mean, we'll have a little bit of time to mull things over. Yeah. And, you know, there's always going to be project, I mean, project this size, I imagine there's going to be some changes, some, you know, alterations and where things get cited or put or, you know, you know, through the course of the construction. So it's sometimes a little bit too premature to say you're going to put a tree here, you know, when that might not ever happen. So, yeah, we're, I mean, and also the contractor, you know, it's. If they're able to avoid trees that we are being a little bit conservative and showing, you know, their limit of disturbance extends to this area along the pipeline. You know, we try to be conservative so we don't underestimate quantities. You know, obviously it's going to be easier for them if they don't have to remove certain all the trees. Oh, no, that'd be excellent. If we can alter, minimize, that'd be nice. Yeah, so I'm happy with putting that in there that, you know, we can, the final landscape plan will be expected at some point, you know, during or after, you know, most of the construction is completed, so. Yeah, that works. Something you can always work with the commission on, too, so. Commission, anything else? Other comments? I had a couple comments, questions. Go ahead. This lagoon, this just gets used when you're flushing out one of the tanks, is that right? Yeah, the first basin here, but then it has an overflow. Let's see if I can find that. I was looking in the packet and it was unclear. Yeah. There's an infiltration lagoon and a backwash lagoon. Yeah. So unfortunately, Matt, who's the expert on that, wasn't able to join us tonight. I don't know if Mike Hansen knows more details or may not be. Describe the process when you change the filter media, what happens? Well, the filter media that has the PFAS would not be what's being backwashed into that. That would be physically removed. Right, that gets smoked. Okay. So this is basically potable water when they have to flush the systems a little bit. Then it goes into there, and the idea is that it'll infiltrate in those lagoons. Okay. So there's not a lot of water there and the infiltration rate will be okay? Yeah, it's just the backwash once in a while when you're doing the system and the response is in the packet to your consultant. And in your packet here you have some information about what will be done during construction to keep erosion and stuff under control? Yeah, there's standard processes that'll be done, you know, silt fence, hay bales, you know, all the standard means and methods for joint construction will be applied. One other question that's really not conservation, but this treatment facility, this is a standard kind of carbon treatment plant, right? Is that right? Yes. And this is just a garden variety design. There's nothing really special here, I don't think, is there? There's nothing particularly, you know, cutting edge. No, this is pretty widely used. Not like the chemical plant that we have for the temporary thing? Yeah, we evaluated continuing with that type of media, the resin media versus carbon and decided that carbon... This design gives you more flexibility for our future. Yeah, yeah. And, I mean, a lot of people use this design, whereas the other one, not very many people do. Okay. Yes. Yeah, those are my questions. Okay. Commissioner, anything else? So, Linda, you're good on your own then. Yeah, I don't think we have anything more further to discuss, do we? Well, it doesn't sound like it. So we could close it and then just put the conditions that we just talked about, it sounds like. You're good with that, Linda? Yeah. Okay. Commissioner, would we go with that? And if so, would anybody like to make the motion to first close the hearing? Yeah, I'll move. We're closing the hearing under both. Do I hear a second? Second. There goes Lisa. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes. John Storer. Yes. And Sean Ferris, yes. Thank you, folks. Anyone want to take the next motion? Kirsten, what's your timeline? When are you going to be starting to dig this? We are going to be bidding it. I think it's late end of the summer. It's probably the fall. It's kind of going to be more of a starting next winter. You're going to start at the... Does the shaft L end and work your way towards Wayland? That's not really been determined yet. I see. There's going to be two contracts, so they may be going along at the same time. Yeah. Okay. All right. Thank you. When are you going to dig up the road? Jen, that's a question. Or Old Connecticut Pass. I assume the road you mean? Yeah. So that'll be part of the horizontal contract with the transmission main and the pump station. So, yeah, the contractor will have some discretion on how they want to phase that. We're still meeting with the different departments of the town to work through the restrictions that will go into that contract for timing. Okay, let's move on here. Anyone make a second motion? Yes, I move that we issue an order of conditions approving the project under the State Wetlands Protection Act and Chapter 194 with conditions as discussed. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes. John Storer. Yes. Sean Fers, yes. All set. Thank you, folks. Thank you so much. Thank you. Good night. Good evening. Much appreciated. All right. On to B. This is the Massachusetts Central Rail Trail DEP file number 322-1069. Its continued notes of intent filed pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by the Department of Conservation and Recreation for the construction of a trail on an inactive railroad right-of-way beginning in Sudbury and extending into Wayland. The proposed work is ended with 100 feet of a boarding vegetated wetland bank. A land underwater and boring land subject to flooding in a 200-foot riverfront area. The project is shown on the Wayland Assessor's Map 22, 23, 26, and 27. Linda. Looks like we've got another large project team here to present, so. Okay, let's kick us off. I'll start. Hi, everyone again. My name's Amber, Trails and Greenways team at DCR. I'm joined by our consultant team, Dan and Marissa. Also joining tonight is Erica Larner. She's just as an attendee here on the list who has been our lead environmental permitter from MassDOT. Just in case there are any questions, given the nature of the multiple DEP comments, should she need to speak, she's happy to weigh in since she oversaw this for the many years leading up to this fall. I think Linda... I'll defer to you on how you want to address anything related to either the DEP memo or the comments from the commission. Welcome to present any new material that's come in since the last hearing and just update the commission with that and allow them to ask questions, I guess. Okay. Sure. I'll start with the DEP memo, which doesn't have any new content per se. DEP had kind of circled back on the same three comments that we had answered in a subsequent memo. I don't think there's anything new to acknowledge except for maybe the Weplin replication area, Dan. There was a request by DEP to consider not consolidating both the wetland replication areas on the north and south side. Correct. And we defer to the commission on that. Yeah, agreed. Yeah, we had designed it with one and by not having it just hydrologically connected to really everything on one side. But again, defer to the commission on the preference on that.
Wouldn't you think they are connected since the groundwater levels are probably pretty high over there? I would think so. There is just... Considerations with the berm. We believe that the connection, even just through all the resources areas being in the watershed, really, of the Sudbury River and kind of adjacent to the floodplain as well would provide that connection. But again, the majority of the impacts are also on one side versus only 11%, I believe, on the south side. So that was also part of our approach there as well. Well, you know, you did receive the information from Natural Heritage, and you'll see from, I mean, we can't speak of what the species are publicly, supposedly, but you can see that all the habitat is on the other side of the trail, not the, you know, the Washbrook side, right? And, I mean, if we're going to do... I would think some sort of alteration there, which is, you know, creating a wetland replication area. I think it makes sense to have it on the other side where there's where you're not going to get the habitat necessarily, maybe a little, but not not the same. You know, does that make sense? I mean, I guess I'm looking for the least amount of alteration in the priority habitat area. So how big is it? Yeah, just Sovin remembers it is 19 square feet on the south side. And we found that it's Replications are more successful when you're putting it in one area and less overall disturbance. That's 19 square feet you're talking about here? Yeah. Sorry, that's on one side. The other side is 19 square feet on one side. Yeah, that's not very big at all, is it, Cliff? Just whatever is easier to build for that. Yeah. Yeah, I mean, I think we discussed, too, that when Amber and I went out there that the DPW in their... And they're exuberance to clear off the landfill had basically drove over the wetlands a few times. And so if anything needs, you know, reconstruction and rehabilitation, it would be that side where we basically lost the wetlands from that activity. So if anything, it should be bigger, you know, so to compensate for that.
So I think that's the only new thing that would be up to the Commission. Just to address the third question, which has come up a couple times with DEP regarding best BMPs for stormwater, you know, the approach that we are taking to this entire project is to minimize disturbance to the wetland. If we start putting in any kind of infrastructure, we are now excavating out into the wetlands, which is actually kind of antithetical to The Stormwater Handbook. So considering that we're dealing with sheet flow and not pollutants that are on the path, we think our approach is the least impactful to the BVW themselves. So I think we just kind of phrased that question three in a different way. I don't know if there's anything you want to add, Dan. No, not in particular. I think that this is kind of a precedent we've used on some other similar shared-use path projects. And Marissa did review it with some of our other engineering staff. Marissa, I don't know if there was anything that came out of that discussion that's worth chiming in on, but I feel like it was pretty unanimous on this approach. Yeah, nothing really to add. We reviewed it and it's been successfully implemented on other rail trail projects. So we feel it would be successful here as well. And that's why I had brought in Erica because she and I were discussing this last week leading up to this. So I don't know if Erica has anything to add or if the commission wants to hear from her, but she has been permitting these for quite a lot of years. So what is Sudbury going to do? Are they okay with the sheet flow and the gravel swale and the gravel trench or gravel swale, whatever you want to call it, on the one side? Yeah, so we are going to our second commission hearing next Monday. Unfortunately, we couldn't go to the last one because the DEP comments came in too late. They had the same approach on the Bruce Freeman Rail Trail, which they permitted and built recently, as we're doing here. So just to recap, so the plan is to basically pitch it towards the side of the landfill in that direction, the northern side, right, and have a swale, gravel-filled swale on that side to capture the sheet flow? Or is it just mainly a gravel shoulder? It's more like a gravel shoulder, not a swale. And there's slight deviations with which way it pitches across the entire length that accounts for Trying to match as closely as we can to the existing embankment. So as to, again, like retain as much as we can of the existing embankment and have the least disturbance in the areas, the overall approach. Like we've talked before, I mean, we... You know, the Washbrook habitat in that environment is extremely sensitive and special. And so, you know, if there's anything that I would stress is to try to keep as, you know, much of this, the sheet flow and stormwater out of that area. I mean, already, the other side is somewhat. Probably has leachate and other things from the landfill anyway. So I'd much rather have, you know, whatever water goes, it goes in that direction and not in the direction of Washbrook and in the priority habitat over there. So, you know, in all cases where it's possible, I would like to see the pitch go towards, you know, I guess the northern side of the trail. So, yeah. Yep, I understand. And, you know, I'll leave that in the permit that, you know, that's what our priorities are. Okay. Is there anything else? The first question, and then I'll go through the commission questions. The first question with the cut and fill, we kind of ended up exactly where we started with the NOI. I think probably Marissa and Dan can speak more to this, but we gave a lot more information and then we wanted to condense it, which was very similar to what was presented originally. Okay. I haven't quite tracked what's the end goal on that one. And that was DEP's comment, though, right? That was DEP's comment, yeah. Yes. So, yeah, and then addressing the last hearing, there was the request to share the hydraulic study that was done looking at the flow of the Sudbury River and whether our project would impact that in any way. I think the scale and scope of what was requested to address a much larger regional flooding issue just can't be achieved. With the amount of land, the land owners, but we're confident that maintaining the existing bridge structure is not contributing to any additional flood elevation or intensity of flow. I think, Marissa or Dan, if you have anything to add to that. No, I think that covers it perfectly there. That was really what influenced our design and, yeah.
But I'll mirror that. Like I said before, I think this is outside the scope of this project, and what we're building is a rail trail. You know, we're not looking to do a massive reconstruction of the railroad trestle, and that's not your responsibility anyway because it's owned by MBTA. I would think that that would be a narrow wheelhouse. Okay, Commission, anything else? Thoughts, comments, concerns? Okay. Linda, you're good? Yeah, I think so. Somehow I did lose my notes here and what do I do with this? Oh, there's a number of conditions that when you guys are okay with those that Natural Heritage gave you guys added to the project. Okay, yeah. Yeah, so some of those details like the passage and erosion controls and things like that will be updated into our construction set. The time of year, you know, is a big... Consideration. We talked to him about that. Yeah, there's nothing we can do about that anyway, right? So, yeah, it's all about the breeding season. That's right. Disrupting nesting, so. Yeah, yeah. And, well, oh, there is one question I had because you did talk about the observation on deck and that you want to keep it where it is and you want to continue with that original plan. But what I don't think has been finalized is who's doing the maintenance for the rail trail. And who's going to take, who's going to, is, you know, is somebody maintaining this, you know, or keep, I mean, I don't think there's been an agreement with the town. I could be wrong, but that was one thing I had a question on. And the other thing was, is that I was, again, it was brought to my attention because I didn't catch us in the first pass through the review of your plans, was that I still don't understand why. Why is there a section that's still gravel? I mean, why? I mean, we have a paved path all the way from, what is it, Waltham? And then there's this section in Wayland that just turns into gravel? I mean, does that, why wouldn't it be consistent all the way through? Well, Wayland built that. Yeah, Wayland built that with the MassTrails Grant a decade ago. And I don't know why the decision was to do that. But it's still part of the Mass Central Rail Trail, though, right? And so there was no, there's no desire at all to pave that like the rest of the trail? Oh, no, there's a desire. It's part of this. But what's out there today is what Wayland had built. So you're not paving it then? Is that what you're saying? No, we would be paving it. That's what's inclusive of this. But it says on the plan's gravel. Hmm. Is that calling out the existing gravel path? Is that what it's doing? I'm assuming that call-out is coming from the survey, which is showing that there's an existing gravel path there. Okay, but that it's not supposed to remain a gravel path? It's actually going to get paved? Oh, okay. That's why it was confusing because you look at the plans and it says gravel bike path. And so to me that, you know, for your proposed plan, that makes it sound like... It's going to remain a gravel path. The idea is to make it a consistent surface for the entirety of the Mass Central that we have at least with a T. Oh, okay. Well, that solves that. I thought it was kind of odd, like you would just kind of stop it in one place and then just pick it up again in the other, you know, it just seemed kind of not logical. It must have just been the most cost-effective thing to do in the first place. What's that, you mean? The stone dust that was put in, I guess. That was before my time. I have no history with that whatsoever, so. These drawings you're talking about, are they in the packet somewhere? It would have been probably in the last practice from three weeks ago. Everything's online, too, Cliff. We have it on the Conservation Department webpage. There's a lot of stuff online, Linda. Just go to the Town website, Cliff. Go to the Conservation Department. There's a lot of stuff on the Town website, too. There's a little tab on the left that says Projects, okay? So everything that's pretty much current that we're working on and talking about. We dump the entire NOI package in there, and so all the plans and the new sets of plans are all in there. Commission, if we're good on comments, I know Tom, this is him raising his hand here, had a quick comment. Tom, I assume? Yes, and I'm unmuted at this point. Tom's back at Rolling Lane. I should say that I am at this point officially speaking for the River Stewardship Council. I should also explain we actually have a regulatory role on this project. There will be, we believe, a Section 7 permit. Required here for work that affects the wild and scenic river. But the issues I raised last time about the flow restrictions in the river, We are basically asking that the scope of this project be expanded. You might be right that altering the flow characteristics of the causeway is not within the scope, but it is an issue, and we're requesting that the scope be expanded. So we are we have or we are now contacting the commissioner of DCCR and asking she get involved. There there is a letter that. I sent all of the CONCOM members late this afternoon. I don't know if any of you have had a chance to look at it. You'll get an official copy probably tomorrow when it will go to DCR. And so we're asking that you have your engineering organ. I should mention first, I knew nothing about the DCCR. But I have now looked at your website and you have a rather impressive set of climate adaptation goals, which I think are in fact right in line with ours and what we want to do. And you also appear to have a very capable engineering organization. And we are basically asking that your engineering organization be assigned to figure out options for reducing the flow restrictions of this area. Unlike the regulatory processes, your climate goals appear to allow for correction of existing problems, and that's what we're asking for here. So I suggest that the hearing be continued to give them a chance to evaluate the correspondence which we have sent and respond. Thanks, Tom. Where did Linda go? I'm here. Okay, so you heard that, you were there for that? I am here, yes, I'm right here. I was only sure. Any, Commissioner, anybody want to respond to that? Tom's asking us to continue it, to respond to a letter, so I'll speak last, but anybody want to speak to that, respond to that? Sure. I'll weigh in, Sean. I certainly appreciate all that Mr. Siaka is saying, all the work he's done. I found a lot of the information he's presented incredibly interesting. But at the end of the day, as he acknowledges, as we said last time and as Linda said earlier, what we're talking about here is way beyond the scope of this project. From my perspective, we can ask the applicant if they'd like to continue to... Consider this further or address it. We can't make them agree to continue for that reason. In the same way, we can't force them to change the scope of their project. We can ask. So I guess those are sort of my reactions. I'm happy through you, Sean, to pose those questions to the applicant. But from my perspective, those are things that are their decisions, not ours. And as far as I'm concerned. I don't really have any more questions here. So just sort of putting my cards on the table, I'm comfortable with the responses we've received. I think like with respect to the issues we've talked about tonight. I certainly agree with keeping the replication area sort of together on one side. I think that just design makes more sense to me. I think also with respect to sort of the stormwater design, just keeping it simple, minimizing the impacts and alteration to resource areas to me makes sense. So I'm good with this design. I don't really have any more questions for the applicant, but that's my two cents. Thanks, Luke. Anybody else? Well, I can add to that to what Luke said when Amber and I talked about stormwater, too. I mean, the stormwater levels are so high there. There's absolutely nothing we could do in subsurface anyway. So that really limits anything we could put in there other than a surface feature for the most part. So I think we're kind of constrained by site conditions of what we can really do. Regarding the railroad trestle and stuff, I think that's just going to have to be a whole other NOI. I mean, the amount of time it would take for the design and the permitting and everything else, it would take many, many months, even a year to do that. And I don't think there's any reason to hold up this project for something that's far more complex and complicated. So, I mean, as opposed to trying to tack it onto this project. I agree with Linda. Actually, if the data were to come back that says that is a constraint and the data that I've seen does not so indicate, whether there's a rail trail on top of that trestle or whether there's not, replacing the trestle is going to be the same job either way. That should be a separate project, not part of this. Okay. Anybody else? Commission? No, I agree with Luke and Cliff's sentiments. I mean, we can certainly ask the applicant to consider it, but approving this here shouldn't preclude a future project to address the trust. Yeah. Yeah, so agreed. So, Tom, thank you for all your research on that. And so, on your behalf, I think you were asking us to ask. So, I guess, you know, Amber, Marissa, who's, Daniel, who's ever in charge of this? We should really ask you to continue, Tom, but I would agree with, you know, the commission said this almost is a whole different NOI, different issue, and happy to address it at some point down the road, but not, wouldn't be in the scope of this project, would be my personal opinion, but certainly can ask the applicant if they want to continue to talk about it. So this would be a form of asking if y'all would like to talk, continue about it or not. Yeah. Yeah, I mean, I understand the instinct to try to do a lot of things with co-benefits when you're doing any kind of infrastructure project. You know, what's challenging here, among many things, is, you know, the scope has been determined since 2019 when we got this on the MassDOT tip. It does also involve Eversource and all of their towers, and so there's a big stakeholder that's not accounted for beyond just permitting and sheer cost. I don't see a path forward to achieve any meaningful advancement of our knowledge of any efficacy of changing this before the next hearing. I mean, to me, this is like a year-long regional hydrology study. I just don't think anyone at DCR or even a peer review could. Evaluate how to change this to get the benefits that we're talking about in the scope of a couple weeks. So that's my take on that. I don't know, Erica, if you have anything to add regarding what you've seen on this project to date or any kind of permitting. I know you weren't here for the last hearing when we were talking about this, but yeah, if you want to say anything. And then we're a son, Dan. So, sorry. Yes, my apologies. I just got promoted. My name is Erica Larner, Wetlands and Water Resources Coordinator with MassDOT. And I just did want to speak to the funding and the length of the process for that and that frequently projects can be on our tip list for five years at times before they actually get to construction. And that design on this project as it was began multiple years ago. While I think that my unit and DCR would very much like to consider the future of the area as a whole for this particular project and the funding, it has been tied up through federal funds already through the fiscal year, I believe it's 2027, that these projects have already, that the work has already been. The funds have already been allocated, and we wouldn't be able to go back and redesign and add this to the construction and have the funding to pay for it at this time. Though I'm sure that people would be very interested in hearing about the potential for a future project. It would take several years of redesign and attempting to find additional funding to go back and look at it, and I think it might kill the project, sadly. Good. Thanks, everyone. Okay, so I think we have our answer, hopefully, Tom, that clarifies that for you. So if there are no other commissioning questions or thoughts, sounds like Linda and we're all ready to close this. Is that right, Linda? You good? Good. Sorry, I'm multitasking. Love it. Would someone like that to close the hearing under both? I move that we close the public hearing under both Chapter 194 and the State Act. Thank you, Luke. Do we hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Lisa, oh, you're muted. Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. And Sean Ferris, yes. Next motion, please. I move that we issue an order of conditions approving this project under both Chapter 194 and the State Act with conditions as discussed. Thank you, Luke. Do I hear a second? I hear a second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Ferser, yes. All set. Thank you, folks. Appreciate it. All right. Thank you. We'll be in touch. Thank you. That's good. Okay. On to 2C. This is 68 Lakeshore Drive. DEP file number 322-1057. It's a continued notice of intent filed pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by Jeremy Jenkins for the after-the-fact work. Performed at 68 Lakeshore Drive in Wayland, Mass., including installation of a floating dock, gangway, ramp, retaining wall, patio, and repairs to the covered porch steps. Property is shown on Assessor's Map 42D, Castle 56, and is located within a 100-foot buffer, sorry, of a boarding vegetated wetland bank and land underwater. Linda. I don't believe we have anybody here. Emily, did you hear from Jilson of whether or not they were continuing this? I did not, no. So what they did, what Jilson Company did was submit like three, was it three RDAs? I lost count, I think. I think it was just one RDA, but for three things. Oh, okay, that's what it is. Instead of doing an NOI, for some reason, he decided he would just do a request for determination for a portion of the project that came in too late to make it onto this agenda. So I think we should just continue this one, and then we're going to probably address the project under a meeting instead of a hearing at the next meeting, okay? And then, Linda, remind me, what's the next meeting date? It would be December 2nd. Holy cow, December, get out of town. Okay. I move that we continue this hearing under Chapter 194 in the Act to December 2nd, 2026, after 6.30 p.m. Thank you, Luke. Do we have a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes. John Storer? Yes. And Sean Fair is a yes. Thank you, folks. On 2D, no DEP number here, Linda? Oh, no, we got one today. 322-1071. 1071. Okay, yeah, so this is 61 Lincoln Road, Wayland Mass, DEP file number 322-1071. It's a continued notice of intent filed pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by William Haney for the installation of the Beaver Pond Leaver Pipe System. The proposed work is within 100 feet of a boarding vegetated wetland in 200 feet of a riverfront area. The product is shown on Wayland's Accessive Map 08, Parcel 02. Linda. Is Ryan presenting this for Goddard Consulting? I am. Good evening. For the record, Ryan Rosin with Goddard Consulting. Yes, since the last time we had to continue because we didn't have a DEP file number, but as you just heard, one was issued earlier today. Do you want me to give a recap? Nothing has changed. There's no new information. There were no technical comments from DEP. On the NOI or anything. There was one question, I think, from the initial hearing that Linda had that I did get some additional information from Beaver Solutions about, and that was about the water level. If we lowered the water level, would it affect the Beaver Lodge? And so I asked Beaver Solutions that, and they said at this site, lowering the water level, you know, six inches would not have an effect on the Beaver Lodge at this location. Okay. So is there, I don't know if there's anything else that the Commission has questions about, or if you want me to give a recap of anything from the previous meeting? I guess we'll start with Lynn. Lynn, is there anything else other than the DEP number they were waiting for? Or are you good with knowing that answer? No, I mean, I think we heard, I mean, if you guys remember, we heard the discussion about... Putting in a beaver pond level device. And we did something very similar just across the street in Hazelbrook maybe a couple of years ago. SVT had a permit for that also. So it's, you know, it's just an issue we have in town. We have a lot of beavers, right? Yes, we do. Okay. Commission ends. Anything else? Living seems good with it. We good? All right, Ryan, I'll make it easy for you. And we want to make a motion to close the hearing, please. We want to move to close the public hearing under both Chapter 194 and the State Act. Thank you. Luke, do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Lisa, you're muted. Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Fischer, yes. Thank you. Next motion, please. I move that we issue an order of conditions approving the project under Chapter 194 and the State Act with conditions as discussed. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa, sorry, Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Fers, yes. All set. All right. Thank you guys very much. Appreciate it. Have a good evening. Take care. All right. On to 2E, 17 Hazelbrook Lane. Do you have a DP number here, Linda? I don't think so. Do we? Yes. 1070. 1070. 1070. 1070. So 322-1070. Notice of intent to file pursuant to Wayland's Wetlands and Water Resource Protection Bylaw and the Wetland Protection Act submitted by Connor and Stephanie Davis for the construction of two additions, landscaping, and replacement of the septic system at 17 Hazelberg Lane, Wayland, Mass. The property is shown on Assessor's Map 11, Parcel 79. It is located within a 200-foot riverfront area in a 100-foot buffer zone of a boarding vegetative wetland. Linda. Oh, who's here for that? Is that Brian Nelson? Yep, looks sweet. Hey, Brian. Hi, how are you? Doing well, thanks. If I can share my screen? Sure. All right. Well, that's loading. My name for the record is Brian Nelson from Metro West Engineering. Hopefully you can all see that. And so we are here for a notice of intent for the property at 17 Hazel Brook Lane. Shown on this presentation board, the site is located on the southerly side of Hazelbrook Lane, which is shown at the top of the screen, kind of running from west to east. We're about a thousand or so feet west of the intersection of Gleason Lane and Hazelbrook. And it's about a 5.1 acre site. It's kind of long and narrow. Existing house is located pretty close to the street. There's a small shed also in close proximity to the street. Site extends back several hundred feet. There was a notice of intent previously for work done at the rear of the house for a shed and a barn that was constructed back there. I'm going to zoom in just a little bit. Just to kind of give you a little bit closer view of what we're here to talk about tonight. Again, the existing house kind of runs basically southwest and northeast. It's long and narrow, located about 64 feet or so off the sideline of Hazelbrook Lane. There's a small shed, as I mentioned, right here. Hazelbrook, which is a perennial stream, cuts through the property, basically comes across Hazelbrook Lane, flows in a southwesterly direction on that bank for Hazelbrook. Is shown in this blue line right here. And it continues along and off property to the southwest. We have a bordering vegetated wetland to that, which I'll zoom in one more just to get a little closer. Bordering vegetated wetland, which comes off of the bank of Hazelbrook. Kind of protrudes out into this low area between the house and the septic system and then merges back in with the bank over here. 30 foot no alteration zone shown in red here and then also when you get to the other side over in this area here. Area around the house, the light green shows lawn area, the darker green shows planted or wooded area. So we've got some lawn area immediately adjacent to the house. There's a footbridge and a gravel road that kind of lead from the house area. And elevations are high up near the house. Obviously, this area with the wetland in it is lower by about 8 to 10 feet. And you come back up a rise to the south-southwest, and the septic system is located, the soil absorption system is located in this high area right along the westerly boundary. We are here to talk about two small additions. I'm going to share, just switch to full size. I'm going to go to a proposed board. Again, we're oriented the same way here. Hazelbrook Road is at the top, running from west to east, north going straight up. Existing house, again, is shown in brown. What we're looking at are two small additions, which are shown in blue. Basically, There's a roughly 120 square foot addition that will be situated on top of the existing deck. The existing deck will be removed and replaced, but the existing deck will replace part of that footprint where the proposed addition will. There's another addition which is about 150 or so square feet which is located on the rear of the house as well. The existing deck, the outline is shown here. That will be expanded a little bit. The new deck footprint is shown in magenta. So basically a little bit of an increase in deck size, a set of stairs in the back. And what we're proposing to do, basically, we have roughly between new addition surface and Kind of where we're overlapping with existing impervious area. We've got an increase of about 138 square feet of impervious area on the property. So it's a relatively minor increase. What we're doing is mitigating that with a small Coltec infiltration system located in the front of the house. And that's shown in blue right here. Kind of the larger part of this project is... Replacement of the septic system. And right now in this configuration will remain in the proposed condition. There are septic tank and pump chamber located behind the house in this area here. There's a sewer force main that runs along the gravel road up to the existing leaching field. And we've got the existing lines are shown in blue. What we're proposing to do is Just due to the increase in room count with the additions, construct a new Title V compliance system, which is shown in magenta. That's this footprint right here. And really we're looking to construct that in the same place we had soil testing witnessed by the health department and looking to basically use the same area. Soils are good. We're not removing any trees to do this. And we have file plans with the health department. The septic system is located at closest, about 80 feet away from the wetland boundary. And one thing I'll just zoom out a little bit just to show you, the majority of this property is located within the riverfront, the inner riparian zone. Is the yellow line here. So the southerly addition and the deck modifications are entirely within the inner riparian. The rear addition is basically outside the inner riparian, but still within the riverfront area. And the septic system, again, the majority of it is located outside or within, outside the 100 foot, but within the 100 to 200 foot zone. I'm not sure if Dave Burke is here to talk about resource areas. If he is, I'll let him jump in. If not, I'd be happy to answer any questions. Thanks, Brian. I don't see Dave. Well, Brian, this is our third project here, probably in the last few years. So I think at least I'm pretty familiar with the board here. What's that? We're very familiar.
Okay, so I guess Linda, you want to start with you? Questions? Sure. So I am confused about how much alteration is the inner riparian. You have a couple of tables. You have one on page three of your narrative that states you're adding 231 impervious into the inner riparian. But then you're subtracting 93 in the outer riparian? That's correct. Yeah. But you said you were putting an addition in the outer riparian. So there's some overlap between where the additions are going in present impervious surfaces. So we have a reduction in the outer or the 100 to 200 foot zone of about 93 square feet. We have an increase. But where's that at? If you're looking at the outer riparian, where is the reduction? It's in the rear with some of the landscaping that's occurring and some of the modifications that are happening. That's in the rear of the house. And the deck for the biggest increase in impervious area within the inner is the new addition is replacing or going on top of an area that is presently a deck. And did you include the retaining wall as part of that impervious also, the new retaining wall? Yes. You added that in there too? Yes. Because now if you go to page three of the NOY, you have different values in there. So you're saying that the total square feet is 131 and the inner repairing is 97 and the outer repairing is 34. I will take a look at them, I believe. They should be the same. I think they're presented a little bit differently because we have a breakdown of wooded in the landscape. So I don't think we've got the totals there, but I think we've got the same numbers, at least from what I can see, planting at these quickly. I think it's the net amount between the gravel and the impervious. It's the total amount, the total of those two. Yeah, really, the big one is the degraded area for riverfront. So it's the impervious plus the gravel, hard paths, you know, everything where the topsoil has been removed. That delta is even narrower in the riverfront. It's almost awash when you look at new impervious versus riverfront. It comes down to about a seven square foot decrease. But so then your total, if you add the gravel and impervious for proposed, is almost over 20,000 square feet, right? So we're well above the 10% alteration in the riverfront, and that requires mitigation. And I'm not sure I would agree with the Coltec as being a mitigation for that. I mean, what you're doing is you're just infiltrating roof water, which is pretty clean anyway. You know, I know Connor has done quite a bit of work in, you know, as far as plantings and doing that sort of work. But the one thing that was always, that was in the previous permit, that was a 15-foot no disturb along the wetlands. I mean, I think I'd like to see more work done in that 15-foot no disturb, which is currently lawn. And I would much rather see that as mitigation versus putting in a, digging up, you know, the lawn and putting in a call tech chamber, infiltration chambers, except for this small amount of impervious that you're adding. So the other thing too, I should point out that the numbers shown here on the table are basically reflective of the riverfront area that comes off the easterly bank. of Hazelbrook, which is shown on our plan. It doesn't include the total riverfront area on site, which totals about 177,460 square feet. So our alterations are well under the 10% threshold. We did think that the... The infiltration system would be a good thing to do just to catch some of the downspouts which have pipes running to daylight right now. You know, in terms of restoration, I think Connor and I can regroup and look at that. But this site is impeccably maintained, certainly has a pretty robust and healthy and well-maintained plant community on it. So I'll just throw those things out there, but we can certainly take a look at that. Sorry, I was going to say, can you put the map back up and just show? Sure. So the riverfront area you noted in the narrative is not the total amount of riverfront area on the property. Yeah. And I realized that before I hopped online tonight, so I apologize for that, and we can correct that in our filing. Well, I'd like to say that in the correct, because, you know, that throws the whole thing off of, you know, the regulations. If, you know, you're altering more than 10%, then, you know, there's always mitigation required for that. And, you know, now you're saying that it's not, it's still over 10%, but not as much, right? It's below 10%. What we've calculated is, and I'll zoom in just a little bit, is this blue line is the bank. So we calculated everything on the easterly side or to the right and plan on all this. But there is another bank on the other side of Hazelbrook, the westerly side. And all this tannish colored area would be included in that as well, which drives that. That total riverfront area up from 141,700 roughly up to about 177. And when we take the total degraded area in the existing and the proposed condition, we're well under the 10% threshold. Yeah, but you have land use within total riverfront area on page three, and it says there's 6,106 square feet of impervious and another 14,403 feet of ground area. So that combined is 20,000. So you still are over, you know, the 10%, right? I will take a look and see. Those are the totals. I don't want to argue this point, but I just want to make sure the numbers are accurate and the permit. And again, you know, the two, both, both permits that we issued before stated that we'd like to see a 15 foot no disturb, you know, that a vegetated 15 foot no disturb area that's, you know, that's not long. So, I mean, again, my preference would be to see that that's a standard condition we have in every single permit that we issue. And, you know, that, oh, the other thing is that you used an old fee structure that was updated a few years ago. So update your files with that. Okay. I don't know how much has changed, but there's a brand new fee structure for Chapter 194. What else is there? You said in your Notice of Intent that you had an alternative analysis, and did I miss that? No, there shouldn't be any alternatives analysis for this one. You marked it as yes, so we're paid to my own now.
Yeah, on page three again. As an alternative to anything else that's been done, it says yes. So it was a lot proposing. Okay, butter notices. I need some receipt of butter notices also. Yeah, we can send those over. We have receipts. Let's see. Did you guys pay the legal ad? I don't have a receipt for that yet. Or I haven't heard back from Wicked Local, I guess, on that. The other thing. I don't think we have either on that one. So if we need to pay it, we're happy to. I just, I haven't seen anything yet. Typically, I think they would just send it to Connor directly. Yeah. This is Connor. We can jump in. Yeah. Thanks, Emily. We submitted a receipt for that. Okay. All right. Thank you. This also, I am confused because it says property owner's signature on Chapter 194 is not signed. Although the applicant's name is Connor Davis, he signed it. So typically we always need property owner signatures on our, and I'm not sure who signed it, the front page, the first page of the chapter 194. I don't recognize that signature. So anyway. Because we have property owner and then we have applicants on the NOI, which is also a little bit different from what the other ones were. Anyway, I just want to, and then who is Christopher Catan? Chris is one of my co-workers at Metro West who did the voter notifications. Okay, because he didn't sign the affidavit either on that page. I had no idea who it was, so I wasn't sure if that was, he had just sent out the letter notices, right? Mm-hmm. Okay. So those are, I'm sort of nitpicking here, but I just want to make sure everything's complete and we're not missing anything. Okay. Questions, thoughts, comments, concerns? I think this is probably a nitpick as well, but I know there's a small deck expansion, which is within the 100 feet riparian zone closer to Hazelbrook than the existing conditions. I know it's small, but I wanted to get Linda's thoughts on that as well. Well, typically decks over lawn can be an exempt activity. I just don't know how, is it on top of lawn or is it, are you digging up the lawn to do this? I mean, I'm not sure what the height of that deck is. Can you tell me that, Brian? The deck will be several feet above grade. So there will be loam and plantings underneath it. Yeah, yeah. So yeah, usually that, you know, deck over lawn is not, is it? It is acceptable in the riverfront area. But you're right, it does say in the Riverfront Act that it should not be closer than existing conditions. Anything else? Commission? I agree with Linda's comment that, you know, to me, the cult text seems like it might be overkill for what we're talking about here and sort of an unnecessary alteration. So I guess... I don't want to hold this thing up over sort of minor nitpicky stuff. On the other hand, it sounds like there's a decent amount of information we need to get cleared up here. So for continuing, I guess my comment is I would encourage the applicant to maybe just reconsider and talk to Linda about other forms of mitigation. That, to me, just seems like an unnecessary alteration. Happy to remove it if the commission is, that's their sentiment. So there's no issue on our end to take it out. Never been asked to do that before, so this is the first. I think certainly for a larger scale project, I could see it. I think it's just given the, it almost feels like we're altering more with that than we are with the rest of the project. Yeah, because there is a big basin in the front, and that was permitted when they did the driveway, you know, put the pavers in the driveway. And so, you know, there's more dirtier waters going into that basin up front. And I mean, if there's some way of, you know, I'd much rather see reuse of the, you know, the down in the rainwater, you know, versus just dumping in the ground and, you know, being to do some, you know, low impact development kind of stuff, which is, you know, putting a green well or something I would find much more beneficial here. But again, I think we do need to meet that condition that was in previous permits, which is, you know, putting a vegetated buffer in against it. Certainly we'll take a hard look at that one. Okay, so that's where I would, I think, put the focus, you know, for this. Okay, can you mention anything else? So either way, we have a few things to clip anyway, so it's going to be continued to what, the 2nd, I'm assuming, Linda? Yes, please. Did I go with you, Brian? To December 2nd? Yep. That's correct, that's fine with us. Okay. I move to- Commission, can I get a motion then to continue under both to the 2nd of December sometime after 6.30? So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. And Sean Fares, yes. All set. Appreciate it. Thanks, Brian. Talk soon. Okay. Moving right along. We're on to stormwater and land disturbance. This is 3A. This is 80 Oxbow Road, SWLD-168. Linda. Is Ian here? I thought I saw Ian in our participant. Hi. Let me pull up the plan. Okay, so we were here about a month ago, I think, and this is a stormwater application. We are taking an existing single-family house, tearing it down, and building a new single-family house. And I think where the first hearing went was, you know, we needed to get it peer reviewed. So that peer review has come in. I'm working on the revisions now. It's a lot of details, I would say, small details, just to make sure we're conforming with everything in your bylaw. But there's a couple things in there that he asked me to get the commission's opinion on, and I just wanted to take the opportunity now to do that so that when I refile with the peer reviewer, I've kind of captured everything. And the first of those is we show a straw waddle on the plan. He wanted me to make sure that that was sufficient for perimeter erosion control. And just a reminder, we're not doing a ton of fill here. It's generally staying at grade. There's some fill in the back here. And it's very highly infiltrative soils. They're very porous. I think we dug down to like nine or 10 feet and didn't see any signs of the water table. So I'm not expecting high levels of erosion. So I just wanted to see what your thoughts were as far as wattles for the perimeter. Do you want to start with that one? Well, I mean, I'm just looking at the grade changes. It looks like you have, it's lower in the back than it is in the front. Is that going to pretty much stay that way then? Yeah, yeah, it generally runs from front to back, so you'll get a little bit in the front that's going to go into a low point here, but otherwise everything's going to run generally front to back. Okay. I mean, as, you know, I don't have a problem with straw waddles, unless, and of course we're going to have it in the conditions of the permit that if you're putting in stockpiles, those will happen to have separate erosion control around them. You know, and especially left overnight. We're happy to do that. So you guys fixated on the circular drive? Yeah, you know, part of that is because it's similar to what's there now. So I'm going to the existing plan. Yeah. It's a little more triangular than circular right now, but they do kind of have that feature and they want to retain that. So that's why we've done it that way. And those are two, you have two legitimate curb cuts then, you know, from DPW. One of them wasn't just cut on your own and added without a permit. Not that I know of. You might want to ask because typically DPW doesn't give out curb cut, two curb cuts per property. Agreed. They bought this property, I want to say in 2022, and it was like that when they bought it. So I don't know how far back this was put in. Yeah, it's worth a phone call, okay, because you don't have to change your entire plan. The reason I don't like it is because it just requires so much more stormwater management when you have that much extra impervious for that much asphalt in front of your house. Yeah, I know what you mean. Yeah, I can look into that a little bit. And if the town ever puts in a stormwater utility, then, you know, you're going to get taxed on that too. You're going to be like Westford. Westford has one of those, yeah. Yeah, that might not be too far in the future. So, you know, that's always a consideration, you know. I appreciate that. Heads up. The next one that the peer viewer brought up, your regulations require one-foot contours. And I've shown two foot, because there is a decent amount of grade change on this property. I think one foot would muddy the plan up, and I don't really think it would clarify where the flow is going. I think it's pretty obvious from the two footers where the water is going. So he kind of gave me an option. He said... You can either add the one-footers or ask for a waiver from the Commission, and I guess I'm here to ask if that's something that the Commission would entertain, and I don't necessarily need to vote on it now. I don't know if I would need to give you it in writing, but I just want to see if you would be open to giving that waiver. What do you think, Cliff? I think it's fine, too. How about John? I think it's fine. Oh, okay. I think one-footers are good when you have a flat property, like a parking lot, you know, there's very small grade changes, but something like this, I think it just overcomplicates it. And then the last one is the vertical datum. So basically all the numbers, all the elevations on the plan, we've based those off of the USGS datum. 1929, which was kind of the common standard datum in the industry for a long time. And now the common datum that's being now shifted over is the North American datum of 88. And there's a difference of about, I think, a foot. And in your stormwater regulations, you require the The 88 datum, the new datum. And so our survey and all the design is based off of the old datum. And so my question is, is that a waiver that the commission would be comfortable giving?
This is Barbara's dear to her heart topic. I would say no. I would say no, too, because we want to be consistent. Every single one of our plans is NV88, and when you throw something else in there, at some point, we try to put this all together on a GIS or something, we're going to have a different datum. No, I think consistency is important here. Okay. Yeah, we can change that. It's one sort of... Command in the computer to update all the contours, and then I just have to go kind of manually change the inverts and stuff like that, but thankfully there's not too many of them. Okay, okay. Yeah, I can do that. Yeah, and that's really it. I expect to be sending in revised plans sometime, hopefully in the next week or so. Okay, we'll need it a week before our next meeting. Okay, and when is that? December 2nd. Okay. Yeah, I think we'll have it in before then. Okay. Commission, anything else? We'll let them go and see them in a second, but anything else before we let them go? All right. Sounds good. We'll see you here in a few weeks. Thank you. Thanks. The next one is 3B, 17 Gleason Lane, SWLD-174, Linda. We were contacted by the applicant's attorney today. I guess she was just recently hired as of like yesterday or today, maybe yesterday, and she just needed a little bit more time to go review the material and be prepared for a meeting and asked if we could continue it to the 2nd of December. Okay, no move. Well, we don't even need a motion. We can just throw it in our agenda then. Okay. Linda, 4A, vote to ratify 18 Lakeshore Drive Enforcement Order. Let's get into this. Oh, God. This has just been a... Not it. You can explain this one. No, really do I have to? It started last year. I don't know if I can throw up a picture or not. I might have one, but... It's a bit of a neighbor feud and, you know, that involves a fence, you know, along somebody's property line. It involves, you know, a boat and a dock and and they, you know, they want us to take action on something. And yes, the fence was never put in with a permit. It's most it's most of it's not even that section of fence is even on their property, according to the deed. But then we've also got a pontoon boat just parked along the public access. We have an unlicensed dock that's back there also. And, you know, neither of the neighbors really want to budge on this one to resolve it. I've contacted Environmental Police. They just took a pass on it and told me to call DEP, the enforcement person at the Wetlands Program. Called up Pamela Merrill or sent her all the materials. She called me up and said she took a hard pass on it also. And then sent me to DCR, who does the Lakes of Plants Program. They're the ones who, since Dudley Pond is a great pond, it's actually their, technically their property, which you would think that they would want to have some interest in. And all I got back from them is, can you prove to us that that's our property? No, I mean, this is Deadly Pond. This is, you know, there's, there's, it's just, I don't know, you know. Some high level, high level buck passing right there. What am I supposed to get the surveyor out there and say, this is probably the mean annual, mean high watermark, which is what defines the Great Pond, right? But then, like I said, the deed says his property goes 62 feet off a lake shore, which leaves this big sort of never never land that I guess nobody owns. I mean, I really don't know. You know, I mean, I was trying to, you know, I think it's the state's problem. If it's their property, it's their problem, you know, but they have absolutely zero interest in taking any role in this at all. So now we're kind of back to square one. And the suggestion was that I should send the person who. Put in the fence an enforcement order. And that's what I did. Because that's what I was asked to do. Here's my quick version of that. Linda was asked to send this enforcement order for, yes, a fence that was on our property. It's not what we didn't allow. What you don't, what I just understood, now I understand it to say, is that fence is because right on the other side of that fence, on the public right-of-way, there's a pontoon boat like parked right there. Like there's no public right-of-way, it's right there. Then there's the fence. On the other side of the fence, on the water, that same gentleman who owns his pontoon boat put a floating dock anchored there. So this guy's fence, not that two wrongs don't make it right, but this is insanity. I don't know how we send an enforcement order to the guy who built the fence because he wants to fence off what's supposed to be a public right-of-way, but now this guy's guys across the street, mind you, is the gentleman whose boat this is. So this is a clearly what happens when, as Luke said, everybody kicks the can. No one's been enforcing this. So it falls to us, and I'm happy to enforce things, but we have to enforce it fairly. So if we're going to tell this guy to take his fence down, we also have to tell this guy to move his boat and get rid of the dock, because those aren't also allowed as well, which I'm happy to do, but we've got to play fair. We can't just pick on the guy with the fence. And so I told Linda, let's rethink this. I get the knee-jerk reaction from the town is, hey, pull it down, but we need to dig a little bit further and find out why this fence is even going up. So yeah, so there's my coloring of velvet lines, if that makes sense. So, I guess my... I'm not sure any of this makes sense, Sean, and that's no fault of yours or Linda's description of the situation. It's actually hysterical. I mean, you can't, this is like a NBC cart, you know, sitcom. And so... There must be some history on that. Where is the fence? You know Robin Hood Lane, a road I think it's called, which dead ends into the pond. So this is, if you look at GIS, the house on the road. I'm looking at the GIS. It's number 18, and the house across the street, it's number 13, and the public access is something that used to be called Robin Hood Road, which, you know, was one of the, from the 1914 plan. I mean, I think there's a little bit of who squeaks the loudest gets the attention here, too, and, and, you know, Robin Hood Road. The squeaking got our attention on everybody, so everybody move your stuff. You're all, you're both wrong. What are we doing? Like, why are we discussing this? Yeah, that's where, so that's, Sean, that's what I'm sort of wrestling with, I guess, is, you know, I'm catching up here. To me, it sounds as, so just to be clear, who's asked, who requested that this enforcement order be issued? Is it the owner of the property who's got the boat parked there, or is this somebody else entirely? Yeah, yeah, and that to me is like, and I use the analogy, it's almost like someone who's like robbing the house, robbing someone's house, calls the police because the guy next door is making too much noise with a house party. So that's where I was going. I'm just trying to make sure I've got it right. To my mind, those violations might be worse than the fence. Yeah. It sounds like they probably are. So I'm with you, Sean, if I'm hearing you correctly. I'm not really comfortable ratifying or endorsing any enforcement order necessarily right now. And I think if and when we do, we should be issuing enforcement orders to both of these individuals, it sounds like. Can I back up? There's a guy at number 13 who owns the house, Gary Langley, who has a boat on Dudley Pond and a dock. He says he owns a dock on Dudley Pond. Did I send you guys that? I thought I sent that whole packet. Did I send that? It may have been to me. Was it? I was going to think, is there a way to pull up that picture? Yeah, I got pictures. Yeah, Barbara, that's it right there. Okay, I didn't see that. I'm sorry. That's why I can't. In vision of what it looks like because I didn't get to the picture. So the dock is off to the left of the boat on the picture. You can see like a blue dock back there. Yeah, it's complicated. And that's why I wanted the state's input on this because shouldn't they be licensed? Shouldn't that dock be licensed under Chapter 91? And I can't even get an answer from the state from that, from their waterways program. Who owns the dock? The guy at 13. Guy at 13. He has no right of way to the dock. Yeah. Yep. That's kind of my point. Sean, you better get out there. Right? You're the biggest guy we got. Come on. Uh-oh. We're in trouble then. Yeah. But I mean, I tried to resolve this, and one of the suggestions I had was you move your dock to the other side of the boat. And he'll move his fence. You know, wouldn't that be, you know, both of them doing the right thing? And that didn't go over well. Let me just say that. And so he, you know, one of the neighbors ran straight to the town manager's office to have him resolve it. And so now it's back to conservation again. So it's resolved. If you call both of these people in and say, look, you can do this. Or we're going to ask you to take the fence down and take the dock out and take the boat out. Now, what do you want to do? I nominate you to do that. Okay, Cliff, I'll try for months to do this. Okay. Yeah, so Cliff, I'm with you. I think also behind the scenes, that's been basically approached. And so I think the easiest thing to do is reset this whole thing as if we just found out about this whole thing, send out two new enforcement orders. One to the fence. Hey, before we ratify it, come talk to us about it. And one to this Gary guy with the dock and the boat. Hey, before we ratify it, come talk to us about it. And then from there, they talk to us. We can work something out, which again is kind of a hard time. It's kind of like squatters rights kind of a deal. King Solomon will help us, right? We'll just have him drop down for the meeting. But that's the right thing to do. Have them both show up at the meeting. Have them talk about it. Let's have a rational adult approach here. Right. So, Linda, how's that for, that way you don't have to get involved and, like, have to worry about, like, interacting. You can just send, you know, enforcement, whatever, and CC me on it so that, you know. Well, I mean, we did get an email from Tom Faye. He's, he would like to set up a meeting. Tom and I are having, yeah, a call with Chris. Go ahead. With you and I. With the fence guy, yeah. Because he hasn't really gotten his chance to say his side of the thing. We've only heard the other side, so. Right. I guess my point is that's for Chris and we can talk about Chris's fence or whatever. But at this point, Gary, the doc and the boat guy across the way, needs an enforcement order. So he understands, oh, you're also in violation. You need to come talk to us. And so I guess between now and time that we have this chat with Chris and bring him in, can we write up an enforcement order, send it to Gary and get his attention to say, hey, now we need to have you come talk to us as well. Well, okay, well, here's where I need Luke input for. It's actually a chapter, it's a Chapter 91 license violation. It's not really ours, you know. I mean, theoretically, it's probably both. I mean, certainly they'd need a Chapter 91 license. I would expect they'd need some sort of a permit from us, or at least a determination. Don't we typically permit docs? Yeah, but that's been there forever. I don't know if there was a permit originally for that doc or if it's been there since grandfather lived there. I don't know. Well, we're about to find out because you have to prove it. And so we'll find out real quick. Yeah, I mean, right. Linda, if we don't have any record of it, then to me that suggests that there was never any permit. Let's, you know, we can be proven wrong, but, you know, it's complicated, so. Okay, so I guess, so I guess, are we all saying, I think we're saying, and please, I don't want to summarize, if not correct, we're going to hold off on ratifying this enforcement order to the fence guy, Chris, until he comes and talks to us. Lindsay will reach out and say, hey. Come talk to the Commission before we ratify this. At the same time, between now and the second, Linda's going to send an enforcement order to Gary, the boat and the dock guy, saying, hey, you can't be doing this, or if you can, please show us how this is possible. Either way, we'll have both of this. Depending upon, Linda, if you think they're... Contentious. They can have their own separate like, you know, little hearings or whatever, but let's just get this thing going. Should we let both of them know that we've issued the same thing to the other guy? I don't think that's terribly appropriate, really. I think. Okay. I mean, they'll find out when they're at the meeting in a second. That's our agenda. So they'll find out in their own accord. Yeah. Yeah, I'm a little fearful of how this is going to go over. Say, Ellen, you're what? Sorry? I'm a little fearful how this is going to, this is not going to go over well. Fearful? The enforcement order. I mean, I think that's just, we're just fueling the fire here, you know, for this situation. And I was hoping that we could just... You know, do something, you know, you know, have somebody agree that they're both going to do something, which is like I said, remove the fence, move the dock, you know, and then and that and just avoid this whole, you know, enforcement order and. Again, I haven't had the best experience with this project or this situation. Linda, that's all the more reason, I think, just to do it this way. And let us sort of take that off of your plate. I think it's appropriate for us to do it. Hey, Luke, I'm the one here in the office who's going to, you know. All right, I get it, but I'm just saying. I don't know what other way there is to go here. Yeah, I don't either. I don't either. And just make sure you see when it sends out, see, see me on it. Openly see, see me on the email. So if there's any chatter between now and our next meeting, I'm happy to chat. Okay. So, okay. All right. So we all good with that? Do we want to take it? Here, I'll tell you what. Let's take a quick vote. So this is 4A, a vote to ratify 18 Lakeshore Drive Enforcement Order. I'm assuming we're making the motion it'll be a nay vote. For those who don't want to enforce it and hold it off, it'd be a nay vote, right? And for those who would want it, it'd be a yes vote. Is that how we want to do this? But it's a nay vote because... We want to hold off and talk to, if you want to hold off and talk to Chris, we'll be basically, you know, the enforcement order has been sent. So Chris has this in his hands. We haven't ratified, so yeah, we agree this is a legit enforcement order. So if we don't want to do that, hold off, we would vote nay, no, ratifying it tonight and hold off till we talk to Chris. So sorry, Sean. Please, Luke. Lawyer alert. Yes. If we want to ratify it, we have to do it tonight. Okay. I can tell you I've won cases nullifying enforcement orders because the commission did not ratify it at their next regularly scheduled meeting. That's what the regs require. So we have to do it tonight unless we could vote not to and Linda could reissue one, but that sort of seems like it's un... Necessary paperwork. But if what we're saying is we'd like to have a conversation before we ratify, I think we do need to go through that procedural step of having it reissued basically before the next meeting. Right. Thank you for that. Please always lawyer me. My opinion is giving more kind of context to this is I also feel personally that this enforcement order was Linda was told to send out this enforcement order not because it was the right, in my opinion, the right thing to do because of the, it was because one person was being squeakier than the next and therefore it was almost an appeasement based on my understanding of how this went out, right? The fact that Chris has an enforcement order but the boat and dock gentleman doesn't just because he's let. Right. And so I'd rather say, no, I don't agree with this enforcement order at this time. Let's talk to Chris. Let's talk to the guy across the street. And if at that point we can't get what we want, then we have to unfortunately have a new enforcement order that we've at least attempted and given best effort on both ends. So that would be my personal thought why we wouldn't do it tonight. Yeah, and like, I think kind of in that vein, Sean and Cliff, you might have just been alluding to this. I mean, typically, right, you know, my preference would be before we jump to enforcement order, if we can send kind of a notice violation type letter, hey, and ask them to come in. So maybe that's the move is we don't ratify this tonight. We send out those letters in advance of our next meeting. We ask them to come in. And basically have the conversation. I mean, they won't have an enforcement order hanging over their head at the moment, but the message will be, this is where we're heading if we can't resolve this in a reasonable fashion. Chris got a cease and desist last year for the fence, and then it was followed up for a violation letter. So this is step three already in the process, the enforcement order. Which again, to a good point, we need to always go back to if appropriate and when appropriate, but I would expect that same type of action to be taking on hypothetically this doc and boat if the same violation is occurred, right? Because one person's louder and more aggressive doesn't mean they're right. And so I just want to make sure we're being very equitable in how we deliver our opinions. So, yeah, I'm with you, Luke. Let's not do an enforcement order. Let's send a letter. Hey, we don't want to send an enforcement order. Please come talk to us. Let's not get there. And if we have to, we have to. And yeah, I'm with that. I like that. But again, this has already gotten the enforcement order. OK, so I can I can. I'm happy to email and say we didn't ratify it. We do. The commission disagrees with it at this time. We come talk to you first. And if we have to go out there, we will. So I'm happy to say that. That's fine. Can I go look at this in person or will I get full of buckshot? We can order your police detail if you want, Cliff. You can just take a boat. You can see it from the water. It's right there. You can just drive by Lakeshore. You'll see it, Cliff. You can see it from the street. It's a private street, right? Is it that section? I don't even know. I can't remember where it starts and stops. Yeah, I mean, this is public access anyway. You can walk it at least. Yeah. Yeah, that's the buckshot problem. Okay. All right. So I guess let's take a vote. So how about this? I move that we not ratify the enforcement order issued in this matter. I like that. Thank you. Do I hear a second to Luke's motion? Yes, second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? Yes. John Storer? Yes. Sean Ferzi? Yes. Thank you. Do we need a motion for you to send them an email, Sean? Not, I'll, you're welcome to take one, I don't think so, I'm happy just to give. Yeah, okay. Yeah, I'll send you his email address tomorrow, okay, Sean? Okay, thank you. This is what you signed up for, right, Sean? Yeah, this is what you made the big bucks for. I signed up for Cliff, okay, really. We all signed up for this. I apologize to all. I thought I could get here more close to like a halfway through point, but I see now we are basically done, but I'm here now. Well done, Jen. Well done. Well played. You're on the minutes as having been here. Well done. Well done, Matt. I know. Well, when I realized you were at, I was, I'm here now. Please catch the second half. I apologize to all. This is at least the fun part, Shannon. We're going to talk about the CPC application. Let's do the vote to support CPC. Linda, kick it off, please. You must have gotten the drafts in your agenda packet. I'm going to let, is Emily still on? Emily wants to take over this section. She wrote all the CPC applications. So for this application, right now it's just one. We kind of lumped kind of two sedge meadow restoration projects into one application, which includes converting part of the existing field to more pollinator habitat and then also a bat monitoring section. I know that the, right now there is kind of a, already at Sedge Meadow, if you were to go down from Black Cat Farm, part of the field is converted to pollinator meadow, or pollinator kind of habitat, and we just want to expand that using a brush mower, which would be a lot faster for Brian at least. And then for the bat monitoring kind of side of it, at Snakebrook Dam. We found out that there was six out of the nine bat species in Massachusetts were present on the Snakebrook Dam, and we've just been trying to expand that to other properties to see what bat species are present there. So by purchasing Sonobat, which is a bat kind of recognition software, we'd be able to really easily identify a lot of different bats that we have at Sedge Meadow particularly. That's cool. Yeah. Sorry, just because when the sun goes down, so Sedge Meadows behind me, and in the summer when the sun starts setting, like I'll come downstairs and I'll just look outside and it'll take like five to ten seconds and I'll see a couple bats. But of course, I only know them as bats. I didn't know there were nine different bats in Massachusetts. So anyway, it just was kind of cool because I like to look for them. I'm like, eat the mosquitoes. Yeah. And we also, yeah, the third kind of last part is environmental education. So adding some signage for both the pollinator kind of section and also about bats because there's a lot of misinformation about bats out there. So I think that would be really good. I took a little webinar from, I think, Mass Audubon on bats and they are so cool and they deserve an image restoration because they really do. That's, I love that. But the thing is that we've lost about 95% of the population, you know, and that was due mainly to like the white nose syndrome, which is why many of these species are either endangered or threatened. And, you know, we've always been working with birds, you know, and trying to improve the habitat. Tat for Birds, because we do have expertise on our staff, but I think it's time that we start branching out a little bit more, and that's when we learned so much about bats through the Snakebrook Dam Project, we decided, well, maybe we can expand on this a little bit and see what we have in Wayland. We already know the entire... You know, we know exactly what we have when it comes to birds because Brian's out there almost daily doing, you know, birding. But the bats, they were somewhat ignored. And I think it's time to give them a little bit more time in the, you know, notoriety here. So what about that? We had another CPC application, right, which was to... Just expand on the ADA trail for Sherman Bridge, right? Actually, I did talk to the previous, or the, what's it called, landscape company that we had contacted before in like 2023, and the price didn't change that much, so I don't think we would need additional funding for that. Oh, okay, okay. At first, we thought we were going to have to do it by ourselves, you know, the ADA trail, which is beyond, we don't have really the equipment to do that, so that we thought we might need a little extra money to have the contractor do it, and it sounds like we don't need that right now, so. Where would, did you say this was at Sage Meadow? What, the restoration? The ADA Trail. No, that's at Sherman Bridge, at 27 Sherman Bridge. Oh, 27 Sherman Bridge, okay. Yeah, so there's an existing driveway there. It's really flat. And then it goes up a very steep hill. And where it stops, where it's still flat, we were going to convert that into more of an ADA trail that leads to a vernal pool on the Trout Brook side of the property. So we've carved a little path that goes from the driveway to the vernal pool. We wanted, again, putting a little bit of education in there, like vernal pools, signage, maybe a bench or something. And so it will be a fairly short path, but it's going to be... And we have parking there also, so it would make it a little bit easier for people with disabilities to get out there and at least, you know, enjoy the vernal pool out there. Cool. I like it. So we're looking for folks to support our CPC application. We had talked, and we didn't get very far on this last time, about doing some sort of a spiffing up project on some of the conservation land with CPC funds. Did that? Thought process get anywhere? It does, Cliff, but we're just so limited with the resources that we have. You know, I only have one and a half staff for managing 1,200 acres, so... I'm going to get you some help here with these other monies. That's the whole thing. Yeah, but we can't hire staff with CPC funding, you know, so... I'm going to hire a contractor. Yeah, yeah, yeah. Yeah, I think we have to, you know... If we did that, what I'd like to do is more of a real comprehensive, you know, like, let's look at the project and not just because, you know, so much of our money right now goes to Herd Farm. We have so many visitors there. We have, you know, it's a beautiful, beautiful spot. And it seems like that we dump probably 80% of our funding from CPC and from our budget. To herd, you know, and I think it's time that we start, you know, you know, divvying out the money a little bit more evenly to some of the other properties. And I think that's what we have to get a little bit more, a little bit more thought process to that. And I'm looking for all kinds of input from you guys. You know, anybody, I know Sean walks the properties a lot too. You know, what is it that... How can we make improvements to our current properties that we have? Or not at all. I mean, I prefer some of them are just left alone and go back to nature, really, in some cases. We're doing, you know, like herd, we're still going to go over there and cut a whole bunch of bittersweet out of the big oak trees there. That's one of our projects this fall. And, you know, we can expand on that to other properties, too, because invasives are a huge, huge problem. You know, doing, you know, plant inventories, invasive plant inventories, that's something else we could probably do with help and see if we can somehow prioritize. I'd be supportive of that. I just don't think we should just let it drop. No, no, no, no. I mean, we have some thought process. Good idea. Yeah, you bet. Yeah, and I mean, we talked about doing a tree canopy study. Wellesley did that at some point. And, you know, that's done with an outside contractor, too. Lots of aerial photography coming up with a really nice survey of, you know, where the extent of our canopy is. There's all kinds of things that we can do. Again, you know, we're just so limited with the time we have here in the office and in the field. Castle Hill is an awful lot of invasives. That's a beautiful place. And it's easy for some people to walk in the lower, lower path. Which one's that? I missed the first one. Houston. Castle Hill. Oh, Castle Hill. Okay. Yeah. Yeah, that's a great one. I mean, we talked about putting together a cross-wheel and path at some point, you know, and, you know, that was always a dream of mine. And working with Janot, she had all the bridal paths and cart paths marked out and mapped at some point. And, you know, it's... Again, that's just a huge project. We tried to get an intern to do that, and we couldn't even find anybody in environmental planning school, in grad school, to help us with that for one summer. Nobody seemed to take an interest in that. In the old days, when I first started, we had volunteers. And they actually took care of the trails that they volunteered for, like Mike Patterson, all he did at Upper Millburg. And we had other volunteers. The former... Representative, what's her name? She used to mow the lawn, mow the pass with her lawnmower at Sedge Meadow going from her house. Oh, I think I know who you're talking about. I can't come up with the name. We don't have volunteers and we should be looking for volunteers. There must be people out there. Yeah, it's not a bad idea. We can start trying to think, like, I think it's worth trying to think about. We can, like, sort of as a separate thing, like, this is achievable for us to set up a program of some kind, me and another couple of you. We could think about it, like, how that would work, and maybe there's a way to find that energy again. Not for CPC or anything, but, like... No, they're basically like trail stewards, like SVT has trail stewards. Barbara, we used to have that for here. We used to have stewards who kind of volunteered for us for Concommon to do things. Yes, I'd love it to do that. I think the easy way to start that is a quick email or a flyer to like the COA who, you know, who's got free time, wants to help maintain our beautiful trails. They should, COA should really be, we should be on their radar. They're trailed right by the Sudbury River they were talking to us about. So we should be top of mind. I think that'd be an easy, low-hanging fruit to start with. We'd like to have, you know, three or four volunteers a year help us with low-maintenance, easy type of stuff. So, yeah. So I guess I'm with you, I guess, how we start it or who presents it or whatever that we need to think through that. Yeah. Okay, if I came in and picked you guys, we can come up with like a list of what is actually doable for volunteers so that we don't send people out there with chainsaws. No, I mean, like we occasionally get, you know, sort of people who just come to us and say, it looks like, you know, this, this, the boards on this on the boardwalk had heard me replacing. And I'll offer to pay for the wood and they do the work. But it's just sort of more episodic than it is, you know, having a consistent program. And we've, you know, we've tried with the Boy Scouts. I have made a huge list of projects that Eagle Scouts could do. And I've gotten zero return on any of those probably for the last five, six years now. So, you know, it's been kind of frustrating because, you know, there's always the initial enthusiasm and then it never turns into anything. So, and I think people are just so busy these days, you know, they just, they just, a lot of people just don't have the spare time, you know, so, but, yeah, I mean, you know, managing a volunteer program is, can be time consuming also, you know, so. You don't need a, Chainsaw always, because you can go out with your, I maintain the trail for Great Meadows at Herd Pond for decades, and I would use my regular saw if, if, and If it was too big, someone could do a chainsaw, but I took care of those trails for years. Now they hardly exist. Let me give a shout out to two of our most really valuable volunteers. It's been Bill Green and Steve Weitzman, who have managed the orchards at HERS for decades now. They started the new orchard, which is in the Westfield, that has the peaches, plums, pears, pawpaws, you name it. They do a fantastic job. We try to support them as much as we can with materials that they need, fertilizers and things. We're going to buy them a little bit of equipment this year. But they also took over the management of the old apple orchards, which is on the east field. So they've been doing a lot of work over there, too, on these ancient, decrepit trees. And we've replanted a lot of them with heirloom varieties and stuff. And they've been so dedicated for years and years and years. So everybody should go out there and really appreciate what they do. Because, I mean, now the fruit is all gone at this point. They had a great peach year this year, so. The pears were good. The pears are always good, yes, yes. The one we do is kind of a catch-all to originally Cliff started this question with CPC. Why don't we, and maybe their email, Linda or Emily, have like a running one page for this year, maybe like now to the end of the first quarter. Here, you know, with our fairy godmother, we're to grant us all this. We'd want new signage here. We want this here and everything. And then we can then break it down to, okay, how much do we want to throw on a CPC list for what year? Like almost like a two or three year planning list. And what could a COA volunteer or an Eagle Scout do? And literally just go to these organizations. We need someone to do this, A, B, and C. And so I guess for homework, can we all maybe email to Linda or to Emily over the next few months the wish list of what we want to see done on our trails? Cliff, what you're talking about? And we'll just start piecing that together. Does that work with everybody? Can I have it all in one spot? Are we still voting on the current CPC proposals for the past? We do that because then we can write it into the application that the commission supported it. Right. So, everybody good with that? Nope. Okay. So, for now, I guess, can we get a motion to, and by the way, thanks again, Emily, for putting that together there, a motion to support the CPC application, please. So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin? Yes. Luke Legere? Yes. Barbara Howell? Yes. Cliff Lewis? No. John Storer? Yes. And Sean Fersey? Yes. Okay. Thank you, folks. I don't see any more public comment. Any hands up? Nope. Six minutes. Babs, how are we looking for October 21st minutes? I spoke to just today I gave my comments. Were they substantial or were they just little I's and T's? They were fine. Okay. So do you want to make a motion then to approve? Anybody else have any thoughts on the 21st of October? Emily does a good job. Yes, she does. Yes, she does. Okay, everyone approve the minutes of October 21st, 2026 with Barbara's slight additions and edits. So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Roll call, please. Lisa Aubin. Yes. Luke Legere. Yes. Barbara Howell. Yes. Cliff Lewis. Yes, sir. John Storer. Yes. Shannon Fischer. Yes. Shannon Fischer, yes. Thank you. I think I missed you last time, Shannon. Sorry. I missed most of the meeting. It's cool. That's what you get. Very on time, Shannon. Very good. Now just sit here and just watch us take minutes. Okay. That's all I got on my end. Anybody else? Anybody else on their end? Oh, I just want one quick update. Just today I got an application for the one pheasant run tree removal violation. So that finally came in after a few months. But I still have a whole other list of people that I need to send out letters to. Oh, goody. Oh, goody. I know. It continues. Okay. That's all we got. Can I take a motion then to adjourn for the evening, please? So moved. Thank you, Luke. Do I hear a second? Second. Thank you, Cliff. Last roll call of the night, please. Lisa Aubin. Yes. Luke Legere. Yes, indeed. Barbara Howell. Yes. Cliff Lewis. Yes, sir. John Storer. Yes. Shannon Fischer. Yep. Sean Ferser, yes. We are adjourned, folks. Thank you. Bye, guys. Bye, everyone.